GOLDRICH CONSTRUCTION AND TRADING
Contractor 75d7005ed1efae90ec8a
Overview
PhilGEPS awards
₱8.05B · 206 awards
DPWH contracts
₱7.32B · 139 contracts
Rank by recorded value
#206 of 23,487
More info
First record
Mar 23, 2010 (16 yrs 7 mo ago)
Latest record
Jul 20, 2026 (3 mos ago)
DPWH contractor code
16489
Where they work
Latest 25 from a total of 139 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 26P00002 | 3 mos ago | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - KENNON RD - K0242+725 - K0242+755GAA 2026 OO-1 | On-Going | Cordillera Administrative Region | ₱52.7M |
| 26PD0005 | 5 mos ago | REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS: MARCOS HI-WAY-K0280+869-K0281+130, K0282+424-K0282+600GAA 2026 OO-1 | On-Going | Baguio City DEO | ₱130.4M |
| 25PD0035 | 1 yr 7 mo ago | CONTRACT PACKAGE 2: CONST/REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG A) BUED RIVER (MAIN) STA. 0+050 -STA. 0+170 B) BUED RIVER (TRIBUTARIES) STA. 0+520-STA. 0+580,GAA 2025 OO-2 | Completed | Baguio City DEO | ₱118.5M |
| 25PD0001 | 1 yr 8 mo ago | CONTRACT PACKAGE 5: PREVENTIVE MAINTENANCE: PRIMARY ROADS: A. KENNON ROAD K0242+000K0242+579, K0244+881+375, K0245+423-K0245+884,K0246+358-K0246+537, K0247+000-K0247+203 B. QUIRINO H-WAY (BAGUIO-BAUANG) K0301+786-K0303+100, K0303+863-K0305+630, C. GOV. PAGAA 2025 OO-1 | Completed | Baguio City DEO | ₱87.2M |
| 25PD0006 | 1 yr 8 mo ago | CONTRACT PACKAGE 6: PREVENTIVE MAINTENANCE: A. SECONDARY ROADS: 1. MARCOS HI-WAY K0282+870-K0283+438 2. WESTERNLINK CIRCUMFERENTIAL RD. K0281+(-298)-K0283+438 3. SESSION RD #2 K0251+404-K0252+047 4. MAJOR MANE RD K0247+050-K0247+353 B 1. F. CALDERON ST.GAA 2025 OO-1 | Completed | Baguio City DEO | ₱90.3M |
| 25PD0021 | 1 yr 8 mo ago | CONTRACT PACKAGE 7: REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE A) TERTIARY ROADS EASTERN LINK CIRCUMFERENTIAL RD K0247+920-K0247+990 B) PRIMARY ROADS KENNON RD. K0241+410-K0241+476, C) SECONDARY ROADS MARCOS HI-WAY K02GAA 2025 OO-1 | Completed | Baguio City DEO | ₱68.3M |
| 25PD0028 | 1 yr 8 mo ago | CONTRACT PACKAGE 3: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS A) MAJOR MANE TO KENNON ROAD BYPASS ROAD B) MARCOS HIGHWAY TO WESTERNLINK CIRCUMFERENTIAL ROAD BYPASS ROAD, BAGUIO CITYGAA 2025 OO-1 | Completed | Baguio City DEO | ₱64.3M |
| 25PD0033 | 1 yr 8 mo ago | CONTRACT PACKAGE 1: CONST/REH OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONST. OF FLOOD MITIGATION FACILITIES ALONG A. BALILI RIVER (MAIN) STA. 1+297-STA. 1+400 B. ASIN-GALLANO RIVER STA. 2+240-STA. 2+788GAA 2025 OO-2 | Completed | Baguio City DEO | ₱139.8M |
| 24PD0010 | 2 yrs 5 mo ago | REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS: KENNON RD. K0241+007-KO241+192, K0241+328-K0241+476Roads | Completed | Baguio City DEO | ₱43.5M |
| 24PD0014 | 2 yrs 7 mo ago | CONTRACT PACKAGE 6: REH/RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE: A. SECONDARY ROADS: 1. PMA RD. K0249+480-K0249+598 B. TERTIARY ROADS: 1. EASTERNLINK CIRCUM RD. K0247+930-K0247+980 2. PMA CUT-OFF RD. 3- (S05054LZ): CH. 1600 - CH. 1700Roads | Completed | Baguio City DEO | ₱124.7M |
| 24PD0027 | 2 yrs 7 mo ago | CONTRACT PACKAGE 5: CONST./REH. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD MITIGATION STRUCTURE ALONG: A. ASIN GALLANO RIVER B. BALILI RIVERFlood Control and Drainage | Completed | Baguio City DEO | ₱145.5M |
