AGONG BUILDERS AND CONSTRUCTION SUPPLY, INC.
Contractor dbd5d4e8255d761a5368
Overview
PhilGEPS awards
₱7.25B · 417 awards
DPWH contracts
₱5.33B · 374 contracts
Rank by recorded value
#260 of 23,487
More info
First record
Mar 15, 2017 (9 yrs 7 mo ago)
Latest record
Sep 17, 2026 (1 mo ago)
DPWH contractor code
40494
Where they work
Latest 25 from a total of 374 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 26LB0028 | 1 mo ago | RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE - BOLTON BR. 1 (B01459MN) ALONG ABS-CBN-QUIMPO BLVD DIV. RDGAA 2026 OO-1 | On-Going | Davao City DEO | ₱47.6M |
| 26MB0007 | 1 mo ago | PREVENTIVE MAINTENANCE - SECONDARY ROADS - MAKAR-MARBEL RD - K1656 + (-1069) - K1656 + (-769.66)GAA 2026 OO-1 | On-Going | South Cotabato 1st DEO | ₱36.7M |
| 26KL0147 | 2 mos ago | WIDENING OF PERMANENT BRIDGE ALONG GINGOOG - CLAVERIA - VILLANUEVA RD - GUIBONE PARALLEL BRIDGE (B01218MN), BRGY. APOSKAHOY, CLAVERIA, MISAMIS ORIENTALGAA 2026 OO-1 | On-Going | Misamis Oriental 2nd DEO | ₱61.3M |
| 26L00037 | 3 mos ago | PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - MAHARLIKA HIGHWAY (MN) - (S00060MN) K1454+006 - K1454+341, (S00068MN) K1454+(-091) - K1454+(-006), DAVAO DEL NORTEGAA 2026 OO-1 | On-Going | Region XI | ₱34.5M |
| 26LC0037 | 4 mos ago | NABUNTURAN-LAAK ROAD, BARANGAY SANTA FE (STA.6+429.650 + STA. 6+505.65), NEW CORELLA, DAVAO DEL NORTEGAA 2026 OO-1 | On-Going | Davao del Norte DEO | ₱94.4M |
| 26MC0026 | 4 mos ago | REHABILITATION OF PERMANENT BRIDGES - MARBEL BR. (B00261MN) ALONG PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RDGAA 2026 OO-1 | On-Going | Cotabato 2nd DEO | ₱9.5M |
| 25M00198 | 4 mos ago | PREVENTIVE MAINTENANCE - SIMUAY - LANDASAN - PARANG ROAD (S01761MN) K1872+000 - K1874+000, SULTAN MASTURA, MAGUINDANAO DEL NORTEGAA 2025 OO-1 | On-Going | Region XII | ₱48.1M |
| 26MF0003 | 5 mos ago | PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DULAWAN-MARBEL RD - K1761 + 410 - K1761 + 678GAA 2026 OO-1 | On-Going | Sultan Kudarat 1st DEO | ₱23.4M |
| 26LA0004 | 6 mos ago | LANGGAM BR. (B00206MN) ALONG SURIGAO-DAVAO COASTAL RD., MACO DAVAO DE OROGAA 2026 OO-1 | On-Going | Davao de Oro 1st DEO | ₱4.8M |
| 26LA0006 | 6 mos ago | PAGAKPAK BR. (B00200MN) ALONG SURIGAO-DAVAO COASTAL RD., PANTUKAN, DAVAO DE OROGAA 2026 OO-1 | On-Going | Davao de Oro 1st DEO | ₱4.8M |
| 25M00042 | 11 mos ago | WIDENING OF BRIDGE - TINAGAKAN BR. (B01017MN) ALONG DIGOS-MAKAR RD (PHASE II), GENERAL SANTOS CITYGAA 2025 OO-1 | On-Going | Region XII | ₱26.2M |
| 25LA0068 | 1 yr 2 mo ago | CONSTRUCTION (COMPLETION) OF ADMINISTRATIVE BUILDING, DAVAO DE ORO 1ST DEO, NABUNTURAN, DAVAO DE OROGAA 2025 LFP | On-Going | Davao de Oro 1st DEO | ₱19.6M |
