ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)
Contractor 38c50f3a848cfd2ec490
Overview
PhilGEPS awards
₱0 · 0 awards
DPWH contracts
₱38.05B · 895 contracts
Rank by recorded value
#50 of 23,487
More info
First record
Jan 27, 2016 (10 yrs 9 mo ago)
Latest record
Jul 22, 2025 (1 yr 3 mo ago)
DPWH contractor code
Not in the DPWH list
Where they work
Latest 25 from a total of 895 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 25GA0133 | 1 yr 3 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AKLAN RIVER, BARANGAY CAMANCI NORTE, NUMANCIA, AKLANFlood Control and Drainage | On-Going | Aklan DEO | ₱88.3M |
| 25OE0186 | 1 yr 5 mo ago | CONSTRUCTION OF MULTI - PURPOSE BUILDING ZONE 1 - 12, PHASE 6, TONDO DISTRICT 1, MANILAGAA 2025 SSP | Terminated | North Manila DEO | ₱0 |
| 25HE0093 | 1 yr 5 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF POBLACION FLOOD CONTROL, SANTANDER, CEBUBridges | On-Going | Cebu 2nd DEO | ₱94.5M |
| 25CD0195 | 1 yr 5 mo ago | REHABILITATION OF VARIOUS PUMPING STATIONS ALONG MAJOR RIVER BASINS, MARILAO & MEYCAUAYAN RIVER, BULACANGAA 2025 OO-2 | On-Going | Bulacan 2nd DEO | ₱47.5M |
| 25OA0053 | 1 yr 5 mo ago | CONSTRUCTION OF ESTRELLA PUMPING STATION (PHASE 1), NAVOTAS CITYGAA 2025 OO-2 | Terminated | Malabon-Navotas DEO | ₱5.9M |
| 25OA0054 | 1 yr 5 mo ago | CONSTRUCTION OF ESTRELLA PUMPING STATION (PHASE 2), NAVOTAS CITYGAA 2025 OO-2 | Terminated | Malabon-Navotas DEO | ₱0 |
| 25OE0170 | 1 yr 5 mo ago | CONSTRUCTION OF RETARDING BASIN AT ESTERO DE MAGDALENA (PHASE II), MANILA CITYGAA 2025 OO-2 | Terminated | North Manila DEO | ₱8.6M |
| 25A00264 | 1 yr 7 mo ago | SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF ROAD, BARANGAY NIBALIW NARVARTE - BARANGAY CAYANGA, SAN FABIAN, PANGASINANGAA 2025 SSP | On-Going | Region I | ₱46.8M |
| 25E00254 | 1 yr 7 mo ago | BRIDGE PROGRAM- LANGOGAN BRIDGE (B00201PW) ALONG PUERTO PRINCESA NORTH ROAD, PUERTO PRINCESA, PALAWANGAA 2025 OO-1 | On-Going | MIMAROPA Region | ₱16.6M |
| 25OA0073 | 1 yr 7 mo ago | CONSTRUCTION (COMPLETION) OF BRIDGE, BRGY. NORTH BAY BLVD., SOUTH, NAVOTAS CITYGAA 2025 SSP | Terminated | Malabon-Navotas DEO | ₱0 |
| 25MH0027 | 1 yr 7 mo ago | CONSTRUCTION OF RIVERBANK PROTECTION/FLOOD CONTROL AT ALA RIVER, BARANGAY SALABACA, ESPERANZA, SULTAN KUDARATGAA 2025 OO-2 | Terminated | Sultan Kudarat 2nd DEO | ₱37.2M |
| 25EH0044 | 1 yr 7 mo ago | REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG CAMBIJANG BRIDGE (UPSTREAM), CAJIDIOCAN, ROMBLONGAA 2025 OO-2 | On-Going | Romblon DEO | ₱142.6M |
| 25EH0048 | 1 yr 7 mo ago | CONSTRUCTION OF ROAD, BARANGAY LIBERTAD, ODIONGAN, ROMBLONGAA 2025 SSP | On-Going | Romblon DEO | ₱55.0M |
| 24F00492 | 1 yr 7 mo ago | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-LIGAO-PIO DURAN RD-K0520+000-K0520+540, LIGAO CITY, ALBAY (3RD LEGISLATIVE DRoads | On-Going | Region V | ₱235.5M |
| 25E00183 | 1 yr 7 mo ago | CONST. OF MISSING LINKS/NEW ROADS- MINDORO ISLAND CIRCUMFERENTIAL ROAD (PUERTO GALERA-ABRA DE ILOG), PACKAGE D, STA. 0+000-STA. 0+510; STA. 3+978-STA. 4+194, ABRA DE ILOG, OCC. MINDOROGAA 2025 OO-1 | On-Going | MIMAROPA Region | ₱70.8M |
| 25CG0020 | 1 yr 8 mo ago | SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - CONSTRUCTION OF SAN ESTEBAN BRIDGE, PHASE III, MACABEBE, PAMPANGAGAA 2025 SSP | On-Going | Pampanga 1st DEO | ₱137.4M |
| 25DD0002 | 1 yr 8 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES, CONSTRUCTION OF LIPA CITY-MATAASNAKAHOY DIVERoads | On-Going | Batangas 4th DEO | ₱140.6M |
| 25GJ0016 | 1 yr 8 mo ago | CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-WATERWAYS REHABILITATION AND COASTAL PROTECTION, SECTION 1, ILOILO CITY, ILOILOGAA 2025 OO-2 | On-Going | Iloilo City DEO | ₱120.6M |
| 25OG0016 | 1 yr 8 mo ago | REHABILITATION OF FLOOD MITIGATION STRUCTURE ALONG SAN JUAN RIVER (PHASE LXIII), QUEZON CITYFlood Control and Drainage | On-Going | Quezon City 2nd DEO | ₱47.3M |
| 25OB0120 | 1 yr 8 mo ago | CONSTRUCTION OF DRAINAGE SYSTEM ALONG C-6 (BIKE LANE), TAGUIG CITYGAA 2025 OO-2 | Terminated | Metro Manila 1st DEO | ₱0 |
| 24A00606 | 1 yr 10 mo ago | DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP) LGU HOSPITALS - DINGRAS DISTRICT HOSPITAL, ILOCOS NORTEBuildings and Facilities | On-Going | Region I | ₱73.1M |
| 24A00607 | 1 yr 10 mo ago | DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP) LGU HOSPITALS - DONA JOSEFA EDRALIN MARCOS DISTRICT HOSPITAL, ILOCOS NORTEBuildings and Facilities | On-Going | Region I | ₱43.9M |
| 23KB0156 | 1 yr 10 mo ago | CONSTRUCTION OF ROAD ALONG SAYRE HIGHWAY (JCT. BUKIDNON-DAVAO CITY RD-COTABATO BOUNDARY) TO BRGY LIBERTAD, QUEZON, BUKIDNONUnprogrammed Appropriations 2024 | On-Going | Bukidnon 2nd DEO | ₱48.0M |
| 24KB0028 | 2 yrs 3 mo ago | CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG BUKIDNON-DAVAO CITY RD, K1599+000-K1601+200, QUEZON, BUKIDNONGAA 2024 OO-1 | On-Going | Bukidnon 2nd DEO | ₱29.9M |
| 24NH0067 | 2 yrs 4 mo ago | CONSTRUCTION OF SEAWALL AT BARANGAY MATHO, CORTES, SURIGAO DEL SURFlood Control and Drainage | Completed | Surigao del Sur 1st DEO | ₱48.2M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.