TOKWING CONSTRUCTION, CORP.(FOR; TOKWING CONSTRUC
Contractor b2b1f22b7ace240d83b2
Overview
PhilGEPS awards
₱0 · 0 awards
DPWH contracts
₱8.38B · 57 contracts
Rank by recorded value
#410 of 23,487
More info
First record
Jan 28, 2016 (10 yrs 9 mo ago)
Latest record
Jun 9, 2026 (5 mos ago)
DPWH contractor code
9650
Where they work
Latest 25 from a total of 57 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 26CI0012 | 5 mos ago | ASSET PRESERVATION PROGRAM: CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-SECONDARY ROADS: UPGRADING OF DRAINAGE SYSTEM ALONG ARAYAT-MAGALANG-MABALACAT ROAD (BOTH SIDE), K0104+000 K0106+370 MAGALANG, PAMPANGAGAA 2026 OO-1 | On-Going | Pampanga 3rd DEO | ₱91.0M |
| 25C00477 | 1 yr 6 mo ago | NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (LUBAO-GUAGUA SECTION)-PACKAGE 6, PROVINCE OF PAMPANGAGAA 2025 OO-1 | On-Going | Region III | ₱146.7M |
| 24D00264 | 2 yrs 1 mo ago | CONSTRUCTION OF NEW SUPER HEALTH CENTERS / RHU CUENCA, SUPER HEALTH CENTER, BATANGASBuildings and Facilities | On-Going | Region IV-A | ₱11.8M |
| 24C00033 | 2 yrs 6 mo ago | NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (LUBAO-GUAGUA SECTION), PACKAGE 10, PROVINCE OF PAMPANGARoads | On-Going | Region III | ₱185.5M |
| 23Z00026 | 3 yrs 1 mo ago | CONSTRUCTION OF SMALL RIVER IMPOUNDING PROJECT (SRIP) ANDDRAINAGE SYSTEMS ALONG THE FOLLOWING RIVERS;A.) CADCADIR RIVER, BRGY. BACSAY CATARAOAN SUR, CLAVERIA, CAGAYANB.) CADCADIR RIVER, BRGYS. UNION AND CADCADIR, CLAVERIA, CAGAYANC.) CABICUNGAN RIFlood Control and Drainage | On-Going | Flood Control Management Cluster | ₱1.45B |
| 23CH0087 | 3 yrs 4 mo ago | CONSTRUCTION OF SLOPE PROTECTION ALONG PALCARANGAN CREEK, STA. CRUZ, LUBAO, PAMPANGAFlood Control and Drainage | Completed | Pampanga 2nd DEO | ₱19.6M |
| 23C00082 | 3 yrs 6 mo ago | NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BYPASS AND DIVERSION ROADS, LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (LUBAO-GUAGUA SECTION), PACKAGE 9, PROVINCE OF PAMPANGARoads | Completed | Region III | ₱101.6M |
| 23CI0035 | 3 yrs 8 mo ago | FLOOD MANAGEMENT PROGRAM; CONSTRUCTION/MAINTENENCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; CONST OF REINFORCED CONCRETE SLOPE PROTECTION WITH STEEL SHEET PILES FOUNDATION ALONG ABACAN RIVER, BRGY CAPAYA, ANGELES CITY, PAMPANGAFlood Control and Drainage | Completed | Pampanga 3rd DEO | ₱38.1M |
| 22CH0083 | 4 yrs 4 mo ago | CONSTRUCTION OF SLOPE PROTECTION AND CANAL STRUCTURE OF PORAC-GUMAIN RIS, GUAGUA, PAMPANGAFlood Control and Drainage | Completed | Pampanga 2nd DEO | ₱77.2M |
| 22C00081 | 4 yrs 4 mo ago | NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BYPASS AND DIVERSION ROADS-LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (LUBAO-GUAGUA SECTION) PACKAGE 6, PROVINCE OF PAMPANGARoads | Completed | Region III | ₱86.8M |
| 22CH0040 | 4 yrs 6 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/REHABILILTATION OF SLOPE PROTECTION ALONG PORAC RIVER, POBLACION SECTION, FLORIDABLANCA, PAMPANGAFlood Control and Drainage | Completed | Pampanga 2nd DEO | ₱48.8M |
