MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY
Contractor 6b673fde4dc23ed81ece
Overview
PhilGEPS awards
₱0 · 0 awards
DPWH contracts
₱5.48B · 267 contracts
Rank by recorded value
#624 of 23,487
More info
First record
Feb 9, 2016 (10 yrs 9 mo ago)
Latest record
Aug 24, 2026 (2 mos ago)
DPWH contractor code
9354
Where they work
Latest 25 from a total of 267 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 17HB0131 | 8 yrs 10 mo ago | CONSTRUCTION OF PILAR TECHNICAL-VOCATIONAL HIGH SCHOOL (1-STOREY/ 2 CLASSROOMS 7M X 9M) UNDER K-10 SCHOOL BUILDING PROGRAM, PILAR, BOHOLBuildings and Facilities | Completed | Bohol 3rd DEO | ₱2.5M |
| 17HB0135 | 8 yrs 10 mo ago | CONSTRUCTION OF BATUAN NATIONAL HIGH SCHOOL (1-STOREY/2 CLASSROOMS 7M X 9M) UNDER THE SENIOR HIGH SCHOOL (SHS) BUILDING PROGRAM, BATUAN, BOHOLBuildings and Facilities | Completed | Bohol 3rd DEO | ₱2.5M |
| 17HB0140 | 8 yrs 10 mo ago | CONSTRUCTION OF PILAR TECHNICAL-VOCATIONAL NATIONAL HIGH SCHOOL (1-STOREY/2 CLASSROOMS 7M X 9M) UNDER THE SENIOR HIGH SCHOOL (SHS) BUILDING PROGRAM, PILAR, BOHOLBuildings and Facilities | Completed | Bohol 3rd DEO | ₱2.5M |
| 17HB0142 | 8 yrs 10 mo ago | CONSTRUCTION OF SIERRA BULLONES TECHNICAL-VOCATIONAL HIGH SCHOOL (1-STOREY/2 CLASSROOMS 7M X 9M) UNDER THE SENIOR HIGH SCHOOL (SHS) BUILDING PROGRAM, SIERRA BULLONES, BOHOLBuildings and Facilities | Completed | Bohol 3rd DEO | ₱2.6M |
| 17HB0044 | 8 yrs 11 mo ago | CONSTRUCTION OF CONCRETE ROAD - CANDIJAY - COGTONG ROAD LEADING TO BEACHES AND RESORTS, CANDIJAY, BOHOLRoads: Construction - PCCP, Roads: Construction - Slope Protection using Structural Measures (e.g. Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry) | Completed | Bohol 3rd DEO | ₱14.7M |
| 17HB0084 | 9 yrs ago | (P00143735VS-CW1) CONCRETING OF TOURISM ROAD FROM ILAYA-ANGILAN-BANGWALOG-TAYTAY, DUERO, BOHOLRoads: Construction - PCCP, Roads: Construction - Slope Protection using non - structural measures (e.g. vetiver, coconet, other vegetation) | Completed | Bohol 3rd DEO | ₱9.4M |
| 17HB0120 | 9 yrs 2 mo ago | (P00145858VS-CW1) COMPLETION OF MUNICIPAL EVACUATION CENTER, POBLACION, CANDIJAY, BOHOLBuildings and Facilities | Completed | Bohol 3rd DEO | ₱23.9M |
| 17HB0073 | 9 yrs 4 mo ago | (P00145856VS-CW1) - COMPLETION OF MULTI-PURPOSE BUILDING (GINGER PROCESSING CENTER/EVACUATION CENTER), CANDABONG, LOBOC, BOHOLBuildings and Facilities | Completed | Bohol 3rd DEO | ₱960.3K |
| 17HB0078 | 9 yrs 4 mo ago | (P00142461VS-CW1) - CONSTRUCTION OF CANAYAON SEAWALL ROAD PROTECTION, WEST CANAYAON, GARCIA, HERNANDEZ, BOHOLFlood Control and Drainage | Completed | Bohol 3rd DEO | ₱9.3M |
| 17HB0079 | 9 yrs 4 mo ago | (P00142462VS-CW1) - CONSTRUCTION OF SAN ANTONIO RIVER CONTROL, DUERO, BOHOLFlood Control and Drainage | Completed | Bohol 3rd DEO | ₱9.3M |
| 17HB0086 | 9 yrs 4 mo ago | (P00143734VS-CW1) - CONCRETING OF BRGY. ROADS, COGTONG, CANDIJAY, BOHOLFlood Control: Construction - Slope Protection using non - structural measures (e.g. vetiver, coconet, other vegetation), Roads: Construction - PCCP | Completed | Bohol 3rd DEO | ₱18.8M |
| 17HB0029 | 9 yrs 4 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTIURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CANAYAON SEAWALL ROAD PROTECTION, EAST/WEST CANAYAON, GARCIA-HERNANDEZ, BOHOL, STA. 205+250.00 - STA.205+443.00 - EAST CANAYAON SECTION; STA. 205+610.00 - STA.Flood Control and Drainage | Completed | Bohol 3rd DEO | ₱9.3M |
