Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Department of Public Works and Highways (DPWH)

GAA department code 18 · All departments

FY2026 GAA

₱530,898,861,000.00
201,782 line items

FY2027 NEP (proposed)

₱643,953,276,000.00
+21.3% vs FY2026 GAA (₱113.05B)

Where the money goes (FY2026)

Personnel Services₱15.56B
Maintenance and Other Operating Expenses₱18.41B
Capital Outlays₱496.93B

Appropriations per year

₱0₱500B₱1.0T₱1.5T₱2.0TFY2020: ₱581,674,912,000.002020FY2021: ₱695,672,672,000.002021FY2022: ₱786,600,136,000.002022FY2023: ₱894,165,876,000.002023FY2024: ₱997,884,938,000.002024FY2025: ₱1,088,800,308,000.002025FY2026: ₱530,898,861,000.002026

Programs, activities & projects (149,342)

Program / activity / projectFY2025FY2026Change
General Management and Supervision18-001₱13.87B₱17.24B+24%
Maintenance, Repair and Rehabilitation of Infrastructure Facilities and Other Related Activities — Routine Maintenance of National Roads18-001₱1.67B₱8.50B+411%
Payments of Right-Of-Way (ROW) — Various Completed Projects18-001₱500.0M₱3.90B+680%
Improving Growth Corridors in Mindanao Road Sector Project (IGCMRSP), ADB Loan No. 3631-PHI18-001₱964.7M₱1.85B+92%
Pasig — Marikina River Channel Improvement Project (PMRCIP), Phase IV, JICA, PH-P27118-001₱2.56B₱1.83B-28%
Maintenance, Repair and Rehabilitation of Infrastructure Facilities and Other Related Activities — Maintenance, Repair and Rehabilitation of Infrastructure Facilities — Flood Control and Drainage Systems, Structures and Related Facilities18-001₱700.0M₱1.80B+157%
Maintenance, Repair and Rehabilitation of Infrastructure Facilities and Other Related Activities — Routine Maintenance of National Bridges18-001₱463.1M₱1.79B+286%
Priority Bridges Crossing Pasig — Marikina River and Manggahan Floodway Bridges Construction Project, under China Government Financing Facility CEXIM Loan Nos. PBC20220200569 and PBC20220210570 and CIDCA Loan Nos. GCL20220100767 and GCL2022011076818-001₱1.82B₱1.59B-13%
Cebu-Mactan Bridge (4th Bridge) and Coastal Road Construction Project, JICA Loan No. PH-P27418-001₱1.23B₱1.49B+22%
Maintenance, Repair and Rehabilitation of Infrastructure Facilities and Other Related Activities — Maintenance and Operations of DPWH Floating Equipment18-001₱439.9M₱1.34B+205%
Rehabilitation of Disaster-Related Infrastructure and Other Facilities18-001₱1.00B₱1.20B+20%
Detailed Engineering of Various DPWH Projects18-001₱594.5M₱1.08B+82%
Payments of Contractual Obligations, VAT and Other Taxes18-001₱200.0M₱1.00B+400%
Tarlac-Pangasinan-La Union Expressway; NLEX-SLEX Connector Road Project; Cavite-Laguna Expressway Project; Muntinlupa-Cavite Expressway (Daang Hari-SLEX Link Road); NAIA Expressway; Quirino Highway Project; DPWH Central Office Building; Central Luzon Link Expressway (CLLEX), Phase II (PPP hybrid modality) (Region III); North Luzon Expressway East (NLEE) Phase I and II (Region III); Metro Cebu Expressway (Region VII); Iloilo-Capiz-Aklan Expressway (ICAX) (Region VI); Naawan-Opol-Cagayan de Oro-Villanueva Expressway Project (Region X); Dingalan-Capas-Botolan Expressway Project (Region III); Pangasinan-Nueva Ecija Expressway (PaNEX) (Region I & III); Cavite-Tagaytay-Batangas Expressway (CTBEX) (Region IV-A); Tarlac-Pangasinan-La Union Expressway (TPLEX) Extension Project (Region I); Boracay Bridge Projects (Region VI); Pacific Eastern Seaboard Expressway (Region III & IV-A); Mindoro-Batangas Super Bridge (Region IV-A & IV-B); Rehabilitation/ Reconstruction/ Improvement, Operation & Maintenance of Kennon Road Project (CAR); and such other priority Public-Private Partnership Infrastructure Projects18-001₱1.40B₱1.00B-28%
Davao City Bypass Construction Project (III) (South and Center Sections), Package I, JICA Loan No. PH-P28218-001₱145.5M₱952.8M+555%
Payments of Right — Of — Way ( ROW ) — Various On — going Projects18-001₱0₱900.0MNew
Bataan-Cavite Interlink Bridge (BCIB) Project, ADB Loan No. 4432 — PHI18-001₱2.15B₱866.4M-60%
Pancian Viaduct, K0 578+755 — K0579+295 along Manila, Ilocos Norte18-001₱0₱829.5MNew
Laguna-Lakeshore Road Network (LLRN) Project, ADB18-001₱1.08B₱758.0M-30%
Integrated Flood Resilience and Adaptation 1 (InFRA 1) Project, ADB Loan No. 4345-PHI18-001₱1.12B₱648.9M-42%
Maintenance, Repair and Rehabilitation of Infrastructure Facilities and Other Related Activities — Maintenance, Repair and Rehabilitation of Infrastructure Facilities — Public Buildings18-001₱406.5M₱645.0M+59%
Davao City Bypass Construction Project (II) (South and Center Sections), Package I, JICA Loan No. PH-P27318-001₱810.9M₱628.6M-22%
Maintenance, Repair and Rehabilitation of Infrastructure Facilities and Other Related Activities — Repair and Maintenance of Road Safety Facilities18-001₱688.6M₱600.0M-13%
Administration of Personnel Benefits18-001₱458.8M₱579.4M+26%
Infrastructure Preparation and Innovation Facility (IPIF), 2nd Additional Financing, Output 2; Water Projects, ADB Loan No. 4424 — PHI18-001₱235.5M₱571.5M+143%
Programs present in the FY2026 GAA, with their earlier years where the same line existed.

Source: Philippine Budget Data API (BetterGov.ph), https://budget.bettergov.ph/api/v1 (CC BY 4.0), snapshot Nov 10, 2026.