M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS
Contractor 489e36e7ccbe05c1f01a
Overview
PhilGEPS awards
₱0 · 0 awards
DPWH contracts
₱4.72B · 159 contracts
Rank by recorded value
#707 of 23,487
More info
First record
Feb 11, 2016 (10 yrs 8 mo ago)
Latest record
Oct 19, 2025 (1 yr ago)
DPWH contractor code
31684
Where they work
Latest 25 from a total of 159 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 25C00577 | 1 yr ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONST. OF MULTI-PURPOSE FACILITY (STA. MARIA STADIUM), STA. MARIA, BULACAN (PHASE 3), PROV. OF BULACANGAA 2025 SSP | On-Going | Region III | ₱29.4M |
| 25C00578 | 1 yr 2 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONST. OF MULTI-PURPOSE FACILITY (OBANDO STADIUM), BRGY. TAWIRAN, OBANDO, BULACAN (PHASE 2), PROV. OF BULACANGAA 2025 SSP | On-Going | Region III | ₱49.5M |
| 25CP0180 | 1 yr 3 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRA. PROGRAM (BIP) - BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONST. OF MULTI-PURPOSE BUILDING SAN ILDEFONSO NATIONAL HIGH SCHOOL E. VIUDEZ EXTN. ST., POBLACION, SAN ILDEFONSOGAA 2025 SSP | On-Going | Bulacan 3rd DEO | ₱73.1M |
| 25C00494 | 1 yr 5 mo ago | CONVERGENCE & SPL. SUPPORT PROG.-BASIC INFRASTRUCTURE PROGRAM-MULTI-PURPOSE BLDGS./FACILITIES TO SUPPORT SOCIAL SERVICES-CONST. OF MULTI-PURPOSE BLDG.: 1.)BRGY. BULAC, STA. MARIA 2.)BRGY. STA. CRUZ, STA. MARIA 3.)BRGY. MAG-ASAWANG SAPA, STA. MARIA, BULACABuildings and Facilities | On-Going | Region III | ₱39.0M |
| 25C00495 | 1 yr 5 mo ago | CONVERGENCE & SPL. SUPPORT PROG.-BASIC INFRASTRUCTURE PROG.-MULTI-PURPOSE BLDGS./FACILITIES TO SUPPORT SOCIAL SERVICES-CONST. OF MULTI-PURPOSE BLDG. 1.)BRGY. HEALTH CENTER, MARILAO 2.)BRGY. NAGBALON, MARILAO 3.) BRGY. PATUBIG, MARILAO, BULACAN, PROV. OF BGAA 2025 SSP | On-Going | Region III | ₱44.5M |
| 25GI0069 | 1 yr 5 mo ago | CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE, BARANGAY MANASA, ALIMODIAN, ILOILO (SITE 3)GAA 2025 SSP | Completed | Iloilo 4th DEO | ₱96.0M |
| 25DC0188 | 1 yr 5 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD ALONG TAAL LAKEGAA 2025 SSP | On-Going | Batangas 3rd DEO | ₱94.1M |
| 25DC0204 | 1 yr 5 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD ALONG TAAL LAKERoads | On-Going | Batangas 3rd DEO | ₱94.1M |
| 25DC0205 | 1 yr 5 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD ALONG TAAL LAKEGAA 2025 SSP | On-Going | Batangas 3rd DEO | ₱94.0M |
| 25CP0076 | 1 yr 6 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF ROAD,PHASE III, SITIO TALAMSI I-SITIO KARoads | On-Going | Bulacan 3rd DEO | ₱142.5M |
| 25CC0181 | 1 yr 8 mo ago | CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PACKAGE B) AT BARANGAY MALIS (PUROK 3), GUIGUINTO, BULACANFlood Control and Drainage | On-Going | Bulacan 1st DEO | ₱77.2M |
| 25CC0191 | 1 yr 8 mo ago | CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PACKAGE A) AT BARANGAY MALIS (PUROK 3), GUIGUINTO, BULACANFlood Control and Drainage | On-Going | Bulacan 1st DEO | ₱74.1M |
| 24CC0638 | 1 yr 8 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BOCAUE RIVER, BARANGAY BAMBANG (SITIO ATUBANG), BOCAUE, BULACANFlood Control and Drainage | On-Going | Bulacan 1st DEO | ₱46.3M |
| 24C00304 | 1 yr 11 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEAD. TO MAJ./STRATEGIC PULIC BLDGS./FACILITIES, CONST. OF ROAD, FLAMENCO ST., BRGY. PANGHULO, OBANDORoads | On-Going | Region III | ₱47.5M |
| 24C00538 | 1 yr 11 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM - BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING BULIRAN ELEMENTARY SCHOOL,BARANGAY BULIRAN,SAN MIGUEL,BULACANGAA 2024 SSP | On-Going | Region III | ₱29.7M |
| 24C00317 | 2 yrs 2 mo ago | CONVERGENCE & SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE FACILITY, BARANGAY MAG-ASAWANG SAPA, STA. MARIA, BULACANBuildings and Facilities | Completed | Region III | ₱19.8M |
| 24C00318 | 2 yrs 2 mo ago | CONVERGENCE & SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-REHABILITATION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BRGY. SAN PASCUAL, OBANDO, BULACANBuildings and Facilities | On-Going | Region III | ₱14.8M |
| 24C00592 | 2 yrs 2 mo ago | CONVERGENCE & SPL. SUPPORT PROG.-BASIC INFRA PROG.-MULTI-PURPOSE BLDGS./FACILITIES TO SUPP. SOCIAL SERVICES: 1.CONST. OF MPB BRGY. IBAYO, 2. CONST. OF MPB BRGY. PRENZA 1, 3. CONST. OF MPB, BRGY. LIAS, MARILAO, BULACAN, PROV. OF BULACANGAA 2024 SSP | On-Going | Region III | ₱54.4M |
| 24CC0538 | 2 yrs 2 mo ago | CONSTRUCTION OF PANDI BYPASS ROAD, PANDI, BULACAN (PHASE V)Roads | On-Going | Bulacan 1st DEO | ₱65.3M |
| 24CD0256 | 2 yrs 3 mo ago | CONSTRUCTION OF MULTI - PURPOSE FACILITY (SANTA MARIA STADIUM), BARANGAY POBLACION, STA. MARIA, BULACAN (PHASE 2)Buildings and Facilities | Completed | Bulacan 2nd DEO | ₱29.4M |
| 24D00176 | 2 yrs 4 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGOS RIVER, GENERAL NAKAR, QUEZON, (PACKAGE O)GAA 2024 SSP | Completed | Region IV-A | ₱84.1M |
| 24CC0320 | 2 yrs 6 mo ago | CONSTRUCTION OF MULTI-PURPOSE BUILDING (STA. BARBARA HIGH SCHOOL), STA. BARBARA, BALIUAG, BULACANBuildings and Facilities | Completed | Bulacan 1st DEO | ₱34.6M |
| 24OA0052 | 2 yrs 8 mo ago | REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS C-3 ROAD (LEFT) (S02121LZ), NAVOTAS CITYRoads | Completed | Malabon-Navotas DEO | ₱49.0M |
| 24OA0053 | 2 yrs 8 mo ago | REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS C-3 ROAD (RIGHT) (S02120LZ), NAVOTAS CITYRoads | Completed | Malabon-Navotas DEO | ₱49.0M |
| 24OA0036 | 2 yrs 8 mo ago | CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, MUZON RIVERWALL (PHASE 3), BRGY. MUZON, MALABON CITYFlood Control and Drainage | Completed | Malabon-Navotas DEO | ₱49.0M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.