FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO
Contractor f5e9875bb0d766523be2
Overview
PhilGEPS awards
₱0 · 0 awards
DPWH contracts
₱20.88B · 377 contracts
Rank by recorded value
#140 of 23,487
More info
First record
Jan 21, 2016 (10 yrs 9 mo ago)
Latest record
Jul 22, 2025 (1 yr 3 mo ago)
DPWH contractor code
16916
Where they work
Latest 25 from a total of 377 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 25CP0140 | 1 yr 3 mo ago | CONVERGE. AND SPECIAL SUPPORT PROG. BASIC INFRA. PROG. (BIP) - BIP - FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/STRATEGIC PUBLIC BLDGS./FACILITIES-CONST. OF FLOOD CONTROL STRUCT, SAN MIGUEL RIVER, BRGY. LABNE,SAN MIGUEL, BULACAN, PACKAGE 12Flood Control and Drainage | On-Going | Bulacan 3rd DEO | ₱97.4M |
| 25C00005 | 1 yr 4 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF FLOOD CONTROL STRUCTURE, BRGY. MIJARES, DIPACULAO, AURORAGAA 2025 SSP | On-Going | Region III | ₱144.7M |
| 25OD0316 | 1 yr 4 mo ago | CONSTRUCTION OF MULTI-PURPOSE BUILDING (VALACE LEARNING CENTER) AT GEN. T. DE LEON NATIONAL HIGH SCHOOL, VALENZUELA CITYBuildings and Facilities | On-Going | Metro Manila 3rd DEO | ₱68.8M |
| 25OD0352 | 1 yr 4 mo ago | CONSTRUCTION OF MULTI-PURPOSE BUILDING (AMPITHEATER) AT GEN T. DE LEON NATIONAL HIGH SCHOOL, GEN. T. DE LEON, VALENZUELA CITYBuildings and Facilities | On-Going | Metro Manila 3rd DEO | ₱91.8M |
| 25CP0043 | 1 yr 4 mo ago | FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF BUGA-SALACOT CONCRETE SLOPE PROTECTION ALONG BULO RIVER SECTION, SAN MIGUEL,BULACAN (UPSTREAM DIKE,PACKAGE 1)Flood Control and Drainage | On-Going | Bulacan 3rd DEO | ₱47.5M |
| 25CP0139 | 1 yr 4 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRA. PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCT. PROTECTING MAJOR/STRAT. PUBLIC BUILDINGS/FACILITIES - CONST. OF CONCRETE FLOOD CONTROL STRUCTURE, SAN MIGUEL RIVER, BRGY LABNE, SAN MIGUEL, BULACAN,PACKAGE 11Flood Control and Drainage | On-Going | Bulacan 3rd DEO | ₱97.5M |
| 25CP0145 | 1 yr 4 mo ago | CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRA.PROG. (BIP) - BIP - FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/ STRATEGIC PUBLIC BLDGS./ FACILITIES - CONST. OF FLOOD CONTROL STRUCTS,. SAN MIGUEL RIVER, BRGY. LABNE, SAN MIGUEL, BULACAN, (PACKAGE 13)GAA 2025 SSP | On-Going | Bulacan 3rd DEO | ₱97.5M |
| 25CJ0234 | 1 yr 4 mo ago | CONSTRUCTION OF CAMILING - BAYAMBANG DIVERSION ROAD (SEGMENT 3), CAMILING, TARLACGAA 2025 SSP | On-Going | Tarlac DEO | ₱95.3M |
| 25CJ0235 | 1 yr 4 mo ago | CONSTRUCTION OF STA. IGNACIA - MAYANTOC DIVERSION ROAD (SEGMENT 1), TARLACGAA 2025 SSP | On-Going | Tarlac DEO | ₱95.5M |
| 25C00034 | 1 yr 5 mo ago | ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS, MAHARLIKA HIGHWAY, PROVINCE OF BULACANGAA 2025 OO-1 | Completed | Region III | ₱7.6M |
| 25C00035 | 1 yr 5 mo ago | ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS, MAHARLIKA HIGHWAY, PROVINCE OF BULACANGAA 2025 OO-1 | Completed | Region III | ₱18.4M |
