EZJONES CONSTRUCTION INC. (34462) / MWJ CONSTRUCTION

Contractor aa81dc4b3dade8b88ac9

Overview

PhilGEPS awards
₱0 · 0 awards
DPWH contracts
₱3.37B · 28 contracts
Rank by recorded value
#951 of 23,487

More info

First record
Mar 27, 2017 (9 yrs 7 mo ago)
Latest record
May 14, 2025 (1 yr 6 mo ago)
DPWH contractor code
14882

Where they work

Leyte₱3.37B
Latest 25 from a total of 28 DPWH contracts
Contract IDStartDescriptionStatusOfficeAmount
25I000801 yr 6 mo agoCONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, BRGY. STA. ELENA, TANAUAN, LEYTEGAA 2025 OO-2On-GoingRegion VIII₱195.6M
25I001111 yr 6 mo agoCONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CALOGCOG RIVER (UPSTREAM), BARANGAY CALOGCOG TO BARANGAY MOHON TO BARANGAY ATIPOLO, TANAUAN, LEYTEGAA 2025 OO-2On-GoingRegion VIII₱207.1M
25I000731 yr 8 mo agoCONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEM ALONG BANGON RIVER, PHASE 3, BARANGAY SAN JOSE, PALO, LEYTEFlood Control and DrainageOn-GoingRegion VIII₱236.2M
24IC00732 yrs 2 mo agoCONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CALOGCOG RIVER (LEFT BANK-UPSTREAM), BRGY. CALOGCOG AND BRGY. ATIPOLO, TANAUAN, LEYTEGAA 2024 OO-2CompletedLeyte 1st DEO₱144.6M
24IC00782 yrs 2 mo agoCONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, PHASE 2, BRGY. BALUD TO BRGY. STA. ELENA, TANAUAN, LEYTEFlood Control and DrainageOn-GoingLeyte 1st DEO₱144.6M
24IC00682 yrs 7 mo agoCONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, BRGY. MALAGUICAY AND BRGY. BINONGTOAN, TANAUAN, LEYTEGAA 2024 OO-2CompletedLeyte 1st DEO₱144.7M
24I000122 yrs 8 mo agoCONSTRUCTION OF BANGON FLOOD CONTROL STRUCTURE ALONG BANGON RIVER, BARANGAY SAN JOSE (PHASE 2), PALO, LEYTEGAA 2024 OO-2On-GoingRegion VIII₱169.7M
24I000142 yrs 8 mo agoCONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CALOGCOG RIVER (UPSTREAM), BARANGAY CALOGCOG AND BARANGAY ATIPOLO, TANAUAN, LEYTEGAA 2024 OO-2On-GoingRegion VIII₱187.9M
24I000022 yrs 8 mo agoCONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, BARANGAY STA. ELENA (UPSTREAM), TANAUAN, LEYTEGAA 2024 OO-2CompletedRegion VIII₱193.0M
23IC01193 yrs 4 mo agoFLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES - CONST. OF BANGON FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEM ALONG BANGON RIVER, BRGY. SAN JOSE, PALO, LEYTEFlood Control and DrainageCompletedLeyte 1st DEO₱115.8M
23I001153 yrs 4 mo agoSIPAG - INTERJURISDICTIONAL ROADS AND/OR ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS - CONSTRUCTION OF TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, BARANGAY 89, TACLOBAN CITYFlood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - PCCPCompletedRegion VIII₱96.4M
23IC01143 yrs 4 mo agoCONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL ALONG BINAHAAN RIVER, BRGY. STA. ELENA, TANAUAN, LEYTEFlood Control and DrainageCompletedLeyte 1st DEO₱106.1M
23IC01133 yrs 5 mo agoCONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST. OF FLOOD CONTROL ALONG BINAHAAN RIVER, BRGY. MALAGUICAY, TANAUAN, LEYTEFlood Control and DrainageCompletedLeyte 1st DEO₱106.1M
23I000083 yrs 7 mo agoCLUSTER 3: 1. CONSTRUCTION OF STORM SURGE PROTECTION: TIDE EMBANKMENT, SUBSECTION 6.8, BARANGAY SAN ROQUE, TANAUAN, LEYTE; 2. CONSTRUCTION OF STORM SURGE PROTECTION: TIDE EMBANKMENT, SUBSECTION 6.9, BARANGAY SAN ROQUE, TANAUAN, LEYTEFlood Control and DrainageCompletedRegion VIII₱226.2M
23I000153 yrs 7 mo agoCONSTRUCTION OF STORM SURGE PROTECTION: TIDE EMBANKMENT, SUBSECTION 6.10, BARANGAY SAN ROQUE, TANAUAN, LEYTEFlood Control and DrainageCompletedRegion VIII₱113.1M
22I000874 yrs 5 mo agoCONSTRUCTION (COMPLETION) OF STORM SURGE PROTECTION: TIDE EMBANKMENT, SECTION 5, PHASE 3 AND 4, BRGY. SAN JOAQUIN, PALO, LEYTEFlood Control and DrainageCompletedRegion VIII₱33.7M
22I000574 yrs 7 mo agoCONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BINAHAAN RIVER, BINAHAAN RIVER BASIN, RIGHT SIDE BANK, BRGY. STA. ELENA, TANAUAN, LEYTEFlood Control and DrainageCompletedRegion VIII₱97.5M
22I000614 yrs 8 mo agoCONSTRUCTION (COMPLETION) OF STORM SURGE PROTECTION: BACKWATER DIKE AND EARLY WARNING STRUCTURE, PALO, LEYTEGAA 2022 OO-2CompletedRegion VIII₱97.5M
22I000304 yrs 8 mo agoCONSTRUCTION OF STORM SURGE PROTECTION: TIDE EMBANKMENT, SUBSECTION 6.6, BRGY. SAN ROQUE, TANAUAN, LEYTE (REVISED)Flood Control and DrainageCompletedRegion VIII₱84.3M
22I000374 yrs 8 mo agoCONSTRUCTION OF STORM SURGE PROTECTION: TIDE EMBANKMENT, SUBSECTION 6.7, BRGY. SAN ROQUE, TANAUAN, LEYTEFlood Control and DrainageCompletedRegion VIII₱84.7M
21IC00285 yrs 8 mo agoCONST. OF FLOOD MITIGATION STRUCTURE - CONST. OF FLOOD CONTROL STRUCTURE ALONG PALO - CARIGARA - ORMOC ROAD, K0918+757 - K0919+205, PAL0, LEYTEFlood Control and DrainageCompletedLeyte 1st DEO₱48.5M
20I000755 yrs 11 mo agoCONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, STA. ELENA SECTION, TANAUAN, LEYTEFlood Control and DrainageCompletedRegion VIII₱95.4M
20I000416 yrs 8 mo agoNETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - PALO WEST BYPASS ROAD, LEYTE, PALO, LEYTEBridges: Construction - Concrete (Superstructure) - with Driven Piles, Roads: Construction - PCCPCompletedRegion VIII₱78.2M
19IM00497 yrs 2 mo agoCONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BRGY. 89, SAN JOSE, TACLOBAN CITYFlood Control and DrainageCompletedTacloban City DEO₱70.8M
19I000657 yrs 3 mo agoCONSTRUCTION OF BANGON RIVER LEFT BANK BACKWATER DIKE, STA. 1+420.00 - STA. 1+800.00, PALO, LEYTEFlood Control and DrainageCompletedRegion VIII₱89.9M

Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.