JMLD CONSTRUCTION
Contractor 39c72e5b92cf92d6859a
Overview
PhilGEPS awards
₱3.27B · 182 awards
DPWH contracts
₱2.08B · 116 contracts
Rank by recorded value
#632 of 23,487
More info
First record
Jul 13, 2011 (15 yrs 4 mo ago)
Latest record
Nov 3, 2025 (1 yr ago)
DPWH contractor code
22679
Where they work
Camarines Sur₱1.69B
Bulacan₱1.26B
Latest 25 from a total of 116 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 25FF0053 | 1 yr 2 mo ago | CONCRETING OF BRGY, SAN FRANCISCO TO BRGY. IQUIN FMR, BRGY, SAN FRANCISCO CANAMAN CAMARINES SURGAA 2025 DA FMR | Completed | Camarines Sur 3rd DEO | ₱14.7M |
| 25FN0038 | 1 yr 3 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE RAIN WATER COLLECTOR SYSTEM (RWCS)GAA 2025 LS Itemization | Completed | Camarines Sur 5th DEO | ₱2.5M |
| 25FE0032 | 1 yr 4 mo ago | CONSTRUCTION/REHABILITATION OF RAINWATER COLLECTORS SYSTEM (RWCS) IN PUBLIC FACILITIES 1) MALBONG ELEMENTARY SCHOOL, BRGY. MALBONG, GAINZA, CAMARINES SUR 2) CAGBUNGA ELEMENTARY SCHOOL, BRGY. CAGBUNGA, GAINZA, CAMARINES SUR 3) DAHILIG ELEMENTARY SCHOOL, BRGAA 2025 LS Itemization | Completed | Camarines Sur 2nd DEO | ₱2.6M |
| 25CP0146 | 1 yr 7 mo ago | CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRA. PROG. (BIP) - BIP - FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES - CONST. OF MADLUM RIVER RIVERBANK SLOPE PROTECTION STRUCT.GAA 2025 SSP | On-Going | Bulacan 3rd DEO | ₱49.5M |
| 25CP0147 | 1 yr 7 mo ago | CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRA. PROG. (BIP) - BIP- FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/ STRAT. PUBLIC BLDGS/FACILITIES - CONST. OF MADLUM RIVER RIVERBANK SLOPE PROTECTION STRUCT, PUROK 2, BARANGAY SIBUL, SAN MIGUEL, BULACAN (UPSTGAA 2025 SSP | On-Going | Bulacan 3rd DEO | ₱49.5M |
| 25CP0093 | 1 yr 7 mo ago | CONVERG. AND SPL. SUPPORT PROG.-SUST. INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-FLOOD MITIGATION STRUCT. PROTECTING MAJ./STRAT. PUBLIC BLDGS./FACS.-CONST. OF RIVERBANK PROTECTION STRUCT. ALONG MALANGAAN RIVER(DOWNSTREAM), BRGY. CAMACHILE, DONA REMEDIOGAA 2025 SSP | On-Going | Bulacan 3rd DEO | ₱96.5M |
| 25CP0098 | 1 yr 7 mo ago | CONVERGE. AND SPECIAL SUPPORT PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTS .PROTECTING MAJOR/STRATEGIC PUBLIC BLDGS./ FACILITIES-CONST. OF FLOOD MITIGATION STRUCT. ALONG SAN MIGUEL RIVER, SEG. A (SIOJO ST. SEC.),GAA 2025 SSP | Completed | Bulacan 3rd DEO | ₱96.5M |
| 25CP0099 | 1 yr 7 mo ago | CONVERGE. AND SPECIAL SUPPORT PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG- FLOOD MITIGATION STRUCTS. PRTOTECTING MAJOR/STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF FLOOD MITIGATION STRUCT. ALONG SAN MIGUEL RIVER, SEGMENT B (SIOJO ST. SEC.)GAA 2025 SSP | Completed | Bulacan 3rd DEO | ₱96.5M |
| 25C00362 | 1 yr 8 mo ago | FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY CALASAG (UPSTREAM), SAN ILDEFONSO, BULACANGAA 2025 OO-2 | On-Going | Bulacan 3rd DEO | ₱96.5M |
| 25C00372 | 1 yr 8 mo ago | FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY CALASAG (DOWNSTREAM), SAN ILDEFONSO, BULACANGAA 2025 OO-2 | Completed | Bulacan 3rd DEO | ₱96.5M |
| 25CP0030 | 1 yr 8 mo ago | FLOOD MANAGEMENT PROGRAM- CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BULO RIVER, BRGY. KING KABAYO, MIGUEL, BULACAN, PHASE IGAA 2025 OO-2 | Completed | Bulacan 3rd DEO | ₱48.2M |
