ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
Contractor 5bf2d4dcf062ba30e803
Overview
PhilGEPS awards
₱0 · 0 awards
DPWH contracts
₱12.79B · 553 contracts
Rank by recorded value
#253 of 23,487
More info
First record
Aug 23, 2017 (9 yrs 2 mo ago)
Latest record
Jul 8, 2025 (1 yr 4 mo ago)
DPWH contractor code
Not in the DPWH list
Where they work
Latest 25 from a total of 553 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 25DI0147 | 1 yr 4 mo ago | CONSTRUCTION OF MULTI-PURPOSE BUILDING BARANGAY MALABAN, BINAN CITY LAGUNAGAA 2025 SSP | Terminated | Laguna 2nd DEO | ₱0 |
| 25DI0138 | 1 yr 4 mo ago | CONSTRUCTION OF FLOOD PROTECTION STRUCTURE PHASE 4 (BINAN-CARMONA BOUNDARY), BINAN SIDE, BINAN CITY, LAGUNAGAA 2025 SSP | Terminated | Laguna 2nd DEO | ₱0 |
| 25DI0142 | 1 yr 4 mo ago | REHABILITATION OF BANK STRUCTURE ALONG BINAN RIVER, NEAR A. BONIFACIO STREET, BINAN CITY, LAGUNAGAA 2025 SSP | Terminated | Laguna 2nd DEO | ₱0 |
| 25AE0048 | 1 yr 5 mo ago | BASIC INFRASTRUCTURE PROGRAM (BIP) - REPAIR/REHABILITATION OF BANK SLOPE PROTECTION, ALONG BOROBOR RIVER (RIMOS NO. 5 SECTION), BARANGAY RIMOS NO. 5, LUNA, LA UNIONGAA 2025 SSP | On-Going | La Union 1st DEO | ₱43.4M |
| 25A00102 | 1 yr 7 mo ago | CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SAN JOSE, STO. TOMAS, PANGASINANFlood Control and Drainage | On-Going | Region I | ₱28.0M |
| 25DO0048 | 1 yr 7 mo ago | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - TERTIARY ROADS - SAN MATEO-RODRIGUEZ RD - K0024 + 460 - K0025 + 180Roads | On-Going | Rizal 2nd DEO | ₱38.3M |
| 24GA0247 | 1 yr 7 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG MALINAO RIVER, BARANGAY BANAYBANAY, MALINAO, AKLANUnprogrammed Appropriations 2024 | On-Going | Aklan DEO | ₱86.0M |
| 25AI0051 | 1 yr 7 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ALORAGAT RIVER, PACKAGE 3, BINALONAN-LAOAC, PANGASINANFlood Control and Drainage | On-Going | Pangasinan 3rd DEO | ₱48.0M |
| 25A00008 | 1 yr 8 mo ago | CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG AGNO RIVER, BARANGAY PANACOL, AGUILAR, PANGASINAN, PHASE IVFlood Control and Drainage | On-Going | Region I | ₱144.9M |
| 25A00094 | 1 yr 8 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTOL-SAN GABRIEL-KAPANGAN ROAD, MALUYO RIVER, BARANGAY MANGAAN, SANTOL LA UNIONFlood Control and Drainage | On-Going | Region I | ₱146.3M |
| 25A00192 | 1 yr 8 mo ago | CONSTRUCTION OF MISSING LINKS/ NEW ROADS, SANTOL-SAN GABRIEL (LA UNION) - KAPANGAN (BENGUET) ROAD, LA UNION (PACKAGE 6)GAA 2025 OO-1 | On-Going | Region I | ₱93.4M |
| 25A00198 | 1 yr 8 mo ago | CONSTRUCTION OF MISSING LINKS/ NEW ROADS, SANTOL (LA UNION) - KIBUNGAN (BENGUET) ROAD (SANTOL SECTION), PACKAGE 1, LA UNIONGAA 2025 OO-1 | On-Going | Region I | ₱107.4M |