| 21C00060 | 5 yrs 6 mo ago | NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (LUBAO-GUAGUA SECTION), PACKAGE 6, PROVINCE OF PAMPANGABridges, Roads | Completed | Region III | ₱211.7M |
| 21C00032 | 5 yrs 6 mo ago | BRIDGE PROGRAM-WIDENING OF PERMANENT BRIDGES, BAMBAN-CENTENNIAL BRIDGE (BOO102LZ) ALONG MANILA NORTH ROAD (PHASE IV), PROVINCE OF PAMPANGABridges | Completed | Region III | ₱40.2M |
| 20C00024 | 5 yrs 10 mo ago | NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (LUBAO-GUAGUA SECTION), PACKAGE 4, PROVINCE OF PAMPANGABridges | Completed | Region III | ₱144.7M |
| 20CI0064 | 5 yrs 11 mo ago | NETWORK DEVELOPMENT-ROAD WIDENING-PRIMARY ROADS,MANILA NORTH ROAD, KO087+701-KO088+340, KO088+860-KO089+200, KO089+854-KO090+104, KO090+118-KO090+470, MABALACAT CITY, PAMPANGARoads | Completed | Pampanga 3rd DEO | ₱33.7M |
| 20O00076 | 5 yrs 11 mo ago | DESIGN AND BUILD PROJECT FOR THE REPAIR/RENOVATION OF LANDBANK 1 BUILDING AT BUENDIA, GIL PUYAT, MAKATI CITYBuildings and Facilities | Completed | National Capital Region | ₱289.4M |
| 19Z00040 | 6 yrs 6 mo ago | CONTRACT PACKAGE 2A, BRIDGE CONSTRUCTION AND REPLACEMENT PROGRAM I, DESIGN AND BUILD BRIDGES IN LUZON (REGION III - NUEVA ECIJA, AURORA, PAMPANGA, ZAMBALES AND BATAAN)Bridges | On-Going | Bridges Management Cluster | ₱222.8M |
| 20CI0006 | 6 yrs 8 mo ago | CONVERGENCE SPECIAL SUPPORT PROGRAM;CONST/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES,INDUSTRIES AND ECONOMIC ZONES,CAMACHILES-SAPANG BIABAS-BICAL ROAD,MABALACAT CITY,PAMPANGARoads | Completed | Pampanga 3rd DEO | ₱34.3M |
| 19C00042 | 6 yrs 8 mo ago | FLOOD CONTROL WORKS-IMPROVEMENT/REHABILITATION OF GROUNDSILLS ALONG SACOBIA-BAMBAN RIVER, MABALACAT, PAMPANGAGAA 2019 OO-2 | Completed | Flood Control Management Cluster | ₱46.0M |
| 19Z00034 | 6 yrs 9 mo ago | PILOT CHANNELING AT LAGUNA LAKE FROM NAPINDAN RIVER TO MANGGAHAN FLOODWAY CHANNEL - PHASE IFlood Control and Drainage | Completed | Flood Control Management Cluster | ₱271.0M |
| 19Z00036 | 6 yrs 9 mo ago | CONSTRUCTION OF SMALL RIVER IMPOUNDING PROJECT (SRIP) AT PAPA RIVER, BRGY. STO. NIÑO, NUEVA ERA, ILOCOS NORTEFlood Control and Drainage | On-Going | Flood Control Management Cluster | ₱533.8M |
| 19CH0016 | 7 yrs 2 mo ago | ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-PRIMARY-JOSE ABAD SANTOS AVENUE (JASA) K0082+800-K0083+350, K0083+991-K0084+395, K0085+022-K0085+193, K0086+732-K0086+932, K0087+197-K0087+353, K0088-580-K0088+626, K0089+78Roads | Completed | Pampanga 2nd DEO | ₱96.4M |
| 19CH0010 | 7 yrs 4 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF GUMI FLOOD CONTROL, LUBAO, PAMPANGAFlood Control and Drainage | Completed | Pampanga 2nd DEO | ₱48.9M |
| 19C00014 | 7 yrs 4 mo ago | NETWORK DEVELOPMENT PROGRAMS-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (LUBAO-GUAGUA SECTION) PAMPANGA 2ND LEGISLATIVE DISTRICT, PAMPANGARoads | Completed | Region III | ₱192.7M |
| 18A00116 | 7 yrs 9 mo ago | CONSTRUCTION/REHABILITATION OF BOLO RIVER DAM, BRGY. SAN ISIDRO, DUMALNEG, ILOCOS NORTEFlood Control and Drainage | On-Going | Flood Control Management Cluster | ₱366.6M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.