JELM CONSTRUCTION CORP.
Contractor 0603b7eb7168bfe6e2dc
Overview
PhilGEPS awards
₱3.62B · 36 awards
DPWH contracts
₱3.49B · 72 contracts
Rank by recorded value
#491 of 23,487
More info
First record
Jun 5, 2016 (10 yrs 5 mo ago)
Latest record
Nov 8, 2025 (1 yr ago)
DPWH contractor code
33230
Where they work
Latest 25 from a total of 72 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 24IC0115 | 1 yr 7 mo ago | CONSTRUCTION OF MULTI-PURPOSE BUILDING (DANIEL Z. ROMUALDEZ MEMORIAL AUDITORIUM), TOLOSA, LEYTEGAA 2024 SSP | On-Going | Leyte 1st DEO | ₱99.0M |
| 25ID0048 | 1 yr 7 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEM ALONG HIBUGA RIVER BASIN(DOWNSTREAM),BARANGAY STA. ANA, LA PAZ,LEYTEGAA 2025 OO-2 | Completed | Leyte 2nd DEO | ₱96.4M |
| 25I00078 | 1 yr 8 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM), BARANGAY SANTOL, SAN MIGUEL, LEYTEGAA 2025 OO-2 | Completed | Region VIII | ₱120.4M |
| 25IC0068 | 1 yr 8 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAMBULAWAN RIVER, BARANGAY PAWING, PALO, LEYTEGAA 2025 OO-2 | Completed | Leyte 1st DEO | ₱49.0M |
| 25IC0079 | 1 yr 8 mo ago | REHABILITATION OF MULTI-PURPOSE BUILDING, BUILDING 1, TANAUAN, LEYTEGAA 2025 SSP | Completed | Leyte 1st DEO | ₱49.5M |
| 24IC0107 | 2 yrs 3 mo ago | CONSTRUCTION OF TANAUAN BY-PASS ROAD, LEYTE BRGY. CAMIRE, TANAUAN TO BRGY. CABARASAN GUTI, PALO, LEYTERoads | On-Going | Leyte 1st DEO | ₱144.6M |
| 24IC0081 | 2 yrs 3 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BRGY. LIBTONG, SAN MIGUEL, LEYTEFlood Control and Drainage | Completed | Leyte 1st DEO | ₱96.4M |
| 24IC0029 | 2 yrs 5 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAMBULAWAN RIVER (DOWNSTREAM), BRGY. PAWING, PALO, LEYTEFlood Control and Drainage | On-Going | Leyte 1st DEO | ₱97.0M |
| 24IM0003 | 2 yrs 8 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TIGBAO RIVER, TACLOBAN CITYFlood Control and Drainage | On-Going | Tacloban City DEO | ₱144.7M |
| 24IC0030 | 2 yrs 8 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAMBULAWAN RIVER (UPSTREAM), BRGY. PAWING, PALO, LEYTEGAA 2024 SSP | On-Going | Leyte 1st DEO | ₱99.0M |
| 23IM0102 | 3 yrs 1 mo ago | OPENING/CONCRETING OF BRGY. 103 PALANOG TO BRGY. 104 SALVACION FMR, BRGY. 103 PALANOG AND BRGY. 104 SALVACION, TACLOBAN CITY, LEYTEGAA 2023 DA FMR | On-Going | Tacloban City DEO | ₱99.4M |
| 23IM0104 | 3 yrs 1 mo ago | CONCRETING OF BRGY. 103-A PAGLAUM TO BRGY. 103 PALANOG FMR, BRGY. 103-A PAGLAUM AND BRGY. 103 PALANOG, TACLOBAN CITY, LEYTEGAA 2023 DA FMR | On-Going | Tacloban City DEO | ₱99.4M |
| 23IC0118 | 3 yrs 2 mo ago | CONSTRUCTION OF BYPASS AND DIVERSION ROADS - TOLOSA - SAN VICTOR - TABONTABON ROAD, BRGY. SAN VICTOR, BRGY. ADA, BRGY. CABONGA-AN AND BRGY. CANBALISARA, TANAUAN, LEYTERoads | On-Going | Leyte 1st DEO | ₱144.6M |
| 23IC0117 | 3 yrs 3 mo ago | CONSTRUCTION OF BYPASS AND DIVERSION ROADS - TANAUAN BYPASS ROAD, BRGY. MARIBI, BRGY. CABALAGNAN, BRGY. BARAS, AND BRGY. CAMIRE, TANAUAN, LEYTERoads | On-Going | Leyte 1st DEO | ₱144.6M |
| 23IM0068 | 3 yrs 5 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PHASE 3, CAMANSIHAY, TACLOBAN CITY, LEYTEFlood Control and Drainage | Completed | Tacloban City DEO | ₱96.1M |
| 23IC0040 | 3 yrs 7 mo ago | CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST. OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, BRGY. BARAS, TANAUAN, LEYTEFlood Control and Drainage | Completed | Leyte 1st DEO | ₱48.5M |
| 23I00006 | 3 yrs 8 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, BRGY. CAHUMAYHUMAYAN, TANAUAN, LEYTEFlood Control and Drainage | Completed | Region VIII | ₱106.1M |
| 22I00092 | 4 yrs 3 mo ago | CONSTRUCTION (COMPLETION) OF STORM SURGE PROTECTION: TIDE EMBANKMENT, SUBSECTION 4.6, BRGY. BARAS, PALO, LEYTEFlood Control and Drainage | Completed | Region VIII | ₱37.2M |
| 21ID0068 | 4 yrs 4 mo ago | CONSTRUCTION OF SLOPE PROTECTION ALONG BURAUEN-MAHAGNAO ROAD K0991+763-K0993+425,BURAUEN,LEYTERoads | Completed | Leyte 2nd DEO | ₱49.3M |
| 22IM0054 | 4 yrs 8 mo ago | REHABILITATION OF TACLOBAN CONVENTION CENTER (PHASE 2), TACLOBAN CITYBuildings and Facilities | Completed | Tacloban City DEO | ₱39.2M |
| 21IC0046 | 5 yrs 2 mo ago | CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONST. OF FLOOD CONTROL ALONG LIMBUHAN RIVER, BRGY. CANTARIWIS SECTION, TOLOSA, LEYTEFlood Control and Drainage | Completed | Leyte 1st DEO | ₱46.6M |
| 21IA0121 | 5 yrs 5 mo ago | REHABILITATION OF SHORELINE PROTECTION AT BRGY. LANGGAO AND BRGY. TALIBONG (11.514568, 124.615821 TO 11.507178, 124.613369)Flood Control and Drainage | Completed | Biliran DEO | ₱47.3M |
| 21IC0042 | 5 yrs 7 mo ago | CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONST. OF FLOOD CONTROL STRUCTURE AND DRAINAGE, BRGY. CAMPETIC AND PAWING, PALO, LEYTEFlood Control and Drainage | Completed | Leyte 1st DEO | ₱88.4M |
| 21IM0021 | 5 yrs 7 mo ago | CONSTRUCTION OF MULTI-PURPOSE BUILDING (TACLOBAN CITY CONVENTION CENTER), TACLOBAN CITYBuildings and Facilities | Completed | Tacloban City DEO | ₱38.8M |
| 21IM0031 | 5 yrs 7 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BRGY. 62-B KALIPAYAN, TACLOBAN CITYFlood Control and Drainage | Completed | Tacloban City DEO | ₱1.9M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.