R-II BUILDERS, INC
Contractor b38d5e6c7301902e6f25
Overview
PhilGEPS awards
₱6.69B · 30 awards
DPWH contracts
₱2.80B · 19 contracts
Rank by recorded value
#360 of 23,487
More info
First record
Dec 30, 2010 (15 yrs 10 mo ago)
Latest record
May 17, 2024 (2 yrs 5 mo ago)
DPWH contractor code
11235
Where they work
Latest 19 from a total of 19 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 22OI0100 | 4 yrs 7 mo ago | CONSTRUCTION OF MULTI-PURPOSE BUILDING BRGY. PAMPLONA 3, LAS PINAS CITYBuildings and Facilities | On-Going | Las Piñas-Muntinlupa DEO | ₱136.4M |
| 21CJ0073 | 4 yrs 7 mo ago | CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS CONSTRUCTION OF ROAD SLOPE PROTECTION ALONG TARLAC-PALAUIG ROAD, SAN JOSE, TARLAC (PHASE 3)Flood Control and Drainage | Completed | Tarlac DEO | ₱64.2M |
| 21CJ0074 | 4 yrs 7 mo ago | CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS CONSTRUCTION OF ROAD SLOPE PROTECTION ALONG TARLAC-PALAUIG ROAD, SAN JOSE, TARLAC (PHASE 4)Flood Control Structures, Roads | Completed | Tarlac DEO | ₱64.2M |
| 21CJ0008 | 4 yrs 7 mo ago | FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG TARLAC RIVER CONTROL RIGHT DIKE, MALAYEP SECTION (PHASE III), MALAYEP, GERONA, TARLACFlood Control and Drainage | Completed | Tarlac DEO | ₱41.9M |
| 21DI0102 | 5 yrs ago | ROAD WIDENING OF BARANGAY TIMBAO TO BOUNDARY OF BARANGAY LOMA, BIÑAN CITY, LAGUNAFlood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Rehabilitation - PCCP | Terminated | Laguna 2nd DEO | ₱88.1M |
| 21DH0056 | 5 yrs ago | REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPE AND LANDSLIDE, SECONDARY ROADS, CALAMBA-STA. CRUZ-FAMY JCT.ROAD, K0097 + 325 TO K0097 + 403, KALAYAAN, LAGUNARoads | Completed | Laguna 1st DEO | ₱65.1M |
| 21OI0105 | 5 yrs ago | CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT LAS PINAS CITYGAA 2021 LP | On-Going | Las Piñas-Muntinlupa DEO | ₱137.5M |
| 21E00028 | 5 yrs 5 mo ago | REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG TABLAS CIRCUMFERENTIAL ROAD, KO069+400.00-KO069+470.00; KO069+520.00-KO069+730.00, TABLAS ISLAND, ROMBLONGAA 2021 OO-1 | Completed | MIMAROPA Region | ₱134.1M |
| 21E00029 | 5 yrs 5 mo ago | REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG PARPAGOHA-(MARIGONDON)-BINOOG ROAD, KO026+500-KO026+640; KO026+661-KO026+700; KO026+720-KO026=775, ROMBLONGAA 2021 OO-1 | Completed | MIMAROPA Region | ₱134.1M |
| 21DF0199 | 5 yrs 5 mo ago | REPAIR/REHABILITATION/CONSTRUCTION OF REVETMENT ALONG ILANG ILANG RIVER, BRGY. SAN ANTONIO, NOVELETA, CAVITE DAMAGED BY TYPHOON ULYSSESFlood Control and Drainage | On-Going | Cavite 1st DEO | ₱87.7M |
| 21E00025 | 5 yrs 6 mo ago | REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG ROMBLON-COGON-SABLAYAN ROAD, KO013+135.00-KO013+285.00; KO016+000-KO016+171.00, ROMBLONGAA 2021 OO-1 | Completed | MIMAROPA Region | ₱179.5M |
| 21E00027 | 5 yrs 6 mo ago | REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG TABLAS CIRCUMFERENTIAL ROAD, KO032+752.50-KO033+193.00, TABLAS ISLAND, ROMBLONGAA 2021 OO-1 | Completed | MIMAROPA Region | ₱143.8M |
| 21DK0008 | 5 yrs 8 mo ago | NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BYPASS AND DIVERSION ROADS, LUCBAN BY-PASS ROAD, QUEZONRoads | Completed | Quezon 1st DEO | ₱96.5M |
| 20C00074 | 5 yrs 9 mo ago | ACCESS ROAD LEADING TO MT. SAMAT FLAGSHIP TOURISM ECOZONE (TEZ), LIYANG, PILAR, BATAANRoads | Completed | Region III | ₱28.9M |
| 19OI0178 | 6 yrs ago | CONSTRUCTION OF MULTI-PURPOSE BUILDING, LAS PIÑAS CITYContingent Fund 2019 Extended | On-Going | Las Piñas-Muntinlupa DEO | ₱137.5M |
| 19E00067 | 6 yrs 1 mo ago | REHAB./RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE & LANDSLIDE, TABLAS CIRCUMFERENTIAL ROADS, KO062+800 - KO063+110.00, TABLAS ISLAND, ROMBLONContingent Fund 2019 Extended | Completed | MIMAROPA Region | ₱168.9M |
| 19Z00006 | 6 yrs 11 mo ago | CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER (SECTION A) AT GATTARAN, CAGAYANFlood Control and Drainage | Completed | Flood Control Management Cluster | ₱1.04B |
| 19CI0011 | 7 yrs 5 mo ago | CONVERGE AND SPECIAL SUPPORT PROG;CONST/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADERS INDUSTRIES AND ECONOMIC ZONES, PHIL EXPORT ZONE (PEZA) ROAD CONNECTING ANGELES MAGALANG ROAD TO EAST CIRCUMFERENTIAL ROAD IN SUPPORT OF HANDICRAFT, FURNITURE, MANUFACTURoads | Completed | Pampanga 3rd DEO | ₱14.5M |
| 19CI0049 | 7 yrs 5 mo ago | CONVERGE AND SPECIAL SUPPORT PROGRAM;CONST/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES,INDUSTRIES AND ECONOMIC ZONES; NLEX-SCTEX CONNECTING ROAD IN SUPPORT OF FURNITURES, IT-BPM,HOTELS,GARMENTS AND TEXTILE INDUSTRIES, ANGELES CITY,PAMPANGARoads | Completed | Pampanga 3rd DEO | ₱29.4M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.