Project 16OE0057
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16OE0057","MFO 2-FLOOD MANAGEMENT SERVICES-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM-CONSTRUCTION OF RIVERWALL, ESTERO DE MAYPAJO, RIZAL AVENUE SECTION, TONDO, MANILA CITY 2ND LD.","GAA 2016 MFO-2","Completed",46487811.69,0,100,"North Manila DEO","National Capital Region","C.T. LEONCIO CONSTRUCTION & TRADING (17371) / M.V. CALDO CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY: M.V. CALDO ENGINEERING CONSTRUCTION AND S) (16938)","2016-03-30","2017-04-08",2016,"Regular Infra - GAA 2016 MFO-2",14.63454,120.98123,"1380600000","1303900000"]
SHA-256
62a102186da6976af18b77499904b6087785c8a6d19d2a6c59e95abd4bfb25deHash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.