| 25CP0041 | 1 yr 5 mo ago | FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SALACOT - ILOG BULO CONCRETE SLOPE PROTECTION ALONG BULO RIVER SECTION, SAN MIGUEL, BULACAN (UPSTREAM DIKE, PACKAGE 1)Flood Control and Drainage | On-Going | Bulacan 3rd DEO | ₱47.5M |
| 25CP0042 | 1 yr 5 mo ago | FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SALACOT - ILOG BULO CONCRETE SLOPE PROTECTION ALONG BULO RIVER SECTION, SAN MIGUEL, BULACAN (UPSTREAM DIKE, PACKAGE 2)Flood Control and Drainage | On-Going | Bulacan 3rd DEO | ₱47.5M |
| 25CP0059 | 1 yr 5 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF SAN ILDEFONSO BYPASS ROAD,GABIHAN-BASURoads | On-Going | Bulacan 3rd DEO | ₱95.1M |
| 24O00224 | 1 yr 5 mo ago | ESTABLISHMENT OF THE DOST-NCR SCIENCE AND TECHNOLOGY RESOURCE AND INCUBATION CENTER (STRIC)Trust Funds 2024 | On-Going | National Capital Region | ₱140.4M |
| 25C00227 | 1 yr 6 mo ago | NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAN ILDEFONSO-SAN MIGUEL BY-PASS ROAD, SAN ILDEFONSO AND SAN MIGUEL (PACKAGE 3), PROVINCE OF BULACANGAA 2025 OO-1 | On-Going | Region III | ₱86.8M |
| 25C00498 | 1 yr 6 mo ago | NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAN ILDEFONSO-SAN MIGUEL BYPASS ROAD, SAN ILDEFONSO AND SAN MIGUEL (PACKAGE 1), PROVINCE OF BULACANGAA 2025 OO-1 | On-Going | Region III | ₱188.3M |
| 25CP0065 | 1 yr 6 mo ago | CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONST.OF ROAD, PHASE I, SITIO PELON, BARANGAY CAMACHRoads | On-Going | Bulacan 3rd DEO | ₱142.6M |
| 25CP0071 | 1 yr 6 mo ago | CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJ. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONST. OF ROAD, PHASE II, SITIO PELON, BARANGAY CAMACRoads | On-Going | Bulacan 3rd DEO | ₱142.6M |
| 25CP0075 | 1 yr 6 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF ROAD,PHASE III,SITIO PELON,BRGY. CAMACHIRoads | On-Going | Bulacan 3rd DEO | ₱142.5M |
| 25CP0079 | 1 yr 6 mo ago | CONVERG. AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATL. ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF ROAD, PHASE IV, SITIO PELON, BRGY. CAMACHILERoads | On-Going | Bulacan 3rd DEO | ₱142.4M |
| 25CJ0213 | 1 yr 7 mo ago | CONSTRUCTION OF BANK SLOPE ALONG MASALASA CREEK, TARLAC CITY, TARLAC (SEGMENT 42)GAA 2025 SSP | On-Going | Tarlac DEO | ₱95.8M |
| 25OD0139 | 1 yr 7 mo ago | CONSTRUCTION OF FLOOD CONTROL WALL ALONG LINGUNAN CREEK STA 0+300 TO STA. 0+600, BRGY. LINGUNAN, VALENZUELA CITYGAA 2025 SSP | Completed | Metro Manila 3rd DEO | ₱145.8M |
| 25CJ0042 | 1 yr 7 mo ago | REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS CAPAS-SAN JOSE-MAYANTOC-MALACAMPA RD - K0139 + 940 - K0140 + 707GAA 2025 OO-1 | On-Going | Tarlac DEO | ₱17.8M |
| 25CJ0139 | 1 yr 7 mo ago | ROAD WIDENING ROMULO H-WAY - K0150 + 192 - K0150 + 330GAA 2025 OO-1 | Completed | Tarlac DEO | ₱15.5M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.