J. SIMEON CONSTRUCTION
Contractor 63b5a4146c0f13004e6e
Overview
PhilGEPS awards
₱9.34B · 272 awards
DPWH contracts
₱7.17B · 156 contracts
Rank by recorded value
#189 of 23,487
More info
First record
Mar 26, 2007 (19 yrs 7 mo ago)
Latest record
Jun 23, 2025 (1 yr 4 mo ago)
DPWH contractor code
31867
Where they work
Latest 25 from a total of 156 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 25OD0358 | 1 yr 4 mo ago | CONSTRUCTION OF LEGISLATIVE BUILDING, BRGY. KARUHATAN, VALENZUELA CITY (PHASE II)Buildings and Facilities | On-Going | Metro Manila 3rd DEO | ₱114.6M |
| 25DI0101 | 1 yr 5 mo ago | CONSTRUCTION OF RIVER PROTECTION STRUCTURE ALONG STA. ROSA RIVER, (NEAR STA. ROSA-BINAN BOUNDARY BRIDGE), STA. ROSA SIDE, STA. ROSA CITY LAGUNA (PHASE 2)Flood Control and Drainage | On-Going | Laguna 2nd DEO | ₱63.1M |
| 25DI0102 | 1 yr 5 mo ago | CONSTRUCTION OF RIVER PROTECTION STRUCTURE ALONG STA. ROSA RIVER, (NEAR STA. ROSA-BINAN BOUNDARY BRIDGE), STA. ROSA SIDE, STA. ROSA CITY LAGUNA (PHASE 1)Flood Control and Drainage | On-Going | Laguna 2nd DEO | ₱97.1M |
| 25DI0103 | 1 yr 5 mo ago | REHABILITATION OF FLOOD CONTROL PHASE 1 ALONG BRGY. SANTO DOMINGO, STA. ROSA, LAGUNAFlood Control and Drainage | On-Going | Laguna 2nd DEO | ₱97.1M |
| 25OD0177 | 1 yr 7 mo ago | CONSTRUCTION (COMPLETION) OF OUT PATIENT DEPARTMENT (OPD) WITH SEWERAGE TREATMENT PLANT (STP), BRGY. DALANDANAN, VALENZUELA CITYBuildings and Facilities | On-Going | Metro Manila 3rd DEO | ₱82.8M |
| 25OB0127 | 1 yr 8 mo ago | CONSTRUCTION OF SLOPE PROTECTION ALONG C-6 OPEN CHANNEL (PHASE 17), TAGUIG CITYGAA 2025 OO-2 | Completed | Metro Manila 1st DEO | ₱94.6M |
| 24OG0131 | 2 yrs 1 mo ago | REHABILITATION OF NATIONAL COLLEGE OF PUBLIC ADMINISTRATION AND GOVERNANCE LIBRARY (PHASE 1), UNIVERSITY OF THE PHILIPPINES, DILIMAN, QUEZON CITYBuildings and Facilities | On-Going | Quezon City 2nd DEO | ₱48.0M |
| 24OG0125 | 2 yrs 4 mo ago | REHABILITATION OF MULTI-PURPOSE BUILDING, UN NCPAG, UNIVERSITY OF THE PHILIPPINES, DILIMAN, QUEZON CITYBuildings and Facilities | On-Going | Quezon City 2nd DEO | ₱67.2M |
| 24OB0188 | 2 yrs 5 mo ago | CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG C-6 OPEN CHANNEL, (PHASE 2), TAGUIG CITYFlood Control and Drainage | Completed | Metro Manila 1st DEO | ₱141.8M |
| 24HK0108 | 2 yrs 5 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF SHORE PROTECTION, BARANGAY LOOC, DUMAGUETE CITY,GAA 2024 SSP | Completed | Negros Oriental 2nd DEO | ₱96.5M |
| 24OB0187 | 2 yrs 5 mo ago | CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG C-6 OPEN CHANNEL, (PHASE 1), TAGUIG CITYFlood Control and Drainage | Completed | Metro Manila 1st DEO | ₱141.8M |
| 24OB0189 | 2 yrs 5 mo ago | CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG C-6 OPEN CHANNEL, (PHASE 3), TAGUIG CITYFlood Control and Drainage | Completed | Metro Manila 1st DEO | ₱141.9M |
