NEWBIG FOUR J CONSTRUCTION INC.
Contractor df61ba145093b07f00e6
Overview
PhilGEPS awards
₱50.12B · 597 awards
DPWH contracts
₱30.73B · 383 contracts
Rank by recorded value
#14 of 23,487
More info
First record
Jan 15, 2009 (17 yrs 9 mo ago)
Latest record
Sep 7, 2026 (2 mos ago)
DPWH contractor code
15104
Where they work
Latest 25 from a total of 383 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 18FB0001 | 8 yrs 9 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION SYSTEM ALONG SUA-TUMPA RIVER, CAMALIG, ALBAYFlood Control and Drainage | Completed | Albay 2nd DEO | ₱94.1M |
| 18FB0008 | 8 yrs 9 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION SYSTEM ALONG LACAG-INARADO RIVER, DARAGA, ALBAYFlood Control and Drainage | Completed | Albay 2nd DEO | ₱46.3M |
| 18OE0033 | 8 yrs 9 mo ago | ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF LOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS BANK IMRPOVEMENT (STEEL SHEET PILE) ESTERO DE SAMPALOC, STA. 0+089.80 TO STA.Flood Control and Drainage | Completed | North Manila DEO | ₱46.5M |
| 18OE0046 | 8 yrs 9 mo ago | ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-BANK IMPROVEMENT (STEEL SHEET PILE) ESTERO DE SAMPALOC STA. 0+020.00 TO STA. 0Flood Control and Drainage | Completed | North Manila DEO | ₱46.5M |
| 18OE0054 | 8 yrs 9 mo ago | ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-BANK IMPROVEMENT (STEEL SHEET PILE) SETERO DE SAMPALOC, STA. 0+455.95 TO STA.Flood Control and Drainage | Completed | North Manila DEO | ₱46.5M |
| 17DH0128 | 8 yrs 10 mo ago | CONSTRUCTION OF THREE (3) STOREY, FIFTEEN (15) CLASSROOM SCHOOL BUILDING, SULIB E/S, PANGIL, LAGUNABuildings and Facilities | Completed | Laguna 1st DEO | ₱36.8M |
| 17FD0100 | 8 yrs 10 mo ago | CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BICOL RIVER AT BRGY. SAN JOSE, MINALABAC, CAMARINES SURFlood Control and Drainage | Completed | Camarines Sur 2nd DEO | ₱97.0M |
| 17FD0101 | 8 yrs 10 mo ago | CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BICOL RIVER, BRGY. BALIUAG VIEJO, MINALABAC, CAMARINES SURFlood Control and Drainage | Completed | Camarines Sur 2nd DEO | ₱97.0M |
| 17FD0102 | 8 yrs 10 mo ago | CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG BICOL RIVER, BRGY. BALIUAG NUEVO, MINALABAC, CAMARINES SURFlood Control and Drainage | Completed | Camarines Sur 2nd DEO | ₱97.0M |
| 17FD0103 | 8 yrs 10 mo ago | CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BICOL RIVER AT BRGY. TABAN, MINALABAC, CAMARINES SURFlood Control and Drainage | Completed | Camarines Sur 2nd DEO | ₱97.0M |
| 17FD0104 | 8 yrs 10 mo ago | CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BICOL RIVER AT BRGY. CATANUSAN, MINALABAC, CAMARINES SURFlood Control and Drainage | Completed | Camarines Sur 2nd DEO | ₱97.0M |
| 17OC0121 | 8 yrs 10 mo ago | CONSTRUCTION OF FOUR (4) STOREY FORTY EIGHT (48) CLASSROOM AT FOURTH ESTATE ELEMENTARY SCHOOL, PARAÑAQUE CITY, METRO MANILABuildings and Facilities | Completed | Metro Manila 2nd DEO | ₱115.7M |
