Skip to content
FY2026 GAA: ₱6.79T
PisoScan

MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY

Contractor 6b673fde4dc23ed81ece

Overview

PhilGEPS awards
₱0 · 0 awards
DPWH contracts
₱5.48B · 267 contracts
Rank by recorded value
#624 of 23,487

More info

First record
Feb 9, 2016 (10 yrs 9 mo ago)
Latest record
Aug 24, 2026 (2 mos ago)
DPWH contractor code
9354

Where they work

Bohol₱3.64B
Siquijor₱1.04B
Cebu₱438.4M
Leyte₱22.2M
Latest 25 from a total of 267 DPWH contracts
Contract IDStartDescriptionStatusOfficeAmount
17HB01318 yrs 10 mo agoCONSTRUCTION OF PILAR TECHNICAL-VOCATIONAL HIGH SCHOOL (1-STOREY/ 2 CLASSROOMS 7M X 9M) UNDER K-10 SCHOOL BUILDING PROGRAM, PILAR, BOHOLBuildings and FacilitiesCompletedBohol 3rd DEO₱2.5M
17HB01358 yrs 10 mo agoCONSTRUCTION OF BATUAN NATIONAL HIGH SCHOOL (1-STOREY/2 CLASSROOMS 7M X 9M) UNDER THE SENIOR HIGH SCHOOL (SHS) BUILDING PROGRAM, BATUAN, BOHOLBuildings and FacilitiesCompletedBohol 3rd DEO₱2.5M
17HB01408 yrs 10 mo agoCONSTRUCTION OF PILAR TECHNICAL-VOCATIONAL NATIONAL HIGH SCHOOL (1-STOREY/2 CLASSROOMS 7M X 9M) UNDER THE SENIOR HIGH SCHOOL (SHS) BUILDING PROGRAM, PILAR, BOHOLBuildings and FacilitiesCompletedBohol 3rd DEO₱2.5M
17HB01428 yrs 10 mo agoCONSTRUCTION OF SIERRA BULLONES TECHNICAL-VOCATIONAL HIGH SCHOOL (1-STOREY/2 CLASSROOMS 7M X 9M) UNDER THE SENIOR HIGH SCHOOL (SHS) BUILDING PROGRAM, SIERRA BULLONES, BOHOLBuildings and FacilitiesCompletedBohol 3rd DEO₱2.6M
17HB00448 yrs 11 mo agoCONSTRUCTION OF CONCRETE ROAD - CANDIJAY - COGTONG ROAD LEADING TO BEACHES AND RESORTS, CANDIJAY, BOHOLRoads: Construction - PCCP, Roads: Construction - Slope Protection using Structural Measures (e.g. Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)CompletedBohol 3rd DEO₱14.7M
17HB00849 yrs ago(P00143735VS-CW1) CONCRETING OF TOURISM ROAD FROM ILAYA-ANGILAN-BANGWALOG-TAYTAY, DUERO, BOHOLRoads: Construction - PCCP, Roads: Construction - Slope Protection using non - structural measures (e.g. vetiver, coconet, other vegetation)CompletedBohol 3rd DEO₱9.4M
17HB01209 yrs 2 mo ago(P00145858VS-CW1) COMPLETION OF MUNICIPAL EVACUATION CENTER, POBLACION, CANDIJAY, BOHOLBuildings and FacilitiesCompletedBohol 3rd DEO₱23.9M
17HB00739 yrs 4 mo ago(P00145856VS-CW1) - COMPLETION OF MULTI-PURPOSE BUILDING (GINGER PROCESSING CENTER/EVACUATION CENTER), CANDABONG, LOBOC, BOHOLBuildings and FacilitiesCompletedBohol 3rd DEO₱960.3K
17HB00789 yrs 4 mo ago(P00142461VS-CW1) - CONSTRUCTION OF CANAYAON SEAWALL ROAD PROTECTION, WEST CANAYAON, GARCIA, HERNANDEZ, BOHOLFlood Control and DrainageCompletedBohol 3rd DEO₱9.3M
17HB00799 yrs 4 mo ago(P00142462VS-CW1) - CONSTRUCTION OF SAN ANTONIO RIVER CONTROL, DUERO, BOHOLFlood Control and DrainageCompletedBohol 3rd DEO₱9.3M
17HB00869 yrs 4 mo ago(P00143734VS-CW1) - CONCRETING OF BRGY. ROADS, COGTONG, CANDIJAY, BOHOLFlood Control: Construction - Slope Protection using non - structural measures (e.g. vetiver, coconet, other vegetation), Roads: Construction - PCCPCompletedBohol 3rd DEO₱18.8M
17HB00299 yrs 4 mo agoCONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTIURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CANAYAON SEAWALL ROAD PROTECTION, EAST/WEST CANAYAON, GARCIA-HERNANDEZ, BOHOL, STA. 205+250.00 - STA.205+443.00 - EAST CANAYAON SECTION; STA. 205+610.00 - STA.Flood Control and DrainageCompletedBohol 3rd DEO₱9.3M
