BAQPRINCE CONSTRUCTION AND TRADING CORP.
Contractor c19f2c3c37e0e84c84ce
Overview
PhilGEPS awards
₱602.2M · 13 awards
DPWH contracts
₱5.66B · 172 contracts
Rank by recorded value
#546 of 23,487
More info
First record
Apr 3, 2016 (10 yrs 7 mo ago)
Latest record
Jun 9, 2025 (1 yr 5 mo ago)
DPWH contractor code
28337
Where they work
Latest 25 from a total of 172 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 19DF0110 | 7 yrs 2 mo ago | LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/ FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BRGY. 59, CAVITE CITY; CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. 53-A, CAVBuildings: Construction - without Piles - Low Rise - Concrete (Frame) (1 to 5 Storeys), Buildings: Construction - without Piles - Low Rise - Steel (Frame) (1 to 5 Storeys) | Completed | Cavite 1st DEO | ₱10.9M |
| 19DF0116 | 7 yrs 2 mo ago | LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES - REHABILITATION OF FLEET TRAINING AND DOCTRINE CENTER BUILDING NO. 4 PHILIPPINE FLEET, PHILIPPINE NAVY, SANGLEY POINT, CAVITE CITYBuildings and Facilities | Completed | Cavite 1st DEO | ₱14.8M |
| 19DF0040 | 7 yrs 3 mo ago | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT - ROAD WIDENING, SECONDARY ROADS, DASMARIÑAS-TRECE MARTIRES CITY-NAIC ROAD, K0047+575 - K0049+650Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - PCCP | Completed | Cavite 1st DEO | ₱76.5M |
| 19DG0032 | 7 yrs 3 mo ago | CONST OF CONCRETE ROAD-GEN AGUINLDO-MAG-NASUGBU RD (EAST-WEST RD), MAG-GEN AGUINLDO SEC,GEN.AGUINLDORoads | Completed | Cavite 2nd DEO | ₱54.7M |
| 19DF0064 | 7 yrs 4 mo ago | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE & RELIAB;LE NATIONAL ROAD SYSTEM- NETWORK DEVELOPMENT, ROAD WIDENING, TERTIARY ROADS, CRISANTO M DELOS REYE AVE., K0054+(-410) - K0054+246, K0063+621-K0065+491, GEN. TRIAS & AMADEO, CAVITERoads | Completed | Cavite 1st DEO | ₱57.9M |
| 19DF0068 | 7 yrs 4 mo ago | LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, SCHOOL BUILDINGS - REHABILITATION OF SCHOOL BUILDING ( BALCONY GRILLS-LUCIANO ES), BARANGAY LUCIANO, TRECE MARTIRES CITY; MULTIPURPOSE/FACILITIES -CONSTRUCTION OF MULTI PURPOSEBuildings: Construction - without Piles - Low Rise - Steel (Frame) (1 to 5 Storeys), Buildings: Repair | Completed | Cavite 1st DEO | ₱14.8M |
| 19DF0073 | 7 yrs 4 mo ago | LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS-OPENING OF ROAD, MALABON GRANDE-SAN JUAN MULAWIN ROAD WITH ROW ACQUISITION (GENERAL TRIAS SECTION PHASE 2), GENERAL TRIAS CITY, CAVITERoads | Completed | Cavite 1st DEO | ₱49.5M |
| 19DF0086 | 7 yrs 4 mo ago | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS, TERTIARY ROADS - S DOCK JCT-AIRFIELD VIA SN JOSE PT RD - K0001+ -464 - K0001 +000, K0002+0Roads | Completed | Cavite 1st DEO | ₱63.5M |
| 19DF0087 | 7 yrs 4 mo ago | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - TERTIARY ROADS, S DOCK JCT-AIRFIELD VIA SN JOSE PT RD - K0001+000 - K0002+000; S DOCK JCT-AIRFIELD VIA MALINTA RD - K0001+ (-363Roads | Completed | Cavite 1st DEO | ₱80.3M |
| 19DF0030 | 7 yrs 4 mo ago | ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF REVETMENT ALONG JULIAN RIVER, BRGY. BAYAN LUMA SECTION, IFlood Control and Drainage | Completed | Cavite 1st DEO | ₱49.0M |
