BLUE MOUNTAIN BUILDERS & GENERAL MDSE.(FOR. BLUE M
Contractor c010cf6abba2b032efcb
Overview
PhilGEPS awards
₱0 · 0 awards
DPWH contracts
₱1.43B · 73 contracts
Rank by recorded value
#1,905 of 23,487
More info
First record
Jan 28, 2016 (10 yrs 9 mo ago)
Latest record
Apr 4, 2022 (4 yrs 7 mo ago)
DPWH contractor code
34745
Where they work
Ilocos Norte₱1.43B
Latest 25 from a total of 73 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 18AA0249 | 8 yrs 8 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO AGAL-MASI, POBLACION ADAMS, ADAMS, ILOCOS NORTEFlood Control and Drainage | Completed | Ilocos Norte 1st DEO | ₱28.2M |
| 18AA0100 | 8 yrs 8 mo ago | CONST. OF FC STRUCTURES ALONG QUIBEL RIVER, BRGY. POBLACION, DUMALNEG, ILOCOS NORTEFlood Control and Drainage | Completed | Ilocos Norte 1st DEO | ₱23.5M |
| 18AA0102 | 8 yrs 8 mo ago | CONST. OF FC STRUCTURES ALONG BOLO RIVER, DARNA BRIDGE, BRGY. SAN ISIDRO, DUMALNEG, ILOCOS NORTEFlood Control and Drainage | Completed | Ilocos Norte 1st DEO | ₱28.8M |
| 18AA0115 | 8 yrs 8 mo ago | CONST. OF FC STRUCTURES ALONG LAMUK RIVER, BRGY. POBLACION, DUMALNEG, ILOCOS NORTEFlood Control and Drainage | Completed | Ilocos Norte 1st DEO | ₱42.0M |
| 18AA0141 | 8 yrs 8 mo ago | CONST. OF FC STRUCTURE ALONG STA. MARIA RIVER RIGHT BANK DOWNSTREAM STA 0+000-0+920 DUMALNEG, I.N.Flood Control and Drainage | Completed | Ilocos Norte 1st DEO | ₱42.2M |
| 18AA0185 | 8 yrs 8 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CAUNAYAN RIVER, U/S & D/S OF CAUNAYAN BRIDGE (L&R BANK), PAGUDPUD, ILOCOS NORTEFlood Control and Drainage | Completed | Ilocos Norte 1st DEO | ₱24.5M |
| 18AA0186 | 8 yrs 8 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAOI RIVER, U/S & D/S OF BALAOI BRIDGE (L&R BANK), BRGY. BALAOI, PAGUDPUD, ILOCOS NORTEFlood Control and Drainage | Completed | Ilocos Norte 1st DEO | ₱23.5M |
| 18AA0190 | 8 yrs 8 mo ago | CONST. OF FC STRUCTURE ALONG KALAW RIVER, STA. 0+000-0-+910, DUMALNEG, ILOCOS NORTEFlood Control and Drainage | Completed | Ilocos Norte 1st DEO | ₱42.1M |
| 17AA0379 | 9 yrs 2 mo ago | CONCRETING OF BRGY. SAN ISIDRO FMR WITH BOX CULVERT, BRGY. SAN ISIDRO, DUMALNEG, ILOCOS NORTERoads | Completed | Ilocos Norte 1st DEO | ₱5.0M |
| 16AA0196 | 10 yrs 4 mo ago | CONST. OF SHS, 2 STRY-4CL, DUMALNEG NHS, DUMALNEG, I.NBuildings and Facilities | Completed | Ilocos Norte 1st DEO | ₱6.1M |
| 16AA0149 | 10 yrs 5 mo ago | REPAIR/REHAB. OF F/C PROTECTION ALONG ABANG CREEK, BRGY. LANAO, BANGUI, I. NORTEFlood Control and Drainage | Completed | Ilocos Norte 1st DEO | ₱9.6M |
| 16AA0133 | 10 yrs 5 mo ago | REPAIR/REHAB OF FC ALONG ABANG CREEK, SITIO CALCALIAT, BRGY. MALASIN, BANGUI, I.NFlood Control and Drainage | Completed | Ilocos Norte 1st DEO | ₱9.6M |
| 16AA0132 | 10 yrs 5 mo ago | CONST. OF HIGHWAY DRAINAGE ALONG CREEK NEAR DENR OFFICE, BRGY. MANAYON BANGUI, I.NRoads | Completed | Ilocos Norte 1st DEO | ₱4.8M |
| 16AA0101 | 10 yrs 5 mo ago | SABO/FC PROJ. ALNG LRB & PRIN. RIV/TRIB-CONST. OF FC STRUC, BRGY BADUANG, PAGUDPUD I.N.Flood Control and Drainage | Completed | Ilocos Norte 1st DEO | ₱9.6M |
| 16AA0147 | 10 yrs 5 mo ago | CONST. OF MPB, BRGY. POBLACION, DUMALNEG, ILOCOS NORTEBuildings and Facilities | Completed | Ilocos Norte 1st DEO | ₱2.0M |
| 16AA0080 | 10 yrs 8 mo ago | IMPROV'T./REHAB. OF MPB, SAN ISIDRO, DUMALNEG, ILOCOS NORTEBuildings and Facilities | Completed | Ilocos Norte 1st DEO | ₱548.9K |
| 16AA0048 | 10 yrs 8 mo ago | DAMAGED FC FACILITIES/STRUCTURES UNDER THE LRBFC & SABO PROJ, PAGUDPUD FC, CAUNAYAN RIVER, # CAUNAYAFlood Control and Drainage | Completed | Ilocos Norte 1st DEO | ₱9.3M |
| 16AA0041 | 10 yrs 9 mo ago | DAMAGED FC FACILITIES/STRUCTURES UNDER LRBFC & SABO PROJS, PAGUDPUD FC, BOLO RIVER, # DAMPIG, I.NFlood Control and Drainage | Completed | Ilocos Norte 1st DEO | ₱14.3M |
| 16AA0042 | 10 yrs 9 mo ago | DAMAGED FC FACILITIES/STRUTURES UNDER THE LRBFC & SABO PROJS, BANGUI FC, BOLO RIVER, ERODED, BANGUI,Flood Control and Drainage | Completed | Ilocos Norte 1st DEO | ₱14.3M |
| 16AA0049 | 10 yrs 9 mo ago | DAMAGED FC FACILITIES/STRUCTURE UNDER LRBFC & SP, SARRAT FC, #7, SAN MANUEL, SARRAT, I.NFlood Control and Drainage | Completed | Ilocos Norte 1st DEO | ₱11.3M |
| 16AA0052 | 10 yrs 9 mo ago | DAMAGED FC FACILITIES/STRUCTURES UNDER THE LRBFC, PAGUDPUD FC BAAG RIVER, # PASALENG, PAGUDPUD, I.NFlood Control and Drainage | Completed | Ilocos Norte 1st DEO | ₱9.4M |
| 16AA0050 | 10 yrs 9 mo ago | DAMAGED FC FACILITIES/STRUCTURES UNDER LRBFC & SP, DUMALNEG FC BR APPROACH ALONG CABARITAN RIVER, DUFlood Control and Drainage | Completed | Ilocos Norte 1st DEO | ₱14.3M |
| 26AA0020 | — | CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - NAPIDAD VIEWDECK AND WATERFALLS OF TAKULAO MATALTALA AND PAO (STA. 567+620 - STA. 567+870), DUMALNEG, ILOCOS NORTEGAA 2026 CP | Not Yet Started | Ilocos Norte 1st DEO | ₱4.1M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.