Skip to content
FY2026 GAA: ₱6.79T
PisoScan

SYMS CONSTRUCTION TRADING

Contractor 5e4f3fd4e5233faeeaae

Overview

PhilGEPS awards
₱11.42B · 312 awards
DPWH contracts
₱5.88B · 149 contracts
Rank by recorded value
#176 of 23,487

More info

First record
Jan 25, 2021 (5 yrs 9 mo ago)
Latest record
Jul 31, 2025 (1 yr 3 mo ago)
DPWH contractor code
48517

Where they work

Latest 25 from a total of 149 DPWH contracts
Contract IDStartDescriptionStatusOfficeAmount
24CC06021 yr 10 mo agoCONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAYCAPIZ-TALIPTIP RIVER, PACKAGE A, BARANGAY PEREZ, BULAKAN, BULACANFlood Control and DrainageOn-GoingBulacan 1st DEO₱96.5M
24CC06041 yr 10 mo agoCONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAYCAPIZ-TALIPTIP RIVER, PACKAGE B, BARANGAY PEREZ, BULAKAN, BULACANFlood Control and DrainageOn-GoingBulacan 1st DEO₱92.6M
24CC06051 yr 10 mo agoCONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LABANGAN CHANNEL, PACKAGE A, BARANGAY SANTA ELENA - BARANGAY TIBAGUIN, HAGONOY, BULACANFlood Control and DrainageOn-GoingBulacan 1st DEO₱96.3M
24CC06061 yr 10 mo agoCONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LABANGAN CHANNEL, PACKAGE B, BARANGAY SANTA ELENA - BARANGAY TIBAGUIN, HAGONOY, BULACANFlood Control and DrainageOn-GoingBulacan 1st DEO₱92.8M
24CC05881 yr 10 mo agoCONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KALERO RIVER, PACAKGE B, BARANGAY PANASAHAN, MALOLOS, BULACANFlood Control and DrainageOn-GoingBulacan 1st DEO₱92.8M
24CC05921 yr 10 mo agoCONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, PACKAGE A, BARANGAY TAAL-BARANGAY SANTO CRISTO, PULILAN, BULACANFlood Control and DrainageOn-GoingBulacan 1st DEO₱92.8M
24CC05941 yr 10 mo agoCONSTRUCTION O FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER, PACAKGE A, BARANGAY SAN MIGUEL-BARANGAY MEYSULAO, CALUMPIT, BULACANFlood Control and DrainageOn-GoingBulacan 1st DEO₱72.4M
24CC04882 yrs 1 mo agoCONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN JOSE, PLARIDEL, BULACANBuildings and FacilitiesOn-GoingBulacan 1st DEO₱14.5M
24CC01872 yrs 2 mo agoCONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE, BARANGAY BUGUION (PUROK 6 TO PUROK 7), CALUMPIT, BULACANFlood Control and DrainageOn-GoingBulacan 1st DEO₱77.2M
24C005872 yrs 3 mo agoBASIC EDUCATIONAL FACILITIES FUND (BEFF)-CONSTRUCTION OF ELEM. AND SECONDARY CLASSROOMS UNDER THE DEPED'S BASIC EDUC. FACILITIES FUND:CONSTRUCTION OF 2-STOREY 6-CLASSROOM SCHOOL BUILDING IN SALACOT ELEM. SCHOOL, BRGY. SALACOT, SAN MIGUEL, BUL.Buildings and FacilitiesOn-GoingRegion III₱19.7M
24CC05352 yrs 3 mo agoREHABILITATION OF MALOLOS-PAOMBONG-HAGONOY-CALUMPIT INTERJURISDICTIONAL ROADS, CALUMPIT, BULACANRoadsCompletedBulacan 1st DEO₱67.5M
24CC04942 yrs 5 mo agoCONSTRUCTION OF REVETMENT AT BARANGAY LONGOS, CITY OF MALOLOS, BULACANFlood Control and DrainageOn-GoingBulacan 1st DEO₱69.9M
24CC01992 yrs 5 mo agoCONSTRUCTION OF REINFORCED CONCRETE SLOPE REVETMENT AT BARANGAY TIKAY, MALOLOS CITY, BULACANFlood Control and DrainageCompletedBulacan 1st DEO₱67.5M
24CC04132 yrs 6 mo agoREHABILITATION OF ROAD PUROK 1,2 AND 6, BARANGAY BARANGCA, BALIUAG, BULACANRoadsCompletedBulacan 1st DEO₱9.9M
24CC03672 yrs 6 mo agoCONSTRUCTION OF REVETMENT AT STA. ELENA-SAN PEDRO ALONG ANGAT RIVER AT HAGONOY, BULACANFlood Control and DrainageCompletedBulacan 1st DEO₱38.6M
24CC03702 yrs 6 mo agoCONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, SAN PEDRO SECTION, BUSTOS, BULACANFlood Control and DrainageCompletedBulacan 1st DEO₱77.2M
24CC03942 yrs 6 mo agoCONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE, BARANGAY CALILIGAWAN, MALOLOS CITY, BULACANFlood Control and DrainageCompletedBulacan 1st DEO₱72.4M
24CC01952 yrs 6 mo agoCONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE, BARANGAY SANTA MONICA (PUROK 6 TO PUROK 7), HAGONOY, BULACANFlood Control and DrainageCompletedBulacan 1st DEO₱67.5M
24CC03352 yrs 6 mo agoCONSTRUCTION OF ROAD, ESGUERRA STREET, BRGY. POBLACION, PULILAN, BULACANRoadsCompletedBulacan 1st DEO₱9.9M
24CC03562 yrs 6 mo agoCONSTRUCTION OF RIVER PROTECTION STRUCTURE, BARANGAY MALIBONG BATA, PANDI, BULACANFlood Control and DrainageOn-GoingBulacan 1st DEO₱39.6M
24CC03572 yrs 6 mo agoCONSTRUCTION OF REVETMENT AT CARILLO-ABULALAS ALONG ANGAT RIVER AT HAGONOY, BULACANFlood Control and DrainageCompletedBulacan 1st DEO₱38.6M
24CC02802 yrs 6 mo agoREHABILITATION OF THE OLD MUNICIPAL BUILDING (MUNICIPAL MUSEUM AND LIBRARY), BARANGAY POBLACION, BOCAUE, BULACANBuildings and FacilitiesOn-GoingBulacan 1st DEO₱28.8M
24CC02922 yrs 6 mo agoCONSTRUCTION OF REVETMENT AT BARANGAY IBA O'ESTE, CALUMPIT, BULACANFlood Control and DrainageOn-GoingBulacan 1st DEO₱39.2M
24CC03082 yrs 6 mo agoREHABILITATION OF ACCESS ROADS LEADNG TO HAGONOY FISHPORT, BARANGAY STA. ELENA, HAGONOY, BULACANRoadsCompletedBulacan 1st DEO₱4.9M
24CD00162 yrs 7 mo agoCONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, BARANGAY PINAGTULAYAN, NORZAGARAY, BULACANFlood Control and DrainageCompletedBulacan 2nd DEO₱48.2M

Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.