Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16HH0115

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16HH0115","CONSTRUCTION / MAINTENANCE OF FLOOD CONTROL MITIGATION  STRUCTURES, BRGY. SAN NICOLAS PROPER, CEBU CITY","Flood Control and Drainage","Completed",2325808.13,0,100,"Cebu City DEO","Region VII","PHIL ASIA RESOURCES & DEVELOPMENT CORP. (33352)","2017-02-23","2017-05-23",2017,"Regular Infra - GAA 2017 MFO-2",null,null,"730600000","702200000"]
SHA-256
6de4831a309111d9427fc64a77a2d3ed8f15c3c9b56041eee2c84194f440102e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.