NEWBIG FOUR J CONSTRUCTION INC.
Contractor df61ba145093b07f00e6
Overview
PhilGEPS awards
₱50.12B · 597 awards
DPWH contracts
₱30.73B · 383 contracts
Rank by recorded value
#14 of 23,487
More info
First record
Jan 15, 2009 (17 yrs 9 mo ago)
Latest record
Sep 7, 2026 (2 mos ago)
DPWH contractor code
15104
Where they work
Latest 25 from a total of 383 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 17OD0107 | 9 yrs 5 mo ago | REHABILITATION OF TALILONG CREEK, BRGY. 28, 31 AND 35, CALOOCAN CITYFlood Control and Drainage | Completed | Metro Manila 3rd DEO | ₱18.2M |
| 17OC0051 | 9 yrs 6 mo ago | UPGRADING OF DRAINAGE SYSTEM ALONG RUSSIA ST., BARANGAY DON BOSCO, PARAÑAQUE CITY, METRO MANILAFlood Control and Drainage | Completed | Metro Manila 2nd DEO | ₱14.2M |
| 17DH0036 | 9 yrs 6 mo ago | REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT4 (HDM-4) TERTIARY ROAD, PAETE-FAMY POBLACION ROAD, K0109 + 000 K0109Roads | Terminated | Laguna 1st DEO | ₱0 |
| 16O00043 | 9 yrs 7 mo ago | WIDENING OF KATIPUNAN AVENUE INCLUDING ROW, QUEZON CITYRoads | Terminated | National Capital Region | ₱48.3M |
| 17D00004 | 9 yrs 7 mo ago | MFO-1 - NAT'L. ROADS NETWORK SERVICES, NERTWORK DEV'T. IMPROVEMENT/WIDENING OF NATIONAL ROADS, SECONDARY ROADS PAGSANJAN-LUCBAN ROAD K0098+822.00 - K014+722.00, NET LENGTH = 6008 L.M., LAGUNA PROVINCEFlood Control/Hydraulics/Drainage, Roads: Construction - PCCP | Completed | Region IV-A | ₱144.5M |
| 17D00013 | 9 yrs 7 mo ago | MFO-2 FLOOD MANAGEMENT SERVICES FLOOD CONTROL AND RIVER IMPROVEMENT PROJECTS ALONG LAGUNA LAKE BASED ON METRO MANILA MASTER PLAN CONSTRUCTION OF SLOPE PROTECTION FOR STA. MARIA-MABITAC RIVER, LAGUNA 4TH L.D., LAGUNAFlood Control and Drainage | Completed | Region IV-A | ₱96.0M |
| 17DO0019 | 9 yrs 8 mo ago | LOCALLY-FUNDED-PROJECTS-LOCAL INFRASTRUCTURE PROGRAM (LIP)-FLOOD CONTROL AND DRAINAGE-FLOOD CONTROL STRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG UPPER MARIKINA RIVER, BARANGAY SAN JOSE TO BARANGAY BALITE, RODRIGUEZ RIZAL 2ND LDFlood Control and Drainage | Completed | Rizal 2nd DEO | ₱38.2M |
| 16OD0089 | 9 yrs 8 mo ago | REHABILITATION OF ROADS WITH DRAINAGE IMPROVEMENT ALONG F. ROXAS FROM 11TH AVE. TO 4TH AVE., CALOOCAN CITYFlood Control/Hydraulics/Drainage, Roads: Rehabilitation - PCCP | Completed | Metro Manila 3rd DEO | ₱27.3M |
| 17FB0035 | 9 yrs 8 mo ago | CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF SALUGAN-GAPO-TINAGO FLOOD CONTROL SYSTEM, GAPO SECTION, BRGY. GAPO, CAMALIG, ALBAY 2ND LDFlood Control and Drainage | Completed | Albay 2nd DEO | ₱39.1M |
| 17DO0012 | 9 yrs 8 mo ago | LOCALLY FUNDED PROJECTS-LOCAL INFRASTRUCTURE PROGRAM (LIP)-ROADS AND BRIDGES-NATIONAL ROADS-REPAIR/REHABILITATION/IMPROVMENT PREVENTIVE MAINTENANCE OF NATIONAL ROAD ALONG TANAY-SAMPALOC ROAD, K0057+(-685) TO K0074+900 TANAY RIZALRoads | Completed | Rizal 2nd DEO | ₱48.2M |
| 17FB0022 | 9 yrs 8 mo ago | CONSTRUCTION/IMPROVEMENT OF ILAWOD-LIGBAN FLOOD CONTROL SYSTEM, CAMALIG, ALBAYFlood Control and Drainage | Completed | Albay 2nd DEO | ₱49.5M |
| 17FB0023 | 9 yrs 8 mo ago | CONSTRUCTION/IMPROVEMENT OF BARANGAY 4-ILAWOD FLOOD CONTROL SYSTEM, CAMALIG, ALBAYFlood Control and Drainage | Completed | Albay 2nd DEO | ₱49.5M |
