ALFREGO BUILDERS & SUPPLY (19284) / RELY CONSTRUCTION & SUPPLY INC.(FORMERLY: RELY CONSTRUCTION AND SUPPLY)
Contractor 0fb9d311d68246b2c5ab
Overview
PhilGEPS awards
₱0 · 0 awards
DPWH contracts
₱1.60B · 26 contracts
Rank by recorded value
#1,752 of 23,487
More info
First record
May 3, 2017 (9 yrs 6 mo ago)
Latest record
Mar 12, 2020 (6 yrs 8 mo ago)
DPWH contractor code
10433
Where they work
Latest 25 from a total of 26 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 20LC0015 | 6 yrs 8 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAUG RIVER, PROTECTING TAGUM-PANABO CIRCUM. ROAD, ASUNCION, DAVAO DEL NORTEFlood Control and Drainage | Completed | Davao del Norte DEO | ₱57.9M |
| 20LC0058 | 6 yrs 8 mo ago | CONTRUCTION OF LASANG RIVER FLOOD CONTROL (UPSTREAM OF LASANG BRIDGE),PANABOFlood Control and Drainage | Completed | Davao del Norte DEO | ₱47.5M |
| 20LA0063 | 6 yrs 8 mo ago | CONSTRUCTION OF REVETMENT ALONG MASARA RIVER LEADING TO HIJO RIVER, BRGY. ELIZALDE, MACO COMPOSTELA VALLEY PROVINCEFlood Control and Drainage | Completed | Davao de Oro 1st DEO | ₱29.4M |
| 19LC0041 | 7 yrs 3 mo ago | CONSTRUCTION OF CONCRETE REVETMENT ALONG LASANG RIVER (UPSTREAM OF LASANG BRIDGE), PANABO CITY, DAVAO DEL NORTEFlood Control and Drainage | Completed | Davao del Norte DEO | ₱89.4M |
| 19LH0013 | 7 yrs 4 mo ago | CONSTRUCTION OF DIKES ALONG DAVAO RIVER, MARILOG, CALINAN, TUGBOK, 3RD CONGRESSIONAL DISTRICT, DAVAO CITYFlood Control and Drainage | Completed | Davao City 2nd DEO | ₱96.5M |
| 18LB0003 | 8 yrs 4 mo ago | CONSTRUCTION OF DRAINAGE STRUCTURE ALONG DAVAO CITY DIVERSION ROAD K1508+280-K1510+905, DAVAO CITYFlood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - PCCP | Completed | Davao City DEO | ₱57.8M |
| 18LB0076 | 8 yrs 5 mo ago | INSTALLATION OF GABIONS AND MATTRESSES FOR SLOPE PROTECTION AND CUT -OFF CHANNEL STARTING POINT AT SFlood Control and Drainage | Completed | Davao City DEO | ₱80.6M |
| 18LB0079 | 8 yrs 5 mo ago | INSTALLATION OF GABIONS AND MATTRESSES ALONG DAVAO RIVER WAAN FLOOD CONTROL STA. 18+387-STA 18+904, RIGHT BANK, DAVAO CITYFlood Control and Drainage | Completed | Davao City DEO | ₱44.1M |
| 18LA0094 | 8 yrs 5 mo ago | CONSTRUCTION OF REVETMENT BRGY. NAPNAPAN, PANTUKAN, COMPOSTELA VALLEY PROVINCEFlood Control Structures, Waterway | Completed | Davao de Oro 1st DEO | ₱33.9M |
| 18LA0124 | 8 yrs 5 mo ago | CONSTRUCTION OF REVETMENT ALONG TAGBALAOBAO RIVER, PINDASAN, MABINI, COMPOSTELA VALLEY PROVINCEFlood Control Structures, Waterway | Completed | Davao de Oro 1st DEO | ₱32.8M |
| 18LC0022 | 8 yrs 6 mo ago | CONSTRUCTION OF CONCRETE REVETMENT ON STEEL SHEET PILES AND CONSTRUCTION OF EARTH DIKE ALONG SAUG RIVER, INCLUDING ROW, CANATAN SECTION, ASUNCION, DAVAO DEL NORTEFlood Control: Construction - Dikes/Levees, Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry) | Completed | Davao del Norte DEO | ₱58.9M |
