Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16CB0068

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16CB0068","CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS) BATAAN 2ND DISTRICT","Water Provision and Storage","Completed",3304074.11,0,100,"Bataan 2nd DEO","Region III","N.V. BALBUENA CONSTRUCTION (12055)","2016-10-11","2016-12-22",2016,"Regular Infra - GAA 2016 MFO-3",null,null,null,"300800000"]
SHA-256
c9a2f7f688808e99217175fdbf00c03d8f0374a666e2d0aa4bf5b98ae9fd690e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.