DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY (39808) / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)
Contractor 2c82e6bb7276dc71d266
Overview
PhilGEPS awards
₱0 · 0 awards
DPWH contracts
₱1.95B · 17 contracts
Rank by recorded value
#1,494 of 23,487
More info
First record
Mar 2, 2020 (6 yrs 8 mo ago)
Latest record
Mar 17, 2025 (1 yr 7 mo ago)
DPWH contractor code
13722
Where they work
Latest 17 from a total of 17 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 25B00047 | 1 yr 7 mo ago | OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - MALALAM BR. (B01121LZ) ALONG MAHARLIKA HIGHWAYGAA 2025 OO-1 | On-Going | Region II | ₱253.5M |
| 25B00027 | 1 yr 8 mo ago | OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ILAGAN CITY BYPASS ROAD, ISABELAGAA 2025 OO-1 | On-Going | Region II | ₱115.2M |
| 25BE0025 | 1 yr 8 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES- CONSTRUCTION OF ILAGAN-DIVILACAN ROAD, PGAA 2025 SSP | On-Going | Isabela 1st DEO | ₱144.7M |
| 25BE0026 | 1 yr 8 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF ILAGAN-DIVILACAN ROAD, PGAA 2025 SSP | On-Going | Isabela 1st DEO | ₱144.7M |
| 24BE0149 | 1 yr 10 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF ROAD ALONG BARANGAY BUBUGGAA 2024 SSP | On-Going | Isabela 1st DEO | ₱96.5M |
| 24B00100 | 2 yrs 2 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ILAGAN-DIVILACAN ROAD, ILGAA 2024 SSP | On-Going | Region II | ₱192.8M |
| 24B00034 | 2 yrs 7 mo ago | OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - JCT. DELFIN ALBANO ROAD INCLUDING BRIDGE (CANSAN - BAGUTARI BRIDGE)GAA 2024 OO-1 | On-Going | Region II | ₱90.4M |
| 24B00026 | 2 yrs 7 mo ago | OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ILAGAN CITY BYPASS ROAD, ISABELARoads | Completed | Region II | ₱101.2M |
| 23B00033 | 3 yrs 5 mo ago | OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT -CONSTRUCTION OF BYPASS/DIVERSION ROADS - ILAGAN CITY BYPASS ROAD, ISABELAGAA 2023 OO-1 | Completed | Region II | ₱112.9M |
| 21B00063 | 4 yrs 7 mo ago | LOCAL PROGRAM-LOCAL ROADS AND BRIDGES - LOCAL ROADS-CONSTRUCTION/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS: CONSTRUCTION OF CONCRETE ROAD INCLUDING SLOPE PROTECTION ILAGAN-DIVILACAN-PALANAN-SAN MARIANO DINAPIGUR ROADRoads | Completed | Region II | ₱96.2M |
| 22BG0101 | 4 yrs 7 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REPLACEMENT OF PINTOR BRIDGE, GAMU, ISABELABridges | Completed | Isabela 3rd DEO | ₱23.5M |
| 22B00004 | 4 yrs 8 mo ago | OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BYPASS AND DIVERSION ROADS- ILAGAN CITY BYPASS ROAD, PACKAGE 1, ISABELARoads | Completed | Region II | ₱87.1M |
| 22B00016 | 4 yrs 8 mo ago | OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD: BRIDGE - WIDENING OF PERMANENT BRIDGES - ARCON BRIDGE (B01130LZ) ALONG DAANG MAHARLIKA (LZ)Bridges | On-Going | Region II | ₱155.1M |
| 21B00009 | 5 yrs 3 mo ago | ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD SYSTEM (PACKAGE 1)Flood Control and Drainage | Completed | Region II | ₱75.6M |
| 21B00010 | 5 yrs 3 mo ago | ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD SYSTEM (PACKAGE 2)Flood Control and Drainage | Completed | Region II | ₱74.9M |
| 20B00009 | 6 yrs 8 mo ago | OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-RIVER BANK PROTECTION FOR LOWER CAGAYAN RIVER, SAN PABLO, ISABELA (UPSTREAM)Flood Control and Drainage | Completed | Region II | ₱80.3M |
| 20B00010 | 6 yrs 8 mo ago | OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-RIVER BANK PROTECTION FOR LOWER CAGAYAN RIVER, TUMAUINI, ISABELA (UPSTREAM)Flood Control and Drainage | Completed | Region II | ₱100.9M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.