MAI CONSTRUCTION AND SUPPLY
Contractor f87ca4e7b0049aac0ecb
Overview
PhilGEPS awards
₱1.55B · 383 awards
DPWH contracts
₱846.8M · 175 contracts
Rank by recorded value
#1,266 of 23,487
More info
First record
Mar 22, 2013 (13 yrs 7 mo ago)
Latest record
Mar 24, 2026 (7 mos ago)
DPWH contractor code
30839
Where they work
Latest 25 from a total of 175 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 20HC0097 | 6 yrs 8 mo ago | REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. ONDOL, INABANGA, BOHOLBuildings and Facilities | Completed | Bohol 2nd DEO | ₱792.5K |
| 20HC0119 | 6 yrs 8 mo ago | REHABILITATION OF MULTI-PURPOSE BUILDING BRGY. TUBOG, UBAY, BOHOLBuildings and Facilities | Completed | Bohol 2nd DEO | ₱830.0K |
| 20HJ0038 | 6 yrs 9 mo ago | ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS ALONG MABINAY-AYUNGON RD (S00319NR), AYUNGON, NEGROS ORIENTALRoads | Completed | Negros Oriental 1st DEO | ₱10.0M |
| 19HJ0109 | 6 yrs 10 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS-RAINWATER COLLECTION SYSTEM:CONSTRUCTION OF TWENTY (20) UNITS OF RAINWATER COLLECTION SYSTEM (RWCS) AT NEGROS ORIENTAL 1ST ENGINWater Provision and Storage | Completed | Negros Oriental 1st DEO | ₱3.7M |
| 19HC0116 | 6 yrs 11 mo ago | CONCRETING OF LILOAN SUR - NAPO FMR, BRGYS. LILOAN SUR AND NAPO, INABANGA, BOHOLRoads | Completed | Bohol 2nd DEO | ₱4.7M |
| 19HC0198 | 6 yrs 11 mo ago | CONSTRUCTION OF RAINWATER COLLECTOR SYSTEM (FY 2019) 20 UNITS, BOHOL 2ND DISTRICT ENGINEERING OFFICEWater Provision and Storage | Completed | Bohol 2nd DEO | ₱3.6M |
| 19HJ0068 | 7 yrs 2 mo ago | CONSTRUCTION OF 1 UNIT ONE- STOREY TWO CLASSROOM SCHOOL BUILDING W/ TOILET ATTACHED AT EACH CLASSROOM (9.5MX18M) AT NABHANG ES, NABHANG, AYUNGON, NEGROS ORIENTALBuildings and Facilities | Completed | Negros Oriental 1st DEO | ₱4.3M |
| 19HC0182 | 7 yrs 2 mo ago | CONSTRUCTION OF 2 UNITS BOX CULVERT ALONG LILOAN SUR- NAPO BARANGAY ROAD, INABANGA, BOHOLFlood Control and Drainage | Completed | Bohol 2nd DEO | ₱1.9M |
| 19HC0036 | 7 yrs 3 mo ago | CY 2019- LIP- REHABILITATION OF MULTI-PURPOSE BUILDING AT: CLUSTER 1 A. BUENAVISTA, BOHOL 1.)BRGY. CAMBUHAT 2.)BRGY. CANTORES 3.)BRGY. CANTUBA 4.)BRGY. CRUZ 5.)BRGY. MAGKAYA 6.)BRGY. OVERLAND 7.)BRGY. PANGHAGBAN 8.)BRGY. POBLACION AND 9.)BRGY. DAITBuildings and Facilities | Completed | Bohol 2nd DEO | ₱6.5M |
| 19HC0042 | 7 yrs 3 mo ago | CY 2019- LIP- REPAIR/REHAB. & CONST./IMPVT. OF MULTI-PURPOSE BUILDING AT: CLUSTER 4 A. PRES. C.P. GARCIA (ISLAND) 1.)TUGAS 2.)BRGY. TUGNAO B. UBAY 1.)TAPAL 2.)CALANGGAMAN 3.)BIABAS TRADE HIGH SCHOOL, BRGY BIABAS 4.)SIMULATION AND THERAPY ACTIVITY CENTERBuildings and Facilities | Completed | Bohol 2nd DEO | ₱4.0M |
| 19HC0008 | 7 yrs 3 mo ago | 002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF MAUBID RIVER CONROL, BUENAVISTA, BOHOLFlood Control and Drainage | Completed | Bohol 2nd DEO | ₱10.6M |
