YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. ([REVOKED] 45002)
Contractor a339a5b9e667e6a53630
Overview
PhilGEPS awards
₱0 · 0 awards
DPWH contracts
₱8.30B · 216 contracts
Rank by recorded value
#415 of 23,487
More info
First record
Aug 29, 2019 (7 yrs 2 mo ago)
Latest record
Jun 24, 2025 (1 yr 4 mo ago)
DPWH contractor code
Not in the DPWH list
Where they work
Latest 25 from a total of 216 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 25DM0150 | 1 yr 4 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG CATANAUAN RIVER, CATANAUAN, QUEZON (PACKAGE C)GAA 2025 SSP | On-Going | Quezon 3rd DEO | ₱95.1M |
| 25D00292 | 1 yr 4 mo ago | CONSTRUCTION OF FLOOD CONTROL AND BANK PROTECTION STRUCTURES ALONG LUKUTANG MALAKI RIVER, RODRIGUEZ, RIZAL (PACKAGE 7)GAA 2025 SSP | On-Going | Region IV-A | ₱97.5M |
| 25GJ0052 | 1 yr 5 mo ago | CONSTRUCTION OF ILOILO CITY FLOOD MITIGATION STRUCTURES ILOILO CITY COMPREHENSIVE FLOOD MITIGATION PROJECT - SECTION 1GAA 2025 SSP | On-Going | Iloilo City DEO | ₱143.3M |
| 25OB0253 | 1 yr 7 mo ago | REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - ORTIGAS AVE. - K0010+286 - K0011+547GAA 2025 OO-1 | On-Going | Metro Manila 1st DEO | ₱47.5M |
| 25DC0045 | 1 yr 7 mo ago | ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM,CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG TAAL LAKE CIRCUMFERENTIALGAA 2025 OO-2 | On-Going | Batangas 3rd DEO | ₱111.0M |
| 25EG0012 | 1 yr 7 mo ago | ACCESS ROAD LEADING TO MANGINGISDA SEAPORT, 00+000.00 - 00+900.70, 00+920.47 - 03+498.98, 04+784.92 - 04+938, BARANGAY MANGINGISDA, PUERTO PRINCESA CITYGAA 2025 CP | On-Going | Palawan 3rd DEO | ₱106.8M |
| 25OB0259 | 1 yr 7 mo ago | REHABILITATION OF SLOPE PROTECTION ALONG BULI CREEK (LEFT BANK FACING DOWNSTREAM), PASIG CITY (PACKAGE 3)GAA 2025 OO-2 | Terminated | Metro Manila 1st DEO | ₱65.5M |
| 25OB0261 | 1 yr 7 mo ago | REHABILITATION OF SLOPE PROTECTION ALONG BULI CREEK (LEFT BANK FACING DOWNSTREAM), PASIG CITY (PACKAGE 1)GAA 2025 OO-2 | Terminated | Metro Manila 1st DEO | ₱25.3M |
| 25A00284 | 1 yr 8 mo ago | CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS) - CONSTRUCTION OF MULTI-PURPOSE/TRAINING CENTER, CAMP LT. COL JOSE M. LABERINTO, NAGUILIAN, LA UNGAA 2025 CP | On-Going | Region I | ₱25.5M |
| 25CC0083 | 1 yr 8 mo ago | CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SANTA ANA, BULACAN, BULACANGAA 2025 SSP | On-Going | Bulacan 1st DEO | ₱38.6M |
| 25OG0027 | 1 yr 8 mo ago | REHABILITATION OF FLOOD MITIGATION STRUCTURE ALONG SAN JUAN RIVER (PHASE LXVI), QUEZON CITYGAA 2025 SSP | On-Going | Quezon City 2nd DEO | ₱145.5M |
| 25E00133 | 1 yr 8 mo ago | CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE, TAGBARUNGIS RIVER WATERWAYS (LS), PTO. PRINCESA CITY, PALAWANGAA 2025 OO-2 | On-Going | MIMAROPA Region | ₱161.8M |
| 25E00138 | 1 yr 8 mo ago | CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF RIVERSIDE PROTECTION STRUCTURE, PILI RIVER, UPSTREAM, POBLACION, SAN FERNANDO, SIBUYAN ISLAND, ROMBLONGAA 2025 OO-2 | On-Going | MIMAROPA Region | ₱230.1M |
| 25E00139 | 1 yr 8 mo ago | CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF PILI RIVERSIDE PROTECTION STRUCTURE, DOWNSTREAM, POBLACION, SAN FERNANDO, ROMBLONGAA 2025 OO-2 | On-Going | MIMAROPA Region | ₱144.7M |
| 25E00147 | 1 yr 8 mo ago | FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF RIVERSIDE PROTECTION STRUCTURE, DOWNSTREAM, BRGY. PUNONG, SAN FERNANDO, ROMBLONGAA 2025 SSP | On-Going | MIMAROPA Region | ₱229.8M |
| 25E00150 | 1 yr 8 mo ago | BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD MITIGATING STRTUCTURE, TINGARAYGAA 2025 SSP | On-Going | MIMAROPA Region | ₱247.5M |
| 25E00151 | 1 yr 8 mo ago | BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD MITIGATING STRUCTURE, TINGARAY RIVER, UPSTREAM R/S, BRGY. POBLACION, FERROL, ROMBLONGAA 2025 SSP | On-Going | MIMAROPA Region | ₱247.5M |
| 25DI0039 | 1 yr 8 mo ago | CONSTRUCTION OF RIVER PROTECTION STRUCTURE NEAR BAYANBAYANAN BRIDGE UPSTREAM, PHASE 2, SAN PEDRO CITY, LAGUNAGAA 2025 OO-2 | Terminated | Laguna 2nd DEO | ₱39.5M |
| 24GA0250 | 1 yr 9 mo ago | CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG AKLAN RIVER (PACKAGE 2), KALIBO, AKLANUnprogrammed Appropriations 2024 | On-Going | Aklan DEO | ₱95.5M |
| 23CD0218 | 1 yr 10 mo ago | CONSTRUCTION OF 4-STOREY 8-CLASSROOM SAN GABRIEL NATIONAL HIGH SCHOOL, STA. MARIA, BULACANGAA 2023 DepEd BEFF | Completed | Bulacan 2nd DEO | ₱39.4M |
| 24E00279 | 2 yrs ago | CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU- NAUJAN SUPER HEALTH CENTER, NAUJAN, ORIENTAL MINDOROGAA 2024 DOH HFEP | On-Going | MIMAROPA Region | ₱11.7M |
| 24E00281 | 2 yrs ago | CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU- ARACELI SUPER HEALTH CENTER, ARACELI, PALAWANGAA 2024 DOH HFEP | On-Going | MIMAROPA Region | ₱11.7M |
| 24OH0081 | 2 yrs 5 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONST./IMPV'T. OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM-TIKAS)-CONST. (COMPLETION) OF THE PAF FIRING RANGE AT CJVAB, PASAY CITYGAA 2024 CP | Completed | South Manila DEO | ₱19.6M |
| 24DM0117 | 2 yrs 6 mo ago | CONSTRUCTION OF SEAWALL AND BAYWALK, BRGY. F. DE JESUS, UNISAN, QUEZONGAA 2024 SSP | Completed | Quezon 3rd DEO | ₱49.5M |
| 24CC0326 | 2 yrs 6 mo ago | CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE, BARANGAY BAMBANG, BULAKAN, BULACANGAA 2024 SSP | Completed | Bulacan 1st DEO | ₱72.4M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.