MRRM TRADING & CONSTRUCTION
Contractor 28e87710a0e120e68bf7
Overview
PhilGEPS awards
₱6.16B · 240 awards
DPWH contracts
₱3.41B · 90 contracts
Rank by recorded value
#357 of 23,487
More info
First record
Aug 9, 2007 (19 yrs 3 mo ago)
Latest record
Aug 3, 2026 (3 mos ago)
DPWH contractor code
19657
Where they work
Latest 25 from a total of 90 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 26GI0049 | 3 mos ago | INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG ILOILO- CAPIZ RD (NEW ROUTE) - K0015 + 900 - K0018 + 636GAA 2026 SSP | On-Going | Iloilo 4th DEO | ₱32.3M |
| 26HO0056 | 3 mos ago | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF MISSING LINKS/ NEW ROADS ALEGRIA-ALCOY ROAD, BARANGAY GUADALUPE, ALEGRIA, CEBUGAA 2026 OO-1 | On-Going | Cebu 7th DEO | ₱23.8M |
| 26RG0046 | 3 mos ago | ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - DUMAGUETE NORTH RD (JCT BAIS-KABANKALAN-NEGROS OCC BDRY) - K0132 + 850 - K0132 + 935, K0132 + 982 - K0133 + 863, GUIHUGAA 2026 OO-1 | On-Going | Negros Oriental 1st DEO | ₱54.3M |
| 26RA0079 | 4 mos ago | INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG BACOLOD NORTH RD - K0023 + 000 - K0028 + 000GAA 2026 SSP | On-Going | Negros Occidental 1st DEO | ₱66.7M |
| 26G00019 | 5 mos ago | PRESIDENT CORAZON C. AQUINO AVE. (S00097PN) K0018+971- K0019+388GAA 2026 OO-1 | On-Going | Region VI | ₱47.2M |
| 25EA0040 | 1 yr 7 mo ago | SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF BOAC ACCESS ROAD, BOAC, MARINDUQUEGAA 2025 SSP | Completed | Marinduque DEO | ₱37.9M |
| 24C00083 | 2 yrs 5 mo ago | SUSTAINABLE INFRASTRURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER (UPSTREAM), BARANGAY MALIGAYA, SAN MIGUEL, BULACANFlood Control and Drainage | Completed | Region III | ₱96.5M |
| 24CC0461 | 2 yrs 5 mo ago | CONSTRUCTION OF MULTI-PURPOSE BUILDING (BIÑANG ELEMENTARY SCHOOL), BIÑANG 1ST, BOCAUE, BULACANBuildings and Facilities | On-Going | Bulacan 1st DEO | ₱45.6M |
| 24EA0075 | 2 yrs 8 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BALIMBING FLOOD CONTROL, BOAC, MARINDUQUEGAA 2024 OO-2 | Completed | Marinduque DEO | ₱87.8M |
| 24EA0011 | 2 yrs 9 mo ago | ASSET PRESERVATION PROGRAM- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, MARINDUQUE CIRCUMFERENTIAL RD - K0054+890 - K0056+640GAA 2024 OO-1 | Completed | Marinduque DEO | ₱35.6M |
| 23C00227 | 3 yrs 4 mo ago | FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG SAN MIGUEL RIVER, SAN MIGUEL, BULACANFlood Control and Drainage | Completed | Region III | ₱96.5M |
| 23CC0352 | 3 yrs 7 mo ago | CONSTRUCTION OF MULTI-PURPOSE BUILDING AT TAMBUBONG ELEMENTARY SCHOOL, TAMBUBONG, BOCAUE, BULACANBuildings and Facilities | Completed | Bulacan 1st DEO | ₱39.6M |
