M.M.A. ACHIEVER CONSTRUCTION & DEVELOPMENT CORP.
Contractor a6d26eb11823fa684735
Overview
PhilGEPS awards
₱0 · 0 awards
DPWH contracts
₱3.65B · 62 contracts
Rank by recorded value
#902 of 23,487
More info
First record
Mar 7, 2016 (10 yrs 8 mo ago)
Latest record
Jun 9, 2025 (1 yr 5 mo ago)
DPWH contractor code
32195
Where they work
Latest 25 from a total of 62 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 25K00381 | 1 yr 5 mo ago | CONSTRUCTION OF LANAO DEL SUR PROVINCIAL HOSPITAL, LANAO DEL SUR (PHASE 1)Buildings and Facilities | On-Going | Region X | ₱59.3M |
| 25K00053 | 1 yr 7 mo ago | CONSTRUCTION OF BUBONG-RAMAIN FLOOD CONTROL AND SLOPE PROTECTION, BARANGAY PINDOGOAN, BUBONG, LANAO DEL SURGAA 2025 OO-2 | On-Going | Region X | ₱95.5M |
| 25K00099 | 1 yr 7 mo ago | CONSTRUCTION OF MALA-LAWASAIG RIVER FLOOD CONTROL AND SLOPE PROTECTION, BARANGAY BUBONG RAMAIN, BUBONG LANAO DEL SURGAA 2025 OO-2 | On-Going | Region X | ₱92.7M |
| 25K00118 | 1 yr 7 mo ago | WIDENING OF PERMANENT BRIDGES MATLING PARALLEL BR. ALONG MAHARLIKA HIGHWAY( COTABATO-MALABANG-LANAO DEL NORTE RD)Bridges | On-Going | Region X | ₱114.6M |
| 25K00216 | 1 yr 7 mo ago | ROAD WIDENING BUKIDNON BDRY-NORTH COTABATO RD - (S01606MN) CHAINAGE 6689 - CHAINAGE 8081, CHAINAGE 11121 - CHAINAGE 15121GAA 2025 OO-1 | On-Going | Region X | ₱136.6M |
| 25K00190 | 1 yr 8 mo ago | CONSTRUCTION OF ROAD, BARANGAY GATA, WAO, LANAO DEL SURGAA 2025 SSP | Completed | Region X | ₱78.4M |
| 24K00518 | 1 yr 10 mo ago | CONST. OF MALA-LAWASAIG RIVER FLOOD CONTROL AND SLOPE PROTECTION, BARANGAY SUGOD,BAYABAO SECTION, DITSAAN RAMAIN, LANAO DEL SURUnprogrammed Appropriations 2024 | On-Going | Region X | ₱47.8M |
| 24K00451 | 2 yrs 1 mo ago | ROAD WIDENING-SECONDARY ROADS-BUKIDNON BDRY-NORTH COTABATO RD - K1604 + (-1104) - K1604 + 145, K1608 + 503 - K1609 + 503GAA 2024 OO-1 | Completed | Region X | ₱57.4M |
| 24K00088 | 2 yrs 2 mo ago | ROAD WIDENING-TERTIARY ROADS MULONDO-WAO ROAD-(S01604MN) CHAINAGE 40-CHAINAGE 2040GAA 2024 OO-1 | Completed | Region X | ₱47.8M |
| 24K00423 | 2 yrs 2 mo ago | REHAB./RECONST.OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-TERTIARY ROADS- MULONDO-WAO RD - (S01604MN) CHAINAGE 8600 - CHAINAGE 8800GAA 2024 OO-1 | Completed | Region X | ₱28.7M |
| 24K00378 | 2 yrs 2 mo ago | CONSTRUCTION OF GATA RIVER FLOOD CONTROL WITH SLOPE PROTECTION, BRGY. CAIRAN, ROGAN, POONA BAYABAO, LANAO DEL SURFlood Control and Drainage | On-Going | Region X | ₱32.5M |
| 24K00447 | 2 yrs 2 mo ago | WIDENING OF PERMANENT BRIDGES, BALATIN BR. (B02083MN) ALONG BUKIDNON BDRY-NORTH COTABATO RDGAA 2024 OO-1 | On-Going | Region X | ₱124.2M |
| 24K00396 | 2 yrs 3 mo ago | REPLACEMENT OF PERMANENT WEAK BRIDGES, MALADI BR. (B02098MN) ALONG COTABATO-MALABANG-LANAO DEL NORTE RDBridges | On-Going | Region X | ₱86.0M |
| 24K00397 | 2 yrs 3 mo ago | RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, MATLING BR. (B02097MN) ALONG COTABATO-MALABANG-LANAO DEL NORTE RDGAA 2024 OO-1 | Completed | Region X | ₱66.6M |
| 24K00251 | 2 yrs 3 mo ago | CONSTRUCTION OF GANASSI-TUBOD ROAD, MADAMBA SECTION, LANAO DEL SURRoads | On-Going | Region X | ₱94.6M |
| 24K00163 | 2 yrs 4 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURE, MADALUM, LANAO DEL SURFlood Control and Drainage | On-Going | Region X | ₱47.8M |
| 24K00118 | 2 yrs 5 mo ago | CONSTRUCTION OF BALATIN RIVER FLOOD CONTROL (BALATIN BRIDGE), WAO, LANAO DEL SURFlood Control and Drainage | On-Going | Region X | ₱58.1M |
| 24K00157 | 2 yrs 6 mo ago | CONCRETING OF GANASSI-TUBOD ROAD IN MADAMBA SECTION, LANAO DEL SURRoads | Completed | Region X | ₱47.8M |
| 24K00004 | 2 yrs 6 mo ago | CONST. OF FLOOD MITIGATION STRUCTURE AT BARA-AS RIVER, PICONG, LANAO DEL SURFlood Control and Drainage | On-Going | Region X | ₱57.9M |
| 24K00139 | 2 yrs 7 mo ago | ASSET PRESERVATION- REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS, ILIGAN CITY-MARAWI CITY RD-(S01709MN) CHAINAGE 0 - CHAINAGE 268Roads | Completed | Region X | ₱11.5M |
| 23K00306 | 2 yrs 11 mo ago | CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. POBLACION, MARAWI CITY, LANAO DEL SURBuildings and Facilities | Completed | Region X | ₱9.8M |
| 23K00134 | 3 yrs 2 mo ago | ROAD WIDENING-SECONDARY ROADS, WAO-BUMBARAN SECTION - (S01605MN) CHAINAGE 6000 - CHAINAGE 8000Roads | Completed | Region X | ₱45.7M |
| 23K00325 | 3 yrs 2 mo ago | REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-PRIMARY ROADS, BITO-MARAWI RD - (S01700MN) CHAINAGE 1700 - CHAINAGE 1874Roads | Completed | Region X | ₱38.2M |
| 23K00143 | 3 yrs 4 mo ago | REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, MARAWI-MASIU RD - (S01603MN) CHAINAGE 26000 - CHAINAGE 27542.253, CHAINAGE 27637.065 - CHAINAGE 28023Roads | Completed | Region X | ₱46.3M |
| 23K00135 | 3 yrs 4 mo ago | ROAD WIDENING-SECONDARY ROADS, WAO-BUMBARAN SECTION - (S01605MN) CHAINAGE 4000 - CHAINAGE 6000Roads | Completed | Region X | ₱47.8M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.