| 18DQ0133 | 7 yrs 9 mo ago | CONSTRUCTION OF FOUR (4) STOREY EIGHT (8) CLASSROOM SCHOOL BUILDING AT MAMBOG ELEMENTARY SCHOOL, BACOOR CITY, CAVITEBuildings and Facilities | Completed | Region IV-A | ₱23.9M |
| 18DF0141 | 8 yrs 2 mo ago | CONSTRUCTION OF 2STY 4CL SCHOOL BUILDING AT SALABAN ES; TAMAKAN ES;AND MAITIM ES, AMADEO, CAVITEBuildings and Facilities | Completed | Cavite 1st DEO | ₱27.1M |
| 18DF0142 | 8 yrs 2 mo ago | CONSTRUCTION OF 4STY 12CL SCHOOL BUILDING AT SANJA MAYOR ES,TANZA, CAVITEBuildings and Facilities | Completed | Cavite 1st DEO | ₱31.1M |
| 18DF0145 | 8 yrs 2 mo ago | CONSTRUCTION OF 4STY 20CL SCHOOL BUILDING AT PARADAHAN ES,TANZA, CAVITEBuildings and Facilities | On-Going | Cavite 1st DEO | ₱40.6M |
| 18DF0146 | 8 yrs 2 mo ago | CONSTRUCTION OF 4STY 20CL SCHOOL BUILDING AT AMAYA ES, TANZA, CAVITEBuildings and Facilities | On-Going | Cavite 1st DEO | ₱40.8M |
| 18DF0133 | 8 yrs 3 mo ago | CONSTRUCTION OF 3STY 6CL SCHOOL BUILDING AT DAGATAN ES, AMADEO, CAVITEBuildings and Facilities | On-Going | Cavite 1st DEO | ₱13.5M |
| 18DF0135 | 8 yrs 3 mo ago | CONSTRUCTION OF 4STY 12CL SCHOOL BUILDING AT STA. CRUZ (BUCAL) ES,TANZA, CAVITEBuildings and Facilities | Completed | Cavite 1st DEO | ₱31.5M |
| 18DF0138 | 8 yrs 3 mo ago | CONSTRUCTION OF 2STY 4CL SCHOOL BUILDING AT LOMA ES, AMADEO, CAVITEAND CONSTRUCTION OF 4STY 12CL SCHOOL BUILDING AT SUNNY BROOKEELEMENTARY SCHOOL, GEN. TRIAS CITYBuildings and Facilities | On-Going | Cavite 1st DEO | ₱42.1M |
| 18DF0081 | 8 yrs 6 mo ago | LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM, FLOOD CONTROL AND DRAINAGE,FLOOD CONTROL STRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL, KAWIT, CAVITEFlood Control and Drainage | Completed | Cavite 1st DEO | ₱949.8K |
| 18DF0082 | 8 yrs 6 mo ago | LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM, FLOOD CONTROL AND DRAINAGE,FLOOD CONTROL STRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL, KAWIT, CAVITEFlood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - PCCP | Completed | Cavite 1st DEO | ₱949.8K |
| 18DF0084 | 8 yrs 6 mo ago | LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM, FLOOD CONTROL AND DRAINAGE,DRAINAGE/PROTECTION WORKS, CONSTRUCTION OF CANAL LINING AND CONCRETING OF ROAD INBARANGAY SAPA 2 AND BARANGAY SAPA 3, ROSARIO, CAVITEBuildings: Construction - without Piles - Low Rise - Concrete (Frame) (1 to 5 Storeys), Buildings: Repair | Completed | Cavite 1st DEO | ₱11.3M |
| 18DQ0069 | 8 yrs 7 mo ago | CONSTRUCTION OF MULTIPURPOSE BUILDING, BRGY. MOLINO 2, BACOOR CITY, CAVITE, CONSTRUCTION OF MULTIPURPOSE BUILDING, BRGY. MOLINO 3, BACOOR CITY, CAVITE, CONSTRUCTION OF MULTIPURPOSE BUILDING, BRGY. MOLINO 4, BACOOR CITY, CAVITE AND CONSTRUCTION OF MULTIPURBuildings and Facilities | Completed | Region IV-A | ₱16.5M |
| 18DQ0035 | 8 yrs 7 mo ago | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM -CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS -TERTIARY ROADS -MARCOS ALVAREZ RD (S01783LZ) -CHAINAGE 0 TO CHAINAGE 1396Roads | Completed | Region IV-A | ₱27.6M |
| 18DG0047 | 8 yrs 9 mo ago | ORGANIZATIONAL OUTCOME 1: ROAD WIDENING-TERTIARY ROADS-INDANG-ALFONSO VIA LUKSUHIN RD. K0057+000 - KRoads | Completed | Cavite 2nd DEO | ₱21.5M |
| 18DG0030 | 8 yrs 9 mo ago | RET/STRENGHTENING OF PERM BRIDGES-ITALARO BR (B02520LZ) ALONG NOV-NAIC-TAG RD, INDANG,CAVITEBridges | Completed | Cavite 2nd DEO | ₱8.2M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.