| 25CP0092 | 1 yr 8 mo ago | CONVERG. AND SPL. SUPPORT PROG.-SUST. INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-FLOOD MITIGATION STRUCT. PROTECTING MAJ./STRAT. PUBLIC BLDGS./FACS.-CONST. OF RIVERBANK PROTECTION STRUCT. ALONG MALANGAAN RIVER(UPSTREAM), BRGY. CAMACHILE, DONA REMEDIOSGAA 2025 SSP | Completed | Bulacan 3rd DEO | ₱96.5M |
| 25CP0096 | 1 yr 8 mo ago | CONVERG. AND SPECIAL SUPPORT PROG. - SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/ STRATEGIC PUBLIC BLDGS./ FACILITIES - CONST. OF FLOOD CTRL. STRUCT. ALONG MALANGAAN RIVER, SAN RAFAEL, BULACANGAA 2025 SSP | On-Going | Bulacan 3rd DEO | ₱48.2M |
| 25CP0097 | 1 yr 8 mo ago | CONVERG. AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/STRAT. PUBLIC BLDGS./FACILITIES-CONS. OF FLOOD CTRL. STRUCT. ALONG MALANGAAN RIVER (DOWNSTREAM), SAN RAFAEL, BULACANGAA 2025 SSP | On-Going | Bulacan 3rd DEO | ₱48.2M |
| 24C00509 | 1 yr 11 mo ago | BASIC INFRASTRUCTURE PROGRAM-BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF MARONQUILLO-PASONG BANGKAL ROAD, SAN RAFAEL, BULACANGAA 2024 SSP | On-Going | Region III | ₱49.5M |
| 24FF0093 | 2 yrs 3 mo ago | CONCRETING OF BRGY BALONGAY FMR, CALABANGA CAMARINES SURGAA 2024 DA FMR | On-Going | Camarines Sur 3rd DEO | ₱14.4M |
| 24FN0067 | 2 yrs 3 mo ago | CSSP - CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTOR SYSTEMSWater Provision and Storage | Completed | Camarines Sur 5th DEO | ₱2.8M |
| 24FE0041 | 2 yrs 6 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM - RAINWATER COLLECTOR SYSTEM - RAINWATER COLLECTORS IN PUBLIC FACILITIES1) PAMPLONA CENTRAL SCHOOL, PAMPLONA, CAMARINES SUR2) SALVACION ELEMENTARY SCHOOL, PAMPLONA, CAMARINES SUR3) LOOB ELEMENTARY SCHOOL, GAINWater Provision and Storage | Completed | Camarines Sur 2nd DEO | ₱2.9M |
| 23FF0070 | 3 yrs 4 mo ago | CONCRETING OF BIARC,BRGY SAN AGUSTIN FMR BRGY SAN AGUSTIN PILI CAMARINES SURRoads | Completed | Camarines Sur 3rd DEO | ₱11.5M |
| 23FE0103 | 3 yrs 4 mo ago | CSSP: CONSTRUCTION/ REHABILITATION OFWATER SUPPLY/ SEPTAGE AND SEWERAGE/RAINWATER COLLECTOR SYSTEM/RAINWATERCOLLECTOR IN PUBLIC FACILITIESWater Provision and Storage | Completed | Camarines Sur 2nd DEO | ₱2.3M |
| 23FE0097 | 3 yrs 4 mo ago | CONCRETING OF TARUM-PATAG CIRCUMFERENTIAL FMR, BRGY PATAG, LIBMANAN, CAMARINES SURRoads | Completed | Camarines Sur 2nd DEO | ₱11.9M |
| 23FD0002 | 3 yrs 6 mo ago | REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS, ROLANDO A. ANDAYA HIGHWAY - K0 339+145 - K0339 + 262Roads | Completed | Camarines Sur 1st DEO | ₱12.6M |
| 23FD0033 | 3 yrs 7 mo ago | CONSTRUCTION OF MULTI-PURPOSE BUILDING, CABUSAO, CAMARINES SURBuildings and Facilities | Completed | Camarines Sur 1st DEO | ₱7.4M |
| 23FE0039 | 3 yrs 7 mo ago | CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BRGY. PATONG, PAMPLONA, CAMARINES SURRoads | Completed | Camarines Sur 2nd DEO | ₱24.3M |
| 23FE0006 | 3 yrs 8 mo ago | (CLUSTERED PROJECTS) CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - A. CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY TINALMUD NUEVO, LIBMANAN, CAMARINES SUR; B. CONSTRUCTION (COMBuildings and Facilities | Completed | Camarines Sur 2nd DEO | ₱9.8M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.