Skip to content
FY2026 GAA: ₱6.79T
PisoScan

ANORE CONSTRUCTION (34048) / NGV CONSTRUCTION OPC

Contractor 91b7886739d9b8cc8094

Overview

PhilGEPS awards
₱0 · 0 awards
DPWH contracts
₱1.42B · 6 contracts
Rank by recorded value
#1,910 of 23,487

More info

First record
Feb 15, 2025 (1 yr 8 mo ago)
Latest record
Apr 6, 2025 (1 yr 7 mo ago)
DPWH contractor code
58077

Where they work

Latest 6 from a total of 6 DPWH contracts
Contract IDStartDescriptionStatusOfficeAmount
25E002311 yr 7 mo agoSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. MELGAR A-BRGY. MELGAR B, STA. 000+760-STA. 001+191.26, NAUJAN, OR. MINDOROGAA 2025 SSPOn-GoingMIMAROPA Region₱231.1M
25E000101 yr 8 mo agoCONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG PALUAN RIVER, BRGY. SAN JOSE POBLACION (BRGY. 6) SECTION (R/S), PALUAN, OCC. MINDOROGAA 2025 OO-2On-GoingMIMAROPA Region₱230.0M
25E000111 yr 8 mo agoCONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG PALUAN RIVER, BRGY. SAN JOSE POBLACION (BRGY. 6) SECTION (L/S), PALUAN, OCC. MINDOROGAA 2025 OO-2On-GoingMIMAROPA Region₱230.1M
25E000271 yr 8 mo agoCONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF RIVERBANK PROTECTION STRUCTURE ALONG MAMARA RIVER (UPSTREAM), BRGY. TUBILI, PALUAN, OCC. MINDOROGAA 2025 OO-2On-GoingMIMAROPA Region₱177.9M
25E000641 yr 8 mo agoCONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. TIGKAN SECTION (LS), PACKAGE B, NAUJAN, OR. MINDOROGAA 2025 OO-2On-GoingMIMAROPA Region₱276.0M
25E000651 yr 8 mo agoCONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. TIGKAN SECTION (DOWNSTREAM LS), PACKAGE C, NAUJAN, OR. MINDOROGAA 2025 OO-2On-GoingMIMAROPA Region₱276.1M

Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.