Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 15BD0148

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","15BD0148","CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURE (GABION W/ STEEL SHEET PILES), SAN ISIDRO, IGUIG, CAGAYAN","Flood Control and Drainage","Completed",28638256.69,0,100,"Cagayan 3rd DEO","Region II","DEKM CONSTRUCTION (32409) / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722)","2016-03-08","2016-11-02",2016,"Regular Infra - GAA 2016 MFO-2",17.77019,121.7139,"201515000","201500000"]
SHA-256
65d67dde53358a2af9fa2d08f125937d5fc5cbb733b01271951d0de20c8c9924

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.