| 25LK0062 | 1 yr 2 mo ago | CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) AT BUHANGIN CENTRAL ELEM. SCHOOL, BRGY. BUHANGIN PROPER, DAVAO CITY, DAVAO DEL SURGAA 2025 SSP | On-Going | Davao City 3rd DEO | ₱10.7M |
| 25M00034 | 1 yr 2 mo ago | CONSTRUCTION OF PEDESTRIAN OVERPASS AT MAHARLIKA HIGHWAY (DIGOS-MAKAR RD) - K1648 + 905, GENERAL SANTOS CITYRoads | On-Going | Region XII | ₱23.4M |
| 25LA0089 | 1 yr 3 mo ago | CONSTRUCTION OF ROAD, POBLACION, MAWAB TO DIZON AREA, MAWAB, DAVAO DE OROGAA 2025 SSP | On-Going | Davao de Oro 1st DEO | ₱34.2M |
| 25M00172 | 1 yr 4 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALASILA RIVER PACKAGE 3, STA. 0+000 - STA. 0+410 AND STA. 0+425 -STA. 465.2, BARANGAY LUNA NORTE, MAKILALA, COTABATOGAA 2025 OO-2 | On-Going | Region XII | ₱93.4M |
| 25L00094 | 1 yr 4 mo ago | CONSTRUCTION OF DRAINAGE STRUCTURES ALONG ROAD - MAHARLIKA HIGHWAY - K1508+(-092) - K1508+(-056), DAVAO CITYRoads | On-Going | Region XI | ₱3.8M |
| 25L00113 | 1 yr 4 mo ago | CONSTRUCTION (COMPLETION) OF MILITARY BARRACKS BUILDING TYPE 1, HQS10ID, CAMP GEN MANUEL T. YAN SR., BRGY. TUBORAN, MAWAB, DAVAO DE OROGAA 2025 CP | On-Going | Region XI | ₱10.8M |
| 25LA0074 | 1 yr 4 mo ago | CONCRETING OF BRGY. MALINAWON FMR (PHASE IV), BRGY. MALINAWON, MAWAB, DAVAO DE OROGAA 2025 DA FMR | On-Going | Davao de Oro 1st DEO | ₱14.9M |
| 25LK0051 | 1 yr 4 mo ago | REHABILITATION / MAJOR REPAIR OF BRIDGE - AGDAO FLYOVER (B00603MN) ALONG JP CABAGUIO AVEGAA 2025 OO-1 | Completed | Davao City 3rd DEO | ₱9.5M |
| 25L00084 | 1 yr 5 mo ago | RETROFITTING/STRENGTHENING OF BRIDGE - PILAN PARALLEL BR. (B01997MN) ALONG MAHARLIKA HIGHWAY (DAVAO CITY - JCT. DIGOS SECT), DAVAO DEL SURGAA 2025 OO-1 | On-Going | Region XI | ₱13.6M |
| 25NH0064 | 1 yr 5 mo ago | CONSTRUCTION OF BRIDGE BARANGAY CALAGDAAN, CANTILAN, SURIGAO DEL SURGAA 2025 SSP | On-Going | Surigao del Sur 1st DEO | ₱38.8M |
| 25LK0015 | 1 yr 5 mo ago | CONSTRUCTION OF DRAINAGE STRUCTURE - JCT. ACACIA ROAD - PUROK NEW VISAYAS LEADING TO SAFARI LAND CROCODILE PARK, BRGY. ACACIA, DAVAO CITYFlood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - PCCP | On-Going | Davao City 3rd DEO | ₱9.5M |
| 25L00032 | 1 yr 5 mo ago | REHABILITATION/MAJOR REPAIR OF BRIDGE - BUNAWAN BRIDGE 2 (B01619MN) ALONG MAHARLIKA HIGHWAY, DAVAO CITYBridges | On-Going | Region XI | ₱1.9M |
| 25L00033 | 1 yr 5 mo ago | REHABILITATION/MAJOR REPAIR OF BRIDGE - BUNAWAN BRIDGE 1 (B01689MN) ALONG MAHARLIKA HIGHWAY, DAVAO CITYBridges | On-Going | Region XI | ₱5.6M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.