17HB00259 yrs 5 mo agoNETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE - TERTIARY ROADS - JCT. DAT-AN CARMEN-SIERRA BULLONES-PILAR- ALICIA ROAD, SECTION 1: K0072+-498 - K0072+046 (K0071+600 - K0072+000); SECTION 2: K0091+262 - K0091+412 (K0091+262 - K0091+7Flood Control/Hydraulics/Drainage, Roads: Rehabilitation - PCCPCompletedBohol 3rd DEO₱14.3M
17HB00529 yrs 6 mo agoASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, JCT. (TER) JAGNA-SIERRA BULLONES ROAD, SEC. 1 - K0082+349.00 - K0082+436; SEC. 2 - K0082+450.00-K0082+600.00;RoadsCompletedBohol 3rd DEO₱44.7M
17HB00489 yrs 7 mo ago(P00142548VS-CW1) LOCALLY FUNDED PROJECTS - LOCAL INFRASTRUCTURE PROGRAM - FLOOD CONTROL AND DRAINAGE - DRAINAGE/PROTECTION WORKS - CANHAWAY-ANONANG, VALENCIA SLOPE PROTECTION (CANLUSONG PORTION), VALENCIA, BOHOLRoadsCompletedBohol 3rd DEO₱9.4M
17HB00479 yrs 7 mo ago(P00142877VS-CW1) CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONCRETING OF CANAWA ROADS LEADING TO CANAWA SPRING AND COCONUT PLANTATION, CANDIJAY, BOHOLFlood Control/Hydraulics/Drainage, Roads: Rehabilitation - PCCPCompletedBohol 3rd DEO₱9.4M
17HB00509 yrs 7 mo ago(P00142876VS-CW1) CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONCRETING OF BRGY. ABIHILAN, BRGY. TAMBONGAN, BRGY. CADAPDAPAN, CANDIJAY, BOHOLFlood Control/Hydraulics/Drainage, Roads: Rehabilitation - PCCPCompletedBohol 3rd DEO₱19.8M
17HB00309 yrs 7 mo agoCONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CANSIBAO RIVER CONTROL, VALENCIA, BOHOLFlood Control and DrainageCompletedBohol 3rd DEO₱9.3M
17HB00319 yrs 7 mo agoCONSTRUCTION/IMPOVEMENT OF ACCESS ROADS LEADING TO SEAPORTS - ACCESS ROAD LEADING TO JAGNA PORT, JAGNA, BOHOLRoadsCompletedBohol 3rd DEO₱9.2M
17HB00329 yrs 7 mo agoCONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS - ACCESS ROAD LEADING TO LOAY PORTRoadsCompletedBohol 3rd DEO₱4.6M
17HB00339 yrs 7 mo agoCONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF PONOD RIVER CONTROL, SAWANG, GUINDULMAN, BOHOLFlood Control and DrainageCompletedBohol 3rd DEO₱9.3M
17HB00349 yrs 7 mo agoCONSTRUCTION.MAINTENACE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF LOBOC RIVER CONTROL, LOBOC, BOHOLFlood Control and DrainageCompletedBohol 3rd DEO₱9.3M
17HB00369 yrs 7 mo agoCONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MANABA RIVER CONTROL, STA. 0+000 - STA. 0+274.20 (LEFT SIDE), STA. 0+069.00 - STA. 0+274.20 (RIGHT SIDE), GARCIA HERNANDEZ, BOHOLFlood Control and DrainageCompletedBohol 3rd DEO₱11.6M
17HB00379 yrs 7 mo agoCONSTRUCTION/MAINTENACE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF TABAJAN RIVER CONTROL, STA. 174+590.70 - STA. 174+678.00 (DOWMSTREAM), STA. 174+500.00 - STA. 174+739.00 (UPSTREAM), GUINDULMAN, BOHOLFlood Control and DrainageCompletedBohol 3rd DEO₱9.3M
17HB00389 yrs 7 mo agoCONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF GUINSULARAN RIVER CONTROL, STA. 0+000 - STA. 0+299.50, DUERO, BOHOLFlood Control and DrainageCompletedBohol 3rd DEO₱9.3M

Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.