| 25GJ0017 | 1 yr 8 mo ago | CONSTRUCTION OF FLOOD MITIGATION STRUCTURES - WATERWAYS REHABILITATION AND COASTAL PROTECTION, SECTION 2, ILOILO CITY, ILOILOGAA 2025 OO-2 | On-Going | Iloilo City DEO | ₱119.4M |
| 25OG0009 | 1 yr 8 mo ago | PREVENTIVE MAINTENANCE - SECONDARY ROADS: COMMONWEALTH AVE - K0014 + (-214) - K0014 + 779, QUEZON CITYRoads | On-Going | Quezon City 2nd DEO | ₱90.0M |
| 25OF0006 | 1 yr 8 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CULIAT CREEK, BARANGAY BAGONG PAG-ASA, QUEZON CITYGAA 2025 OO-2 | Terminated | Quezon City 1st DEO | ₱33.8M |
| 25OB0068 | 1 yr 8 mo ago | BANK IMPROVEMENT OF SLOPE PROTECTION ALONG MARIKINA RIVER, (PACKAGE 10) PASIG CITYGAA 2025 OO-2 | Terminated | Metro Manila 1st DEO | ₱50.0M |
| 25OB0069 | 1 yr 8 mo ago | BANK IMPROVEMENT OF SLOPE PROTECTION ALONG MARIKINA RIVER, (PACKAGE 11) PASIG CITYGAA 2025 OO-2 | Terminated | Metro Manila 1st DEO | ₱49.3M |
| 25MH0009 | 1 yr 8 mo ago | CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI RD - K2008+789 - K2008+839, K2008+930 - K2009+050, K2009+183 - K2009+298, K2009+584 - K2009+614, K2009+635 - K2009+790, K2010+141 - K2010+190, K2011+573 - K20GAA 2025 OO-1 | Terminated | Sultan Kudarat 2nd DEO | ₱129.0M |
| 25DI0016 | 1 yr 8 mo ago | CONSTRUCTION OF RIVER PROTECTION STRUCTURE ALONG MALITLIT WATERWAYS (NEAR UST), PHASE 1, SANTA ROSA CITY, LAGUNAGAA 2025 OO-2 | On-Going | Laguna 2nd DEO | ₱49.3M |
| 25DI0036 | 1 yr 8 mo ago | REHABILITATION OF BANK STRUCTURE ALONG BINAN RIVER, PHASE 3, BINAN CITY, LAGUNAGAA 2025 OO-2 | On-Going | Laguna 2nd DEO | ₱94.2M |
| 25DI0042 | 1 yr 8 mo ago | REHABILITATION OF BANK STRUCTURE ALONG SANTA ROSA RIVER, PHASE 2, BINAN CITY, LAGUNAFlood Control and Drainage | On-Going | Laguna 2nd DEO | ₱71.4M |
| 25DI0030 | 1 yr 8 mo ago | CONSTRUCTION OF RIVER PROTECTION STRUCTURE NEAR PANORAMA SCHOOL, SANTA ROSA CITY, LAGUNAGAA 2025 OO-2 | On-Going | Laguna 2nd DEO | ₱38.1M |
| 25DI0047 | 1 yr 8 mo ago | REHABILITATION OF BINAN RIVER CONTROL STRUCTURE (STAGGERED), PHASE 1, BINAN CITY, LAGUNAGAA 2025 OO-2 | Terminated | Laguna 2nd DEO | ₱14.3M |
| 24DK0180 | 1 yr 9 mo ago | CAPITAL OUTLAY - CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING ... - CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE, BARANGAY DAPDAP, TAYABAS CITY, QUEZONRoads | On-Going | Quezon 1st DEO | ₱47.3M |
| 24DO0052 | 2 yrs 5 mo ago | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - TERTIARY ROADS - SAN MATEO - RODRIGUEZ RD K0023+590 - K0024+500GAA 2024 OO-1 | On-Going | Rizal 2nd DEO | ₱63.2M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.