Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 15HH0132

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","15HH0132","CONSTRUCTION OF CATCHBASIN OF SUBANGDAKU RIVER (STEEL SHEET PILE WITH COPING) AT UPSTREAM AND DOWNSTREAM OF CIP BRIDGE, SECOND AVENUE, NORTH RECLAMATION AREA, CEBU CITY","Flood Control and Drainage","Completed",45988984.2,0,100,"Cebu City DEO","Region VII","BNR CONSTRUCTION & DEVELOPMENT CORP. (12903)","2016-02-24","2016-09-11",2016,"Regular Infra - GAA 2016 MFO-2",null,null,"730600000","702200000"]
SHA-256
7140c6c31f54546fc913f82016f119bdb26e69f0f9c2d5128ca4499d0ab868ed

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.