| 17DP0123 | 8 yrs 10 mo ago | CONSTRUCTION OF FOUR (4) STOREY TWENTY (20) CLASSROOM AT TALANGAN NATIONAL HIGH SCHOOL, NAGCARLAN, LAGUNABuildings and Facilities | Completed | Laguna 3rd DEO | ₱40.9M |
| 17DP0124 | 8 yrs 10 mo ago | CONSTRUCTION OF FOUR (4) STOREY TWENTY (20) CLASSROOM AT DON ENRIQUE BAUTISTA ELEMENTARY SCHOOL, SAN PABLO CITY, LAGUNABuildings and Facilities | Completed | Laguna 3rd DEO | ₱41.0M |
| 17DP0133 | 8 yrs 10 mo ago | CONSTRUCTION OF FOUR (4) STOREY TWENTY (20) CLASSROOM AT SAN DIEGO ELEMENTARY SCHOOL, SAN PABLO CITY, LAGUNABuildings and Facilities | Completed | Laguna 3rd DEO | ₱40.8M |
| 17DH0095 | 8 yrs 10 mo ago | CONSTRUCTION OF THREE (3) STOREY, SIX (6) CLASSROOM SCHOOL BUILDING, C. LANUZA E/S, PAGSANJAN, LAGUNABuildings and Facilities | Completed | Laguna 1st DEO | ₱13.8M |
| 17DP0085 | 8 yrs 10 mo ago | CONSTRUCTION OF FOUR (4) STOREY SIXTEEN (16) CLASSROOM AT SAN ROQUE ELEMENTARY SCHOOL, SAN PABLO CITY, LAGUNABuildings and Facilities | Completed | Laguna 3rd DEO | ₱36.3M |
| 17DP0097 | 8 yrs 10 mo ago | CONSTRUCTION OF FOUR (4) STOREY SIXTEEN (16) CLASSROOM AT DEL REMEDIO ELEMENTARY SCHOOL, SAN PABLO CITY, LAGUNABuildings and Facilities | Completed | Laguna 3rd DEO | ₱37.8M |
| 17DP0099 | 8 yrs 10 mo ago | CONSTRUCTION OF FOUR (4) STOREY SIXTEEN (16) AT CLASSROOM AT PLACIDO ESCUDERO MEMORIAL SCHOOL, SAN PABLO CITY, LAGUNABuildings and Facilities | Completed | Laguna 3rd DEO | ₱36.4M |
| 17DP0104 | 8 yrs 10 mo ago | CONSTRUCTION OF FOUR (4) STOREY SIXTEEN (16) CLASSROOM AT SAN MIGUEL ELEMENTARY SCHOOL, SAN PABLO CITY, LAGUNABuildings and Facilities | Completed | Laguna 3rd DEO | ₱36.8M |
| 17DP0077 | 8 yrs 11 mo ago | CONSTRUCTION OF FOUR (4) STOREY TWELVE (12) CLASSROOM AT MAGCASEVILLE ELEMENTARY SCHOOL, SAN PABLO CITY, LAGUNABuildings and Facilities | Completed | Laguna 3rd DEO | ₱31.1M |
| 17FB0087 | 9 yrs 4 mo ago | ASPHALT OVERLAY WITH CORRECTIONS AT LEGAZPI CITY - PUNTA DE JESUS RD, K0540+300 - K0544+000Roads | Completed | Albay 2nd DEO | ₱48.0M |
| 17FB0090 | 9 yrs 4 mo ago | ASPHALT OVERLAY WITH CORRECTIONS AT BANQUEROHAN-BARIIS-SOGOY-SORSOGON BRDY. ROAD, K0549+928-K0551+592 & K0552+000-K0552+216, LEGAZPI CITYRoads | Completed | Albay 2nd DEO | ₱24.1M |
| 17F00021 | 9 yrs 4 mo ago | MFO1-NATIONAL ROAD NETWORK SERVICES-ASSET PRESERVATION OF NATIONAL ROADS, REHAB./RECONST. OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE:SECONDARY ROADS-LEGAZPI CITY-PUNTA DE JESUS ROAD, K0560+380-K0578+780 WITH EXCEPTIONS,MANITO, ALBAY 2ND LDFlood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - Slope Protection using Structural Measures (e.g. Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry) | Completed | Region V | ₱104.4M |
| 17DF0077 | 9 yrs 5 mo ago | LOCALLY FUNDED PROJECTS - LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHERSTRUCTURES, MULTIPURPOSE FACILITIES, CONSTRUCTION OF GRANDSTAND/STADIUM AND SPORTS FACILITIES, IMUS, CAVITEBuildings: Construction - without Piles - Low Rise - Concrete (Frame) (1 to 5 Storeys), Roads: Construction - Asphalt, Roads: Construction - PCCP | Completed | Cavite 1st DEO | ₱99.0M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.