ELKANKONSTRAK DEVELOPMENT CORPORATION
Contractor 776f9e12e1bfa5bdb206
Overview
PhilGEPS awards
₱7.49B · 173 awards
DPWH contracts
₱1.69B · 54 contracts
Rank by recorded value
#374 of 23,487
More info
First record
Jan 9, 2008 (18 yrs 10 mo ago)
Latest record
Jun 11, 2025 (1 yr 5 mo ago)
DPWH contractor code
26220
Where they work
Latest 25 from a total of 54 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 25F00293 | 1 yr 5 mo ago | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS-PALANAS-SAN ISIDRO ROAD, JOVELLAR, ALBAY, JOVELLAR, ALBAY (3RD LEGISLATIVE DISTRICT)GAA 2025 OO-1 | On-Going | Region V | ₱93.6M |
| 25FO0053 | 1 yr 7 mo ago | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, ALBAY WEST COAST RD - K0494+000 - K0495+400GAA 2025 OO-1 | On-Going | Albay 3rd DEO | ₱53.9M |
| 25FO0010 | 1 yr 7 mo ago | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - ALBAY WEST COAST RD - K0490 + 700 - K0491 + 140, K0492 + 000 - K049GAA 2025 OO-1 | On-Going | Albay 3rd DEO | ₱84.9M |
| 24FO0057 | 2 yrs 6 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION - REHABILITATION OF ALBAY WEST COAST ROAD IN BASICAO COASTAL AND MARIGONDON, PIODURANRoads | On-Going | Albay 3rd DEO | ₱56.1M |
| 24FB0073 | 2 yrs 6 mo ago | OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF RIVERBANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG BRGY.PANDAN-BRGY.BONGALONRIVERGAA 2024 OO-2 | On-Going | Albay 2nd DEO | ₱49.0M |
| 23FB0079 | 3 yrs 1 mo ago | SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG PANDAN - BUSAY RIVER, DARAGA, ALBAYFlood Control and Drainage | Completed | Albay 2nd DEO | ₱49.0M |
| 23F00087 | 3 yrs 5 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM-KATUPARAN)-GUINOBATAN-JOVELLAR-DONSOL ROAD LEADING TO PILAR PORT, GUINOBATAN AND JOVELLAR, ALBAY, GUGAA 2023 CSSP | Completed | Region V | ₱106.1M |
| 23FO0030 | 3 yrs 5 mo ago | CLUSTER III- FY 2023: REHABILITATION/RECONCTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS ALBAY WEST COAST RD - 1.) K0495+497 - K0495+559, 2.) K0499+972 - K0500+243, 3.) K0500 + (-331) - K0501 +(002), 4.) K0501+(Roads | Completed | Albay 3rd DEO | ₱71.1M |
| 23FF0047 | 3 yrs 6 mo ago | 002;CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEM-CONST. OF REVETMENT ALONG DOWNSTREAM OF HAMORAWON BRIDGE,PILI CAMARINES SURFlood Control and Drainage | Completed | Camarines Sur 3rd DEO | ₱95.1M |
| 22FO0017 | 4 yrs 4 mo ago | NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, SECONDARY ROADS, ALBAY WEST COAST ROAD K0489 + (-077) - K0489 + (320)Roads | Completed | Albay 3rd DEO | ₱23.4M |