| 24OB0215 | 2 yrs 5 mo ago | CONSTRUCTION OF SLOPE PROTECTION ALONG PINAGSAMA RIVER, TAGUIG CITY (PHASE 3)Flood Control and Drainage | Completed | Metro Manila 1st DEO | ₱90.7M |
| 24OB0216 | 2 yrs 6 mo ago | CONSTRUCTION OF SLOPE PROTECTION ALONG PINAGSAMA RIVER, TAGUIG CITY (PHASE 4)Flood Control and Drainage | Completed | Metro Manila 1st DEO | ₱90.7M |
| 24OA0084 | 2 yrs 6 mo ago | CONSTRUCTION OF PANGHULO BARANGAY HALL, PANGHULO, MALABON CITYBuildings and Facilities | Completed | Malabon-Navotas DEO | ₱9.9M |
| 24OD0029 | 2 yrs 8 mo ago | CONSTRUCTION OF REINFORCED CONCRETE BOX CULVERT ALONG 8TH STREET, CALOOCAN CITYFlood Control and Drainage | Completed | Metro Manila 3rd DEO | ₱94.2M |
| 24OB0171 | 2 yrs 9 mo ago | CONSTRUCTION OF SLOPE PROTECTION ALONG C-6 OPEN CHANNEL (PHASE 11), TAGUIG CITYFlood Control and Drainage | Completed | Metro Manila 1st DEO | ₱94.6M |
| 24CC0078 | 2 yrs 9 mo ago | CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG ANGAT RIVER, BARANGAY CAMBAOG, BUSTOS, BULACANFlood Control and Drainage | Completed | Bulacan 1st DEO | ₱96.5M |
| 23CC0546 | 2 yrs 10 mo ago | CONSTRUCTION OF RIVER CONTROL SYSTEM AND REHABILITATION OF WATERWAYS ALONG BALAGTAS RIVER BRGY. PANGINAY BALAGTAS, BULACAN (STA. 15+538 TO STA. 15+742)Flood Control and Drainage | Completed | Bulacan 1st DEO | ₱96.5M |
| 23OD0229 | 3 yrs 4 mo ago | CONSTRUCTION OF LEGISLATIVE BUILDING & PEOPLES BUILDING (PHASE II) VALENZUELA CITY HALL, BRGY. KARUHATAN, VALENZUELA CITYGAA 2023 CSSP | On-Going | Metro Manila 3rd DEO | ₱157.8M |
| 23HK0094 | 3 yrs 6 mo ago | BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES: CONSTRUCTION OF BANICA RIVER CONTROL, BRGY. BATINGUEL, DUMAGUETE CITY, NEGROS ORIENTALFlood Control and Drainage | Completed | Negros Oriental 2nd DEO | ₱99.0M |
| 23HK0095 | 3 yrs 6 mo ago | BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATING STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES: CONSTRUCTION OF BANICA RIVER CONTROL, BRGY. NORTHERN JUNOB, DUMAGUETE CITYFlood Control and Drainage | Completed | Negros Oriental 2nd DEO | ₱99.0M |
| 23HK0097 | 3 yrs 6 mo ago | BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE /FACILITIES: CONSTRUCTION OF BANILAD TO CANTIL-E RIVER CONTROL, DUMAGUETE CITY, NEGROS ORIENTALGAA 2023 CSSP | Completed | Negros Oriental 2nd DEO | ₱99.0M |
| 23HK0081 | 3 yrs 7 mo ago | SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF RIVER CONTROL, MAGATAS, SIBULAN, NEGROS ORIENTALFlood Control and Drainage | Completed | Negros Oriental 2nd DEO | ₱96.5M |
| 23HK0083 | 3 yrs 7 mo ago | SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF RIVER CONTROL, BRGY. SAN JOSE, TANJAY CITY, NEGROS ORIENTALFlood Control and Drainage | Completed | Negros Oriental 2nd DEO | ₱96.5M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.