| 23EB0064 | 3 yrs 9 mo ago | CONSTRUCTION OF DPWH MINDORO OCCIDENTAL DISTRICT ENGINEERING SUB-OFFICE, BRGY. ARAW AT BITUIN AND BRGY. MALIIG, LUBANG, OCCIDENTAL MINDOROGAA 2023 LP | Completed | Mindoro Occidental DEO | ₱9.0M |
| 22EH0110 | 4 yrs 3 mo ago | REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE ALONG ODIONGAN-EAST-WEST RD, K0008+940 - K0008+986, TABLAS ISLAND, ROMBLONGAA 2022 OO-1 | Completed | Romblon DEO | ₱86.8M |
| 22EH0111 | 4 yrs 3 mo ago | REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE ALONG ODIONGAN-EAST-WEST RD, K0008+546 - K0008+601, TABLAS ISLAND, ROMBLONGAA 2022 OO-1 | Completed | Romblon DEO | ₱77.2M |
| 22EH0112 | 4 yrs 3 mo ago | REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE ALONG ODIONGAN-EAST-WEST RD, K0009+128 - K0009+157.70, TABLAS ISLAND, ROMBLONGAA 2022 OO-1 | Completed | Romblon DEO | ₱39.2M |
| 22EH0117 | 4 yrs 3 mo ago | REHABILITATION OF ROAD WITH SLIP, SLOPE COLLAPSE AND LANDSLIDE ALONG ACCESS ROAD MALBOG JCT. - STA. FE GUINBIRAYAN PROVINCIAL ROAD LEADING TO SAN JOSE BEACHES, STA. 07+486.20 - STA. 07+634.80, STA. FE, ROMBLONGAA 2022 CSSP | Completed | Romblon DEO | ₱86.8M |
| 22EH0118 | 4 yrs 3 mo ago | REHABILITATION OF ROAD WITH SLIP, SLOPE COLLAPSE AND LANDSLIDE ALONG ACCESS ROAD MALBOG JCT. - STA. FE GUINBIRAYAN PROVINCIAL ROAD LEADING TO SAN JOSE BEACHES, STA. 07+334.80 - STA. 07+486.20, STA. FE, ROMBLONGAA 2022 CSSP | Completed | Romblon DEO | ₱57.9M |
| 22EH0128 | 4 yrs 3 mo ago | CONSTRUCTION OF SUGOD-CAWAYAN ROAD LEADING TO BLUE HOLES, STA. 10+920.00 - STA. 11+031.60, SAN AGUSTIN, ROMBLONGAA 2022 CSSP | Completed | Romblon DEO | ₱49.0M |
| 22EH0129 | 4 yrs 3 mo ago | CONSTRUCTION OF SUGOD-CAWAYAN ROAD LEADING TO BLUE HOLES, STA. 10+500.00 - STA. 10+620.00, SAN AGUSTIN, ROMBLONGAA 2022 CSSP | Completed | Romblon DEO | ₱57.9M |
| 22EH0130 | 4 yrs 3 mo ago | CONSTRUCTION OF SUGOD-CAWAYAN ROAD LEADING TO BLUE HOLES, STA. 11+100.00 - STA. 11+200.00, STA. 11+510.00 - STA. 11+548.30, SAN AGUSTIN, ROMBLONGAA 2022 CSSP | Completed | Romblon DEO | ₱77.2M |
| 22EH0131 | 4 yrs 3 mo ago | CONSTRUCTION OF SUGOD-CAWAYAN ROAD LEADING TO BLUE HOLES, STA. 11+466.00 - STA.11+510.00, SAN AGUSTIN, ROMBLONGAA 2022 CSSP | Completed | Romblon DEO | ₱35.3M |
| 22DM0024 | 4 yrs 7 mo ago | NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS -CATANAUAN - BUENAVISTA RD - K0261+893 - K0265+893CATANAUAN, QUEZONRoads | Completed | Quezon 3rd DEO | ₱61.1M |
| 22DM0083 | 4 yrs 7 mo ago | NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CATANAUAN DIVERSION ROAD, (PACKAGE 2), QUEZON, CATANAUAN, QUEZONRoads | Completed | Quezon 3rd DEO | ₱62.7M |
| 22DM0086 | 4 yrs 7 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PIRIS RIVER, BUENAVISTA, QUEZON, BUENAVISTA, QUEZONFlood Control and Drainage | Completed | Quezon 3rd DEO | ₱29.4M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.