A.M. SALONG CONSTRUCTION
Contractor b03a401af236ff459a9e
Overview
PhilGEPS awards
₱1.33B · 54 awards
DPWH contracts
₱800.2M · 43 contracts
Rank by recorded value
#1,396 of 23,487
More info
First record
Jun 13, 2018 (8 yrs 5 mo ago)
Latest record
Jun 11, 2025 (1 yr 5 mo ago)
DPWH contractor code
43109
Where they work
Latest 25 from a total of 43 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 25OE0165 | 1 yr 5 mo ago | REHABILITATION OF SCHOOL BUILDING, ZONE 41-57, SAMPALOC, MANILA CITY (PHASE II)GAA 2025 SSP | On-Going | North Manila DEO | ₱33.6M |
| 25OH0089 | 1 yr 5 mo ago | CONSTRUCTION OF PUMPING STATION ALONG ESTERO DE BUHANGIN PACKAGE 1A, MANILA CITYFlood Control and Drainage | On-Going | South Manila DEO | ₱143.2M |
| 25OG0077 | 1 yr 7 mo ago | REHABILITATION OF ROAD, BARANGAY E. RODRIGUEZ, PACKAGE III, QUEZON CITYGAA 2025 SSP | Completed | Quezon City 2nd DEO | ₱28.8M |
| 25OE0081 | 1 yr 8 mo ago | INSTALLATION OF BOOSTER PUMP (ACCESSORIES) ALONG ESTERO DELA REINA, MANILA CITY (PHASE II)Flood Control and Drainage | Completed | North Manila DEO | ₱38.0M |
| 25OH0005 | 1 yr 8 mo ago | ORGANIZATIONAL OUTCOME 2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-REHABILITATION OF BALETE PUMPING STATION, MANILA CITYFlood Control and Drainage | On-Going | South Manila DEO | ₱143.3M |
| 24OE0083 | 2 yrs 8 mo ago | REHABILITATION OF MULTI-PURPOSE BUILDING WITHIN ZONE 58 TO 67, DISTRICT VI, MANILA (PHASE II)Buildings and Facilities | Completed | North Manila DEO | ₱48.2M |
| 24OE0123 | 2 yrs 8 mo ago | IMPROVEMENT OF ROAD, PUP COMPOUND (PHASE II), STA. MESA, MANILARoads | Completed | North Manila DEO | ₱9.8M |
| 24OE0001 | 2 yrs 9 mo ago | CONSTRUCTION OF PUMPING STATION AT BARANGAY 129, VITAS, TONDO, MANILA CITYFlood Control and Drainage | Completed | North Manila DEO | ₱64.5M |
| 24OE0002 | 2 yrs 9 mo ago | CONSTRUCTION OF PUMPING STATION AT ESTERO DELA REINA, BARANGAY 55 (PHASE II), TONDO, MANILA CITYFlood Control and Drainage | Completed | North Manila DEO | ₱64.2M |
| 24OE0081 | 2 yrs 9 mo ago | CONSTRUCTION OF MULTI - PURPOSE BUILDING, ZONE 41 - 57, SAMPALOC, MANILABuildings and Facilities | On-Going | North Manila DEO | ₱49.5M |
| 23OE0217 | 3 yrs 4 mo ago | CONSTRUCTION / REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAINWATER COLLECTOR SYSTEM - CONSTRUCTION OF 5 UNITS RAINWATER COLLECTOR SYSTEMWater Provision and Storage | Completed | North Manila DEO | ₱2.3M |
| 23OE0117 | 3 yrs 7 mo ago | CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY 641, ZONE 66, MANILA CITYBuildings and Facilities | Completed | North Manila DEO | ₱14.6M |
| 23OE0107 | 3 yrs 9 mo ago | REHABILITATION OF ROAD AND ALLEYS AT ZONE 25-40, MANILA CITYRoads | Completed | North Manila DEO | ₱9.9M |
| 23OB0063 | 3 yrs 9 mo ago | RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE - ORTIGAS/C5 FLYOVER (B03321LZ) ALONG ORTIGAS-C5 FLYOVERBridges | Completed | Metro Manila 1st DEO | ₱9.3M |
| 23OB0105 | 3 yrs 9 mo ago | ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE TERTIARY ROADS BLUMENTRITT - K0007 + (-1147) - K0007 + (-217)Roads | Completed | Metro Manila 1st DEO | ₱15.8M |
| 22KD0050 | 3 yrs 11 mo ago | CONSTRUCTION OF MULTI PURPOSE BUILDING, CAPITOL COMPOUND, CAGAYAN DE ORO CITYBuildings and Facilities | Completed | Cagayan de Oro City 2nd DEO | ₱9.3M |
| 22OE0047 | 4 yrs 8 mo ago | PREVENTIVE MAINTENANCE - SECONDARY ROADS - BLUMENTRITT ST (LZ) - (S02552LZ) CHAINAGE 0 - CHAINAGE 66, CHAINAGE 122.1 - CHAINAGE 400, CHAINAGE 66 - CHAINAGE 122.1Roads | Completed | North Manila DEO | ₱14.6M |
| 22OE0072 | 4 yrs 8 mo ago | REHABILITATION OF FLOOD CONTROL STRUCTURES AND FACILITIES ALONG EARNSHAW ST., (ESTERO DE SAN MIGUEL TO A.H. LACSON AVE.) AND ANTIPOLO ST., (G. TUAZON TO ESPANA BLVD.), MANILA CITYFlood Control and Drainage | Completed | North Manila DEO | ₱9.8M |
| 21KD0038 | 5 yrs 6 mo ago | CONSTRUCTION OF MULTI PURPOSE BUILDING, BRGY CUGMAN, CDOCBuildings and Facilities | Completed | Cagayan de Oro City 2nd DEO | ₱5.0M |
| 21KD0029 | 5 yrs 7 mo ago | CONSTRUCTION OF MULTI PURPOSE BUILDING BARANGAY TABLON, CAGAYAN DE ORO CITYBuildings and Facilities | Completed | Cagayan de Oro City 2nd DEO | ₱4.7M |
| 21OE0093 | 5 yrs 8 mo ago | PREVENTIVE MAINTENANCE - SECONDARY ROADS - JA SANTOS AVE. (S0228LZ) - K0005 + 158 - K0005 + 259Roads | Completed | North Manila DEO | ₱2.4M |
| 21OE0043 | 5 yrs 8 mo ago | REHABILITATION OF SCHOOL BUILDING AT AC HERRERA ELEMENTARY SCHOOL, MANILABuildings and Facilities | Completed | North Manila DEO | ₱9.6M |
| 20OE0201 | 6 yrs 3 mo ago | CONSTRUCTION / REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN WATER COLLECTORS - RAIN WATER COLLECTORS IN PUBLIC FACILITIES - CONSTRUCTION OF 16 UNITS RAINWATER COLLECTION SYSTEM (RWCS)Water Provision and Storage | Completed | North Manila DEO | ₱4.0M |
| 20KD0038 | 6 yrs 8 mo ago | CONST OF DRAINAGE STRUCTURE, BRGY NAZARETH, CDOCFlood Control and Drainage | Completed | Cagayan de Oro City 2nd DEO | ₱4.7M |
| 20OE0053 | 6 yrs 9 mo ago | LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONCRETING / UPGRADING OF ROADS AND PATHWAYS, ZONE 8-9, BARANGAY 91 - 123, MANILAFlood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Rehabilitation - PCCP | Completed | North Manila DEO | ₱5.7M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.