J. H. PAJARA CONSTRUCTION CORPORATION
Contractor 0165921673b80eeb0a26
Overview
PhilGEPS awards
₱4.83B · 43 awards
DPWH contracts
₱2.60B · 29 contracts
Rank by recorded value
#468 of 23,487
More info
First record
Jul 27, 2012 (14 yrs 3 mo ago)
Latest record
May 8, 2025 (1 yr 6 mo ago)
DPWH contractor code
1890
Where they work
Latest 25 from a total of 29 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 25O00085 | 1 yr 6 mo ago | ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - IMPROVEMENT OF EPIFANIO DELOS SANTOS AVE (EDSA)-K0031+612 - K0032+284GAA 2025 LS Itemization | On-Going | National Capital Region | ₱180.8M |
| 25O00006 | 1 yr 8 mo ago | RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - EDSA/ORTIGAS INTERCHANGE (B03316LZ) ALONG EDSA/ORTIGAS INTERCHANGEBridges | On-Going | National Capital Region | ₱19.1M |
| 25O00007 | 1 yr 8 mo ago | RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - EDSA/ORTIGAS INTERCHANGE (B03317LZ) ALONG EDSA/ORTIGAS INTERCHANGE, PHASE 2Bridges | On-Going | National Capital Region | ₱19.1M |
| 24O00026 | 2 yrs 4 mo ago | CONSTRUCTION OF ROAD, PASIG RIVER ESPLANADE FROM AYALA BRIDGE TO JONES BRIDGE ALONG PASIG RIVER, MANILA (PHASE III)GAA 2024 SSP | On-Going | National Capital Region | ₱14.1M |
| 24OB0416 | 2 yrs 7 mo ago | CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY PAG-ASA, MANDALUYONG CITYGAA 2024 SSP | On-Going | Metro Manila 1st DEO | ₱39.0M |
| 24O00003 | 2 yrs 8 mo ago | RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - QUEZON BR. (B03195LZ) ALONG QUEZON BLVD EXTNGAA 2024 OO-1 | On-Going | National Capital Region | ₱149.6M |
| 23O00002 | 3 yrs 3 mo ago | CONSTRUCTION OF ROAD, PASIG RIVER ESPLANADE FROM AYALA BRIDGE TO JONES BRIDGE ALONG PASIG RIVER, MANILA (PHASE II) (RE-ADVERTISEMENT)Roads | On-Going | National Capital Region | ₱76.0M |
| 23O00001 | 3 yrs 6 mo ago | NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS: ALABANG-ZAPOTE DIVERSION ROAD, LAS PIÑAS CITY (RE-ADVERTISEMENT)GAA 2023 OO-1 | On-Going | National Capital Region | ₱167.3M |
| 22O00071 | 4 yrs 4 mo ago | NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS: ALABANG-ZAPOTE DIVERSION ROAD (FROM ALABANG-ZAPOTE FLYOVER TO C-5 BRIDGE), LAS PIÑAS CITYRoads | On-Going | National Capital Region | ₱76.1M |
| 22OC0060 | 4 yrs 8 mo ago | PROPOSED CONSTRUCTION OF BOX CULVERT WITH REVETMENT WALL/SHEETPILING ALONG COASTAL ROAD (NORTH SIDE), DISTRICT I,PARAÑAQUE CITY, METRO MANILAFlood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry) | Completed | Metro Manila 2nd DEO | ₱96.5M |
| 21B00068 | 4 yrs 9 mo ago | OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL SYSTEM, BRGY. SALINAS, BAMBANG, NUFlood Control and Drainage | Completed | Region II | ₱117.4M |
| 21O00090 | 5 yrs 1 mo ago | CONSTRUCTION OF BY-PASS AND DIVERSION ROADS ALABANG ZAPOTE DIVERSION ROAD, LAS PIÑAS CITYGAA 2021 OO-1 | On-Going | National Capital Region | ₱135.9M |