| 18LB0006 | 8 yrs 6 mo ago | ROAD WIDENING OF DAVAO-BUKIDNON ROAD INCLUDING ROW, K1698+629-K1698+448Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - PCCP | Completed | Davao City DEO | ₱51.1M |
| 18LC0020 | 8 yrs 7 mo ago | CONSTRUCTION OF CONCRETE REVETMENT ON STEEL SHEET PILES ALONG SAUG RIVER INCL. ROW, DAVAO DEL NORTEFlood Control and Drainage | Completed | Davao del Norte DEO | ₱93.3M |
| 18LC0021 | 8 yrs 7 mo ago | CONSTRUCTION OF CONCRETE REVETMENT ON STEEL SHEET PILE ALONG SAUG RIVER PROTECTING TAGUM-PANABO-CIRCUM ROAD INC. ROW, ASUNCION, DAVAO DEL NORTEFlood Control and Drainage | Completed | Davao del Norte DEO | ₱93.1M |
| 18LB0028 | 8 yrs 7 mo ago | INSTALLATION OF GABIONS AND MATTRESSES ALONG MATINA RIVER, BRGY. MATINA PANGI, DAVAO CITYFlood Control and Drainage | Completed | Davao City DEO | ₱49.0M |
| 18LB0082 | 8 yrs 7 mo ago | INSTALLATION OF GABIONS AND MATTRESSES ALONG DAVAO RIVER BASIN WAAN FLOOD CONTROL STA.17+460-STA.17+789 RIGHT BANK, DAVAO CITYFlood Control and Drainage | Completed | Davao City DEO | ₱29.4M |
| 18LD0037 | 8 yrs 8 mo ago | CONSTRUCTION OF CONCRETE REVETMENT, SULOP, DAVAO DEL SURFlood Control and Drainage | Completed | Davao del Sur DEO | ₱65.5M |
| 18LB0032 | 8 yrs 8 mo ago | INSTALLATION OF GABIONS AND MATTRESSES ALONG DAVAO RIVER (F. TORRES BRIDGE SECTION) STA. 9+640-STA. 10+140 RIGHT BANK, DAVAO CITYFlood Control and Drainage | Completed | Davao City DEO | ₱44.1M |
| 18LB0078 | 8 yrs 8 mo ago | INSTALLATION OF GABION AND MATTRESSES ALONG DAVAO RIVER NASIN TIGATTO FLOOD CONTROL, STA. 17+847-STA. 18+190, STA. 18+440-STA.18+626 LEFT BANK, DAVAO CITYFlood Control and Drainage | Completed | Davao City DEO | ₱44.1M |
| 18LH0003 | 8 yrs 8 mo ago | RIVER TRAINING WORKS AT WANGAN RIVER (UPSTREAM SECTION), WANGAN, CALINAN DISTRICT, DAVAO CITYBridges | Completed | Davao City 2nd DEO | ₱47.5M |
| 18LH0010 | 8 yrs 8 mo ago | CONSTRUCTION OF CONCRETE REVETMENT ON STEEL SHEET PILES ALONG TALOMO RIVER, RIVERSIDE-TUGBOK SECTION, DAVAO CITYFlood Control and Drainage | Completed | Davao City 2nd DEO | ₱47.5M |
| 18LH0013 | 8 yrs 8 mo ago | CONSTRUCTION OF CONRETE REVETMENT ON STEEL SHEET PILES ALONG LIPADAS RIVER, CROSSING BAYABAS, TORIL DISTRICT, DAVAO CITYFlood Control and Drainage | Completed | Davao City 2nd DEO | ₱47.5M |
| 18LH0014 | 8 yrs 8 mo ago | CONSTRUCTION OF CONCRETE REVETMENT ON STEEL SHEET PILES ALONG TALOMO RIVER, CALINAN SECTION, CALINAN DISTRICT, DAVAO CITYFlood Control and Drainage | Completed | Davao City 2nd DEO | ₱38.0M |
| 17LB0200 | 9 yrs 1 mo ago | REPAIR/REHAB (ASPHALT OVERLAY) ALONG DAVAO CITY DIVERSION ROAD (PANACAN SECTION) K1498+299-K1499+566Roads | Completed | Davao City DEO | ₱49.5M |
| 17L00122 | 9 yrs 6 mo ago | CONC./WIDENING (SUBSTANDARD TO STANDARD) OF BRGY. FATIMA,PAQUIBATO DIST. GOING TO BRGY. DALAGDAG-LAMRoads | Completed | Region XI | ₱140.3M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.