BAQPRINCE CONSTRUCTION AND TRADING CORP.
Contractor c19f2c3c37e0e84c84ce
Overview
PhilGEPS awards
₱602.2M · 13 awards
DPWH contracts
₱5.66B · 172 contracts
Rank by recorded value
#546 of 23,487
More info
First record
Apr 3, 2016 (10 yrs 7 mo ago)
Latest record
Jun 9, 2025 (1 yr 5 mo ago)
DPWH contractor code
28337
Where they work
Latest 25 from a total of 172 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 20DF0131 | 5 yrs 11 mo ago | LOCAL PROGRAM - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, BUILDINGS AND OTHER STRUCTURES, SCHOOL BUILDINGS - CONSTRUCTION OF 3STY 15 CLASSROOM BUILDING, CAVITE STATE UNIVERSITY, CCAT CAMPUS, ROSARIOBuildings and Facilities | Completed | Cavite 1st DEO | ₱34.3M |
| 20DF0132 | 5 yrs 11 mo ago | LOCAL PROGRAM - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, BUILDINGS AND OTHER STRUCTURES, SCHOOL BUILDINGS - CONSTRUCTION OF 2STY 12 CLASSROOM BUILDING, CAVITE STATE UNIVERSITY, CCAT CAMPUS, ROSARIOBuildings and Facilities | Completed | Cavite 1st DEO | ₱37.2M |
| 20DF0133 | 5 yrs 11 mo ago | LOCAL PROGRAM - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, FLOOD CONTROL AND DRAINAGE, FLOOD CONTROL STRUCTURES/FACILITIES - CONSTRUCTION OF REVETMENT AT ALAPAN II-A (PHASE II), IMUS CITY, CAVITEFlood Control and Drainage | Completed | Cavite 1st DEO | ₱49.0M |
| 20DF0138 | 5 yrs 11 mo ago | LOCAL PROGRAM - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, FLOOD CONTROL AND DRAINAGE, FLOOD CONTROL STRUCTURES/FACILITIES - CONSTRUCTION OF REVETMENT ALONG ILANG-ILANG RIVER, BRGY. TAPIA, GENERAL TRFlood Control and Drainage | Completed | Cavite 1st DEO | ₱49.0M |
| 20DF0144 | 5 yrs 11 mo ago | LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, REHABILITATION OF TRECE-AMADEO ROAD, BRGY. CONCHU, TRECE MARTIRES CITY, CAVITERoads | Completed | Cavite 1st DEO | ₱19.8M |
| 20DF0208 | 6 yrs ago | REHABILITATION/IMPROVEMENT OF NOVELETA FIRE STATION, POBLACION, NOVELETA, CAVITEBuildings and Facilities | Completed | Cavite 1st DEO | ₱4.8M |
| 20DF0002 | 6 yrs 2 mo ago | ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJORFLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOODMITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF REVETMENTALONG ILANG-ILANG RIVER, PHASE 4, BRGY. MAGDIWFlood Control and Drainage | Completed | Cavite 1st DEO | ₱35.3M |
| 20DF0003 | 6 yrs 2 mo ago | ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJORFLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT ALONG ILANG-ILANG RIVER, PHASE III, BRGY. SAN AFlood Control and Drainage | Completed | Cavite 1st DEO | ₱37.2M |
| 20DF0009 | 6 yrs 2 mo ago | ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJORFLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOODMITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENTALONG ILANG-ILANG RIVER, PHASE 3, BRGY. MAGDFlood Control and Drainage | Completed | Cavite 1st DEO | ₱71.4M |
| 20DF0159 | 6 yrs 4 mo ago | ORGANIZATIONAL OUTCOME 1- NETWORK DEVELOPMENT, ROAD WIDENING, TERTIARY ROAD, CRISANTO M DELOS REYES AVE- K0056+031-K0056+332,K0057+505-K0058+560,K0063+220-K0063+595, AMADEO, CAVITEFlood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Rehabilitation - PCCP | Completed | Cavite 1st DEO | ₱54.0M |
| 20DF0085 | 6 yrs 8 mo ago | ORGANIZATIONAL OUTCOME 1, ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, TEJERO DIVERSION ROAD, SEGMENT 1, CAVITEFlood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - PCCP | Completed | Cavite 1st DEO | ₱55.5M |
| 20DF0086 | 6 yrs 8 mo ago | ORGANIZATIONAL OUTCOME 1, ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, TEJERO DIVERSION ROAD, SEGMENT 2, CAVITEFlood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - PCCP | Completed | Cavite 1st DEO | ₱55.5M |