| 21ID0056 | 5 yrs 4 mo ago | NETWORK DEVELOPMENT PROGRAM- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS LA PAZ DIVERSION ROAD ,LEYTEBridges, Roads | Completed | Leyte 2nd DEO | ₱48.8M |
| 20Z00020 | 5 yrs 7 mo ago | METRO CEBU FLOOD CONTROL PROJECT-FLOOD CONTROL AND DRAINAGE IMPROVEMENT PROJECT, TIPOLO RIVER, GUIZO, MANTUYONG AND TIPOLO, MANDAUE CITY, CEBUFlood Control and Drainage | Completed | Flood Control Management Cluster | ₱162.8M |
| 20E00069 | 5 yrs 11 mo ago | LIP- CONSTRUCTION OF CORON-CULION INTER-ISLAND BRIDGES-TRAVERSE BRGY. BINTUAN IN CORON TO BRGY. JARDIN IN CULION, PALAWANGAA 2020 LP | Terminated | MIMAROPA Region | ₱51.9M |
| 20ID0014 | 5 yrs 11 mo ago | ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,SLOPE COLLAPSE AND LANDSLIDE-PRIMARY ROADS-PALO-CARIGARA-ORMOC RD.-K0969+ 503 -K0970+(024.80),K0970+114-K0970 + 198Roads | Completed | Leyte 2nd DEO | ₱37.9M |
| 20O00077 | 6 yrs 1 mo ago | CONSTRUCTION OF BRIDGE ACROSS PARANAQUE RIVER ADJACENT TO THE PARANAQUE INTEGRATED TERMINAL EXCHANGE (PITX), DON GALO, PARANAQUE CITYBridges | On-Going | National Capital Region | ₱18.9M |
| 19O00033 | 7 yrs ago | PASIG RIVER ESPLANADE FROM AYALA BRIDGE TO JONES BRIDGE ALONG PASIG RIVER, MANILABridges | Completed | National Capital Region | ₱193.0M |
| 19O00026 | 7 yrs 2 mo ago | CONSTRUCTION OF BRIDGE ALONG PARANAQUE RIVER ADJACENT TO PARANAQUE INTEGRATED TERMINAL EXCHANGE (PARANAQUE ITX) DON GALO, PARANAQUE CITYBridges | Completed | National Capital Region | ₱143.0M |
| 19OB0074 | 7 yrs 4 mo ago | REPAIR/REHABILITATION OF MULTI-PURPOSE BUILDING (POLICE AND FIRE STATION), BRGY. PAG-ASA, MANDALUYONG CITYBuildings and Facilities | Completed | Metro Manila 1st DEO | ₱2.9M |
| 19O00002 | 7 yrs 4 mo ago | REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES MARCOS BRIDGE (B01752LZ) ALONG MARCOS HIGHWAY (PHASE II), MARIKINA CITYBridges | Completed | National Capital Region | ₱62.4M |
| 19OB0075 | 7 yrs 5 mo ago | REPAIR/REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. BAGONG SILANG, MANDALUYONG CITYBuildings and Facilities | Completed | Metro Manila 1st DEO | ₱2.9M |
| 18OB0492 | 7 yrs 7 mo ago | IMPROVEMENT OF SAN MIGUEL ST. AND VICINITY (DRAINAGE AND CONCRETING) BRGY. PLAINVIEW, MANDALUYONG CITYFlood Control and Drainage | Completed | Metro Manila 1st DEO | ₱9.3M |
| 18K00343 | 7 yrs 10 mo ago | CLUSTER '27' ROAD WIDENING IN MISAMIS ORIENTAL, 1) BCIR - K1477+397-K1478+068, K1478+094-K1479+691, K1479+722-K1480+582, K1480+602-K1483+640. 2) BCIR - K1484+286-K1487+299,K1487+351-K1491+000,K1491+000-K1491+248.GAA 2018 OO-1 | Completed | Region X | ₱306.4M |
| 18O00014 | 8 yrs 1 mo ago | NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, ALABANG-ZAPOTE DIVERSION ROAD (FROM ALABANG-ZAPOTE FLYOVER TO C5 BRIDGE), LAS PIÑAS CITYRoads | Completed | National Capital Region | ₱174.2M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.