| 17DH0001 | 9 yrs 9 mo ago | CONSTRUCTION AND REHABILITATION OF RIVER CONTROL ALONG STA. CRUZ RIVER, BRGY. PATIMBAO, STA. CRUZ, LAGUNA, 4TH LDFlood Control and Drainage | Completed | Laguna 1st DEO | ₱42.1M |
| 17DH0002 | 9 yrs 9 mo ago | CONSTRUCTION OF RIVER CONTROL ALONG STA. CRUZ RIVER, BRGY. PAGSAWITAN, STA. CRUZ, LAGUNA, 4TH LDFlood Control and Drainage | Completed | Laguna 1st DEO | ₱31.2M |
| 17DH0004 | 9 yrs 9 mo ago | REHABILITATION OF RIVER CONTROL ALONG STA. CRUZ RIVER, BRGY. II POBLACION, BRGY. STO. ANGEL SUR AND BRGY. PATIMBAO, STA. CRUZ, LAGUNA, 4TH LDFlood Control and Drainage | Completed | Laguna 1st DEO | ₱43.0M |
| 17DH0005 | 9 yrs 9 mo ago | IMPROVEMENT/WIDENING OF NATIONAL ROADS, SECONDARY ROADS, RIZAL BDRY.-FAMY-QUEZON BDRY. ROAD (S01667LZ) K0076 + 135 - K0076 + 1031, LAGUNA 4TH DISTRICT, RIZAL BDRY.-FAMY-QUEZON BDRY. ROAD (S01667LZ) K0076 + 135 - K0076 + 1031Roads | Completed | Laguna 1st DEO | ₱43.1M |
| 17DH0024 | 9 yrs 9 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF RIVER CONTROL ALONG PAGSANJAN RIVER, BRGY. BALUBAD, LUMBAN, LAGUNA, 4TH LDFlood Control and Drainage | Completed | Laguna 1st DEO | ₱46.7M |
| 17DH0025 | 9 yrs 9 mo ago | ASSET PRESERVATION OF NATIONAL ROADS, REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SECONDARY AND TERTIARY ROADS, MARIKINA INFANTA ROAD, K0073 + 109 K0073 + 139, K0075 + 790 K0075 + 816Roads | Completed | Laguna 1st DEO | ₱34.8M |
| 17DH0028 | 9 yrs 9 mo ago | REPAIR/REHABILITATION/IMPROVEMENT (ASPHALT OVERLAY) ALONG CALAMBA-STA. CRUZ-FAMY JCT. ROAD, STA. CRUZ, LAGUNA, K0086 + 322 TO K0088 + 916Roads | Completed | Laguna 1st DEO | ₱41.6M |
| 17DH0031 | 9 yrs 9 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF RIVER CONTROL ALONG PAGSANJAN RIVER, BRGY. SAN ISIDRO, PAGSANJAN, LAGUNA, 4TH LDFlood Control and Drainage | Completed | Laguna 1st DEO | ₱46.5M |
| 17DI0022 | 9 yrs 9 mo ago | CONSTRUCTION/ REHABILITATION OF RIVER CONTROL STRUCTURES ALONG STA. ROSA RIVER, BRGY. BALIBAGO, STA. ROSA CITY, LAGUNA 1ST L.D.Flood Control and Drainage | Completed | Laguna 2nd DEO | ₱45.5M |
| 16O00011 | 9 yrs 10 mo ago | CONST. OF ROAD NETWORK INCLUDING DRAINAGE/SIDEWALK ON BOTH SIDES, UP DILIMAN, Q.C.Flood Control/Hydraulics/Drainage, Roads: Construction - PCCP | Completed | National Capital Region | ₱125.1M |
| 16DP0024 | 10 yrs 2 mo ago | CONSTRUCTION OF SAN PABLO CITY SENIOR HIGH SCHOOL (STAND ALONE), SAN PABLO CITY, FOUR (4) STOREY SIXTEEN (16) CLASSROOMBuildings and Facilities | Completed | Laguna 3rd DEO | ₱86.8M |
| 16DP0032 | 10 yrs 3 mo ago | CONSTRUCTION OF CRISTOBAL S. CONDUCTO MNHS RIZAL FOUR (4) STOREY TWELVE (12) CLASSROOM, RIZAL, LAGUNA 3RD LDBuildings and Facilities | Completed | Laguna 3rd DEO | ₱23.8M |
| 16DI0060 | 10 yrs 7 mo ago | CONST./ MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYS.- FLOOD CONTROL CONST. OF REVETMENT AT SAN ISIDRO RIVER, BRGY. SAN ANTONIO & BRGY. SAN VICENTE, SAN PEDRO CITY, LAGUNAFlood Control and Drainage | Completed | Laguna 2nd DEO | ₱47.1M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.