HGG BUILDERS AND SUPPLY
Contractor ec3f626bfe65584132d4
Overview
PhilGEPS awards
₱51.87B · 696 awards
DPWH contracts
₱20.46B · 259 contracts
Rank by recorded value
#18 of 23,487
More info
First record
Feb 22, 2007 (19 yrs 8 mo ago)
Latest record
Nov 14, 2025 (1 yr ago)
DPWH contractor code
17824
Where they work
Latest 25 from a total of 259 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 25FD0119 | 1 yr ago | CONSTRUCTION OF ANIB-COTMO COASTAL BRIDGE, SIPOCOT, CAMARINES SUR (PHASE 2)GAA 2025 SSP | On-Going | Camarines Sur 1st DEO | ₱78.0M |
| 25F00249 | 1 yr 1 mo ago | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-CONSTRUCTION OF NEW BRIDGES-VIADUCT ALONG MAHARLIKA HIGHWAY, CAMARINES SUR (PACKAGE 1), LIBMANAN, CAMARINES SUR (2ND LEGISLATIVE DISTRICT)GAA 2025 OO-1 | On-Going | Region V | ₱101.5M |
| 25F00251 | 1 yr 1 mo ago | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-CONSTRUCTION OF NEW BRIDGES-VIADUCT BR. ALONG MAHARLIKA HIGHWAY (LZ) (PACKAGE 3), LIBMANAN, CAMARINES SUR (2ND LEGISLATIVE DISTRICT)GAA 2025 OO-1 | On-Going | Region V | ₱153.5M |
| 25F00388 | 1 yr 3 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD, PALASPAS, DEL GALLERoads | On-Going | Region V | ₱178.2M |
| 25FD0080 | 1 yr 4 mo ago | CONSTRUCTION OF ROAD, DOMAGONDONG, DEL GALLEGO, CAMARINES SURGAA 2025 SSP | Completed | Camarines Sur 1st DEO | ₱135.1M |
| 25FD0087 | 1 yr 4 mo ago | CONSTRUCTION OF ROAD, SALVACION, RAGAY, CAMARINES SURGAA 2025 SSP | On-Going | Camarines Sur 1st DEO | ₱142.0M |
| 25E00228 | 1 yr 7 mo ago | SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. ESTRELLA-BRGY. SAN JOSE, STA. 000+617-STA. 001+148.6, NAUJAN, OR. MINDOROGAA 2025 SSP | On-Going | MIMAROPA Region | ₱231.1M |
| 25E00229 | 1 yr 7 mo ago | SUSTAINABLE INFRASTUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENTRESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG ESTRELLA, STA. 000+000-STA. 000+616.85, NAUJAN, OR. MINDOROGAA 2025 SSP | On-Going | MIMAROPA Region | ₱277.2M |
| 24F00495 | 1 yr 7 mo ago | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-LIGAO-PIO DURAN RD-K0510+665-K0510+815, LIGAO CITY, ALBAY (3RD LEGISLATIVE DUnprogrammed Appropriations 2024 | On-Going | Region V | ₱159.1M |
| 25DD0063 | 1 yr 8 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES, CONSTRUCTION OF LIPA CITY - MATAASNAKAHOY DIGAA 2025 SSP | On-Going | Batangas 4th DEO | ₱140.5M |
| 25E00075 | 1 yr 8 mo ago | CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, (UPSTREAM), BRGY. MULAWIN-BRGY. DEL PILAR, NAUJAN,GAA 2025 OO-2 | On-Going | MIMAROPA Region | ₱276.0M |
| 25E00076 | 1 yr 8 mo ago | CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, (DOWNSTREAM), BRGY. MULAWIN-BRGY. DEL PILAR, NAUJAN, OR. MINDOROGAA 2025 OO-2 | On-Going | MIMAROPA Region | ₱230.0M |
