Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 15GD0109

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","15GD0109","CONST/MAINT OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYS-CADIO FLOOD CONTROL ALONG PANAY RIVER","Flood Control and Drainage","Completed",19596206.1,0,100,"Capiz 1st DEO","Region VI","CLIFFORD CONSTRUCTION CORPORATION (3724)","2016-02-07","2016-08-30",2016,"Regular Infra - GAA 2016 MFO-2",null,null,null,"601900000"]
SHA-256
584a5a319d598a34d6f9284844bcbb9db37920cbae0a8ff5e5c841e781319c6c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.