| 19HC0044 | 7 yrs 3 mo ago | CY 2019- LIP- REPAIR/REHABILITATION OF MULTI-PURPOSE BUILDING AT: CLUSTER 7 A. INABANGA 1.)BRGY. BADIANG 2.)BRGY. DAGNAWAN 3.)BRGY. ILAUD (POB.) 4.)BRGY. POBLACION 5.)BRGY. TAMBOOK 6.)BRGY. UBOJAN 7.)BRGY. U-OG 8.)BRGY. SAABuildings and Facilities | Completed | Bohol 2nd DEO | ₱5.7M |
| 19HC0118 | 7 yrs 3 mo ago | CONSTRUCTION/IMPROVEMENT OF MULTIPURPOSE BUILDING, CAMPAMANOG, PRES. C.P. GARCIA, BOHOLBuildings and Facilities | Completed | Bohol 2nd DEO | ₱970.0K |
| 19HC0125 | 7 yrs 3 mo ago | CONSTRUCTION/IMPROVEMENT OF MULTIPURPOSE BUILDING, AGUINING, PRES. C.P. GARCIA, BOHOLBuildings and Facilities | Completed | Bohol 2nd DEO | ₱970.0K |
| 19HC0130 | 7 yrs 3 mo ago | 002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF WAHIG RIVER CONTROL (LIR - WAHIG BR.), DAGOHOY, BOHOLFlood Control and Drainage | Completed | Bohol 2nd DEO | ₱4.7M |
| 18HJ0125 | 7 yrs 10 mo ago | CONSTRUCTION OF 2 UNITS ONE STOREY TWO CLASSROOM SCHOOL BUILDING W/TOILET ATTACHED AT EACH CLASSROOM (7.0MX18.0M PLUS CORRIDOR) AT LAMIGAN ES AYUNGON, NEGROS ORIENTALBuildings and Facilities | Completed | Negros Oriental 1st DEO | ₱8.0M |
| 18HC0132 | 7 yrs 11 mo ago | MODIFIED STANDARD DPWH-DEPED TWO(2) STOREY (4) CLASSROOM SCHOOL BUILDING (SCIENCE LABORATORY & ICT LABORATORY) AT BONBONON HIGH SCHOOL, PRES. CARLOS P. GARCIA (PITOGO), BOHOLBuildings and Facilities | Completed | Bohol 2nd DEO | ₱10.7M |
| 18HC0148 | 7 yrs 11 mo ago | MODIFIED STANDARD DPWH-DEPED TWO (2) STOREY (4) CLASSROOM SCHOOL BUILDING (SCIENCE LABORATORY & ICT LABORATORY) AT GAUS HIGH SCHOOL PRES. CARLOS P. GARCIA, BOHOLBuildings and Facilities | Completed | Bohol 2nd DEO | ₱10.7M |
| 18HC0151 | 7 yrs 11 mo ago | MODIFIED STANDARD DPWH-DEPED TWO (2) STOREY (4) CLASSROOM SCHOOL BUILDING (SCIENCE LABORATORY & ICT LABORATORY) AT PANGHAGBAN HS, BUENAVISTA, BOHOLBuildings and Facilities | Completed | Bohol 2nd DEO | ₱10.2M |
| 18HJ0075 | 8 yrs 3 mo ago | CONCRETING OF BRGY. TIBYAWAN FMR, BRGY. TIBYAWAN, AYUNGON, NEGROS ORIENTALRoads | Completed | Negros Oriental 1st DEO | ₱4.7M |
| 18HC0081 | 8 yrs 4 mo ago | CONSTRUCTION OF FOOT BRIDGE, BARANGAY KAWAYAN TO NAPO, INABANGA, BOHOLBridges | Completed | Bohol 2nd DEO | ₱6.8M |
| 18HC0065 | 8 yrs 4 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM AT WAHIG RIVER CONTROL (SDR)-CANTIWAS BRIDGE, POBLACION, DANAO, BOHOLFlood Control and Drainage | Completed | Bohol 2nd DEO | ₱9.3M |
| 18HJ0021 | 8 yrs 4 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BRGY. SAN JOSE, MANJUYOD, NEGROS ORIENTALFlood Control and Drainage | Completed | Negros Oriental 1st DEO | ₱1.9M |
| 18HJ0067 | 8 yrs 5 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWAGE/RAIN WATER COLLECTORS - RAIN WATER COLLECTION SYSTEM: CONSTRUCTION OF SEVENTEEN (17) UNITS OF RAINWATER COLLECTION SYSTEM (RWCS), NEGROS ORIENTAL 1STWater Provision and Storage | Completed | Negros Oriental 1st DEO | ₱3.2M |
| 18HC0062 | 8 yrs 5 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM AT MAUBID RIVER CONTROL, BUENAVISTA, BOHOLFlood Control and Drainage | Completed | Bohol 2nd DEO | ₱4.7M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.