| 25E00084 | 1 yr 8 mo ago | CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, PHASE 1, BRGY. MULAWIN, NAUJAN, OR. MINDOROGAA 2025 OO-2 | On-Going | MIMAROPA Region | ₱239.3M |
| 25E00088 | 1 yr 8 mo ago | CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG BUCAYAO GRANDE RIVER, BRGY. MALVAR (UPSTREAM-LEFTSIDE), NAUJAN, OR. MINDOROGAA 2025 OO-2 | On-Going | MIMAROPA Region | ₱115.2M |
| 24E00299 | 1 yr 10 mo ago | SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF TORRIJOS SHORE PROTECTION/BOULEVARD, BRGY. POBLACION-BRGY. BUANGAN, TORRIJOS, MARINDUQUEUnprogrammed Appropriations 2024 | On-Going | MIMAROPA Region | ₱185.3M |
| 24KE0047 | 2 yrs 4 mo ago | CONSTRUCTION OF SLOPE PROTECTION ALONG CROSS COUNTRY ROAD, CATARMAN TO MAMBAJAO (PACKAGE 1), CATARMAN, CAMIGUINFlood Control and Drainage | On-Going | Camiguin DEO | ₱71.8M |
| 24E00001 | 2 yrs 4 mo ago | NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS- MARINDUQUE CIRCUMFERENTIAL ROAD, K0057+460-K0064+994 (INTERMITTENT SECTIONS), MARINDUQUEGAA 2024 OO-1 | On-Going | MIMAROPA Region | ₱148.2M |
| 24HK0124 | 2 yrs 5 mo ago | ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF BANICA RIVER CONTROL STRUCTURE, BARANGAY BALUGO, DUMAGUETE CIGAA 2024 OO-2 | On-Going | Negros Oriental 2nd DEO | ₱48.3M |
| 24HK0125 | 2 yrs 5 mo ago | ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF BANICA RIVER CONTROL STRUCTURE, BARANGAY CANDAU-AY, DUMAGUETEGAA 2024 OO-2 | On-Going | Negros Oriental 2nd DEO | ₱48.3M |
| 24MC0043 | 2 yrs 7 mo ago | CONSTRUCTION OF FLOOD CONTROL DIKE ALONG KABACAN RIVER STA. 45 + 642 - STA. 46 + 292 R/S (PHASE II), BARANGAY ALEGRIA, PRES. ROXAS, COTABATO (REPUBLISHED)GAA 2024 OO-2 | Completed | Cotabato 2nd DEO | ₱95.5M |
| 24MC0047 | 2 yrs 7 mo ago | CONSTRUCTION OF FLOOD CONTROL DIKE ALONG KABACAN RIVER STA. 48 + 944 - STA. 49 + 284 R/S, BARANGAY INAC, MAGPET, COTABATOGAA 2024 OO-2 | Completed | Cotabato 2nd DEO | ₱95.5M |
| 24F00187 | 2 yrs 7 mo ago | ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MINASAG RIVER, BARANGAY SANFlood Control and Drainage | Completed | Region V | ₱154.4M |
| 24H00002 | 2 yrs 7 mo ago | OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MGMT. PROG., CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF LOBOC RIVER CONTROL STRUCTURE, POBLACION SAWANG, RIGHT SIDE PHASE 1, LOBOC,GAA 2024 OO-2 | On-Going | Region VII | ₱241.2M |
| 24MC0045 | 2 yrs 7 mo ago | CONSTRUCTION OF FLOOD CONTROL DIKE ALONG KABACAN RIVER STA. 46 + 900 - STA. 47 + 125 R/S, BARANGAY INAC, MAGPET, COTABATOGAA 2024 OO-2 | Completed | Cotabato 2nd DEO | ₱95.5M |
| 24F00193 | 2 yrs 8 mo ago | ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE(SEAWALL), BARANGAY SABANG, VINZONS, CFlood Control and Drainage | Completed | Region V | ₱173.7M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.