| 17HB0025 | 9 yrs 5 mo ago | NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE - TERTIARY ROADS - JCT. DAT-AN CARMEN-SIERRA BULLONES-PILAR- ALICIA ROAD, SECTION 1: K0072+-498 - K0072+046 (K0071+600 - K0072+000); SECTION 2: K0091+262 - K0091+412 (K0091+262 - K0091+7Flood Control/Hydraulics/Drainage, Roads: Rehabilitation - PCCP | Completed | Bohol 3rd DEO | ₱14.3M |
| 17HB0052 | 9 yrs 6 mo ago | ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, JCT. (TER) JAGNA-SIERRA BULLONES ROAD, SEC. 1 - K0082+349.00 - K0082+436; SEC. 2 - K0082+450.00-K0082+600.00;Roads | Completed | Bohol 3rd DEO | ₱44.7M |
| 17HB0048 | 9 yrs 7 mo ago | (P00142548VS-CW1) LOCALLY FUNDED PROJECTS - LOCAL INFRASTRUCTURE PROGRAM - FLOOD CONTROL AND DRAINAGE - DRAINAGE/PROTECTION WORKS - CANHAWAY-ANONANG, VALENCIA SLOPE PROTECTION (CANLUSONG PORTION), VALENCIA, BOHOLRoads | Completed | Bohol 3rd DEO | ₱9.4M |
| 17HB0047 | 9 yrs 7 mo ago | (P00142877VS-CW1) CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONCRETING OF CANAWA ROADS LEADING TO CANAWA SPRING AND COCONUT PLANTATION, CANDIJAY, BOHOLFlood Control/Hydraulics/Drainage, Roads: Rehabilitation - PCCP | Completed | Bohol 3rd DEO | ₱9.4M |
| 17HB0050 | 9 yrs 7 mo ago | (P00142876VS-CW1) CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONCRETING OF BRGY. ABIHILAN, BRGY. TAMBONGAN, BRGY. CADAPDAPAN, CANDIJAY, BOHOLFlood Control/Hydraulics/Drainage, Roads: Rehabilitation - PCCP | Completed | Bohol 3rd DEO | ₱19.8M |
| 17HB0030 | 9 yrs 7 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CANSIBAO RIVER CONTROL, VALENCIA, BOHOLFlood Control and Drainage | Completed | Bohol 3rd DEO | ₱9.3M |
| 17HB0031 | 9 yrs 7 mo ago | CONSTRUCTION/IMPOVEMENT OF ACCESS ROADS LEADING TO SEAPORTS - ACCESS ROAD LEADING TO JAGNA PORT, JAGNA, BOHOLRoads | Completed | Bohol 3rd DEO | ₱9.2M |
| 17HB0032 | 9 yrs 7 mo ago | CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS - ACCESS ROAD LEADING TO LOAY PORTRoads | Completed | Bohol 3rd DEO | ₱4.6M |
| 17HB0033 | 9 yrs 7 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF PONOD RIVER CONTROL, SAWANG, GUINDULMAN, BOHOLFlood Control and Drainage | Completed | Bohol 3rd DEO | ₱9.3M |
| 17HB0034 | 9 yrs 7 mo ago | CONSTRUCTION.MAINTENACE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF LOBOC RIVER CONTROL, LOBOC, BOHOLFlood Control and Drainage | Completed | Bohol 3rd DEO | ₱9.3M |
| 17HB0036 | 9 yrs 7 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MANABA RIVER CONTROL, STA. 0+000 - STA. 0+274.20 (LEFT SIDE), STA. 0+069.00 - STA. 0+274.20 (RIGHT SIDE), GARCIA HERNANDEZ, BOHOLFlood Control and Drainage | Completed | Bohol 3rd DEO | ₱11.6M |
| 17HB0037 | 9 yrs 7 mo ago | CONSTRUCTION/MAINTENACE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF TABAJAN RIVER CONTROL, STA. 174+590.70 - STA. 174+678.00 (DOWMSTREAM), STA. 174+500.00 - STA. 174+739.00 (UPSTREAM), GUINDULMAN, BOHOLFlood Control and Drainage | Completed | Bohol 3rd DEO | ₱9.3M |
| 17HB0038 | 9 yrs 7 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF GUINSULARAN RIVER CONTROL, STA. 0+000 - STA. 0+299.50, DUERO, BOHOLFlood Control and Drainage | Completed | Bohol 3rd DEO | ₱9.3M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.