| 22FO0090 | 4 yrs 4 mo ago | CONSTRUCTION OF FLOOD CONTROL PROJECT, BARANGAY SAN RAMON, OAS, ALBAYFlood Control and Drainage | Completed | Albay 3rd DEO | ₱19.6M |
| 22FO0064 | 4 yrs 8 mo ago | REHABILITATION OF KALAKRAN RIVERWALL, OAS, ALBAYFlood Control and Drainage | Completed | Albay 3rd DEO | ₱19.6M |
| 22FO0021 | 4 yrs 8 mo ago | REHABILITATION OF MALIDONG RIVER WALL, PIODURAN, ALBAYFlood Control and Drainage | Completed | Albay 3rd DEO | ₱19.6M |
| 22FO0025 | 4 yrs 8 mo ago | REHABILITATION OF BUSAC RIVER WALL, OAS, ALBAYFlood Control and Drainage | Completed | Albay 3rd DEO | ₱19.6M |
| 22FO0029 | 4 yrs 8 mo ago | REHABILITATION OF PANTAO RIVERWALL, PANTAO, LIBON, ALBAYFlood Control and Drainage | Completed | Albay 3rd DEO | ₱19.6M |
| 21FO0062 | 4 yrs 9 mo ago | REHABILITATION/IMPROVEMENT OF FLOOD MITIGATION STRUCTURE OF CALZADA-BONGORAN, OAS, ALBAYFlood Control and Drainage | Completed | Albay 3rd DEO | ₱29.3M |
| 21FO0064 | 5 yrs 7 mo ago | CONSTRUCTION/IMPROVEMENT OF BARANGAY TAPEL SEAWALL, OAS, ALBAYFlood Control and Drainage | Completed | Albay 3rd DEO | ₱38.2M |
| 21FO0066 | 5 yrs 7 mo ago | CONSTRUCTION OF TALISAY RIVER FLOOD MITIGATION STRUCTURE (ZONE IV), LIBON, ALBAYFlood Control and Drainage | Completed | Albay 3rd DEO | ₱25.5M |
| 21FO0013 | 5 yrs 7 mo ago | REHABILITATION OF TALONGOG-BUSAC FLOOD CONTROL, OAS, ALBAYFlood Control and Drainage | Completed | Albay 3rd DEO | ₱9.5M |
| 21FO0060 | 5 yrs 7 mo ago | CONCRETING OF BRGY. RAWIS TO BRGY. ESTRELLA FMR, BRGY. RAWIS AND BRGY. ESTRELLA, PIODURAN, ALBAYRoads | On-Going | Albay 3rd DEO | ₱9.6M |
| 20FO0021 | 5 yrs 11 mo ago | CONSTRUCTION/REHABILITATION OF CABILOGAN RIVER COURSE (SAN AGUSTIN SECTION) ( DOWNSTREAM OF DAM), LEFT SIDE, LIBON, ALBAYFlood Control and Drainage | Completed | Albay 3rd DEO | ₱17.6M |
| 20FB0135 | 5 yrs 11 mo ago | LOCAL INFRASTRUCTURE PROGRAM: CONSTRUCTION OF MULTI-PURPOSE BUILDING, ALBAY FARMERS BOUNTY VILLAGE, CAMALIG, ALBAYGAA 2020 LP | On-Going | Albay 2nd DEO | ₱14.8M |
| 20FO0077 | 6 yrs ago | REHABILITATION/IMPROVEMENT OF MAROCMOC BRIDGE FLOOD CONTROL STRUCTURE (RIGHT SIDE FACING UPSTREAM AND LEFT SIDE FACING DOWNSTREAM OF MAROCMOC BRIDGE) IN LIBON, ALBAYFlood Control and Drainage | Completed | Albay 3rd DEO | ₱9.9M |
| 20FO0085 | 6 yrs 1 mo ago | REHABILITATION/IMPROVEMENT OF BACOLOD FLOOD CONTROL STRUCTURE (LEFT SIDE FACING DOWNSTREAM OF BACOLOD BRIDGE) IN LIBON, ALBAYFlood Control and Drainage | On-Going | Albay 3rd DEO | ₱9.6M |
| 20FO0089 | 6 yrs 1 mo ago | REHABILITATION/IMPROVEMENT OF BACOLOD FLOOD CONTROL STRUCTURE (LEFT SIDE FACING DOWNSTREAM OF BACOLOD BRIDGE) IN LIBON, ALBAYFlood Control and Drainage | On-Going | Albay 3rd DEO | ₱9.5M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.