| 20DF0088 | 6 yrs 8 mo ago | ORGANIZATIONAL OUTCOME 1, ENSURE SAFE AND RELIABLE NATIONAL SYSTEM, NETWORK DEVELOPMENT, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, GENERAL TRIAS-TANZA (MALABON GRANDE-SAN JUAN-MULAWIN-PUNTA) BYPASS ROAD, MULAWIN SECTION, CAVITEFlood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - PCCP | Completed | Cavite 1st DEO | ₱78.2M |
| 20DF0006 | 6 yrs 8 mo ago | ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJORFLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATIONFACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF REVETMENTALONG IMUS RIVERFlood Control and Drainage | Completed | Cavite 1st DEO | ₱49.0M |
| 20DF0033 | 6 yrs 8 mo ago | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM-REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, NOVELETA DIVERSION BR. (B02896LZ) ALONGNOVELETA DIV RDBridges | Completed | Cavite 1st DEO | ₱5.2M |
| 20DF0034 | 6 yrs 8 mo ago | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORKDEVELOPMENT, ROAD WIDENING - SECONDARY ROADS NOVELETA-ROSARIO DIV RD - K0026+(-123)-K0026+099Roads | Completed | Cavite 1st DEO | ₱8.3M |
| 20DF0073 | 6 yrs 8 mo ago | ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF REVETMENT ALONG CAÑAS RIVER, WEST SIDE SECTION. BRGY. TEJEFlood Control and Drainage | Completed | Cavite 1st DEO | ₱49.0M |
| 20DF0076 | 6 yrs 8 mo ago | ORGANIZATIONAL OUTCOME 1, ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM- WIDENING OF PERMANENT BRIDGES PAG-ASA BR. (B03407LZ) ALONG KAWIT-NOVELETA DIVERSION ROADBridges | Completed | Cavite 1st DEO | ₱8.3M |
| 20DF0081 | 6 yrs 8 mo ago | ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOODMANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENT ALONG ILANG ILANG RIVER, BRGY. PASONG KAWAYAN,Flood Control and Drainage | Completed | Cavite 1st DEO | ₱39.2M |
| 20DF0098 | 6 yrs 8 mo ago | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE - WIDENING OF PERMANENT BRIDGES - IMUS BR. (B02903LZ) ALONG CAVITE-BATANGAS RD.Bridges: Construction - Concrete (Superstructure) - with Cast-in-Place Piles, Roads: Construction - PCCP | Completed | Cavite 1st DEO | ₱32.6M |
| 19DF0147 | 7 yrs ago | FARM-TO-MARKET ROAD (FMR) PROJECTS -CONCRETING OF BRGY. SAHUD ULAN FMR, BRGY. SAHUD ULANTANZA, CAVITERoads | Completed | Cavite 1st DEO | ₱9.9M |
| 19DF0137 | 7 yrs 1 mo ago | LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, ASPHALT OVERLAY OF BRGY. SAN JUAN I ROAD, NOVELETA; REHAB/UPGRADE OF ROAD WITH DRAINAGE (LAKERSFIELD), BRGY. TOCLONG, KAWIT AND REHAB/UPGRADING OF ROAD ALONG DON PEDRO SUBD.Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - Asphalt, Roads: Construction - PCCP | Completed | Cavite 1st DEO | ₱6.4M |
| 19DF0127 | 7 yrs 1 mo ago | CONSTRUCTION OF 4STY 8CL SCHOOL BUILDING AT WAKAS ES, KAWIT, CAVITE AND CONSTRUCTION OF 2STY 4CL SCHOOL BUILDING AT BAGUMBUHAY ES, CAVITE CITYBuildings and Facilities | Completed | Cavite 1st DEO | ₱41.6M |
| 19DF0062 | 7 yrs 1 mo ago | LOCAL PROGRAM: LOCAL ROADS & BRIDGES- LOCAL ROADS- LOCAL INFRASTRUCTURE PROGRAM-ROAD OPENING OF MALABON GRANDE- SAN JUAN- MULAWIN ROAD W/ ROW ACQUISITION (GEN. TRIAS SECTION) GEN. TRIAS, CAVITEBridges: Construction - Concrete (Superstructure) - with Cast-in-Place Piles, Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - PCCP | Completed | Cavite 1st DEO | ₱49.5M |
| 19DF0119 | 7 yrs 2 mo ago | LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/ FACILITIES - REHABILITATION OF MPB BARANGAY HALL, BARANGAY 47-M, CAVITE CITY; REPAIR/REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY 48-M, CAVITBuildings: Construction - without Piles - Low Rise - Concrete (Frame) (1 to 5 Storeys), Buildings: Construction - without Piles - Low Rise - Steel (Frame) (1 to 5 Storeys) | Completed | Cavite 1st DEO | ₱10.3M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.