| 24PD0011 | 2 yrs 8 mo ago | REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS-KISAD RD-K0249+047-K0249+203Roads | Completed | Baguio City DEO | ₱31.5M |
| 24PD0026 | 2 yrs 8 mo ago | CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAINWATER COLLECTOR SYSTEM: CONSTRUCTION OF PMA RAINWATER HARVESTING FACILITIES PHASE III, PHILIPPINE MILITARY ACADEMY, FORT DEL PILAR, BAGUIO CITYWater Provision and Storage | Completed | Baguio City DEO | ₱96.5M |
| 24PD0018 | 2 yrs 8 mo ago | CONSTRUCTION OF BY-PASS AND DIVERSION ROADS: MAJOR MANE TO KENNON ROAD, BAGUIO CITYRoads | Completed | Baguio City DEO | ₱92.6M |
| 24PD0024 | 2 yrs 8 mo ago | CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG ASIN-GALLANO RIVER STA. 0+000, STA. 0+400, STA. 2+810-STA. 3+000, BAGUIO CITYFlood Control and Drainage | Completed | Baguio City DEO | ₱96.5M |
| 23P00045 | 3 yrs 4 mo ago | CONSTRUCTION OF RAIN WATER COLLECTOR - CONSTRUCTION OF A RAIN HARVESTING FACILITY (PHASE II), BUSOL WATERSHED, AMBIONG, BAGUIO CITYWater Provision and Storage | Completed | Cordillera Administrative Region | ₱48.3M |
| 23PD0063 | 3 yrs 5 mo ago | CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAINWATER COLLECTORS-CONSTRUCTION OF PMA RAINWATER HARVESTING FACILITIES, PHILIPPINE MILITARY ACADEMY, FORT DEL PILAR, BAGUIO CITYWater Provision and Storage | Completed | Baguio City DEO | ₱40.3M |
| 23PD0012 | 3 yrs 6 mo ago | REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY ROADS-MARCOS HI-WAY K0280+(-313)-K0280+(-036), K0280+430-K0280+870,K0282+876-K0283+454Roads | Completed | Baguio City DEO | ₱95.5M |
| 23PD0001 | 3 yrs 9 mo ago | CONTRACT PACKAGE 1: A. PREVENTIVE MAINTENANCE -SECONDARY ROADS: 1. ASIN RD. K0305+(-535), K0305+000-K0306+541, (S04722LZ) CHAINAGE 000-CHAINAGE 1552. LOAKAN RD. K0249+875-K0250+096, K0250+380-K0250+842 3. MAGSAYSAY AVE (TRINIDAD RD) - (S00522LZ) CHAINAGERoads | Completed | Baguio City DEO | ₱138.1M |
| 23PD0010 | 3 yrs 9 mo ago | REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY ROADS: LEONARD WOOD RD-K0250+(-196)-K0250+(-116), K0250+110-K0250+170, K0250+850-K0250+920Roads | Completed | Baguio City DEO | ₱46.1M |
| 23PD0014 | 3 yrs 9 mo ago | CONTRACT PACKAGE 2: A. REHAB/RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY ROADS: PMA RD K0249+493-K0249+598 B. CONST/UPGRADING/REHAB OF DRAINAGE ALONG NATIONAL ROADS-SECONDARY ROADS: PMA RD. K0249+717-K0249+897Roads | Completed | Baguio City DEO | ₱49.0M |
| 23PD0055 | 3 yrs 9 mo ago | CONSTRUCTION OF FLOOD MITIGATION FACILITIES/DRAINAGE SYSTEM ALONG BALILI RIVER (MAIN) STA. 0+000-STA. 1+400, BAGUIO CITYFlood Control and Drainage | Completed | Baguio City DEO | ₱82.0M |
| 23PD0056 | 3 yrs 9 mo ago | CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION FACILITIES/DRAINAGE SYSTEM ALONG BALILI RIVER (TRIBUTARIES) STA. 1+525-STA. 2+130, BAGUIO CITYFlood Control and Drainage | Completed | Baguio City DEO | ₱67.5M |
| 23PD0057 | 3 yrs 9 mo ago | CONTRACT PACKAGE 4: CONST/REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONST. OF FLOOD MITIGATION FACILITIES/DRAINAGE SYSTEM ALONG: A. BUED RIVER (MAIN), STA. 3+930-STA. 4+615, B. BUED RIVER (TRIBUTARIES), STA. 0+000Flood Control and Drainage | Completed | Baguio City DEO | ₱126.2M |
| 23PD0059 | 3 yrs 9 mo ago | CONSTRUCTION OF PMA ACCESS ROAD FROM GLOBE TOWER TO SAO AREA, PHILIPPINE MILITARY ACADEMY, FORT DEL PILAR, BAGUIO CITY, PHASE IIRoads | Completed | Baguio City DEO | ₱82.0M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.