Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17BB0077

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17BB0077","CONSTRUCTION OF VARIOUS SCHOOL BUILDING WITH TOILET, BIRAO ELEMENTARY SCHOOL, BAGGAO, CAGAYAN; VALLEY COVE INTEGRATED SCHOOL, BAGGAO, CAGAYAN","Buildings and Facilities","Completed",5428773.45,0,100,"Cagayan 1st DEO","Region II","F.P. TABBADA CONSTRUCTION (41796)","2017-11-22","2019-10-01",2017,"Outside Infra - GAA 2017 DepEd BEFF",17.89162,121.98503,"201506000","201500000"]
SHA-256
2af936adc28e817aac0990e62a582fae9c078457a24835727306934e5c5711cd

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.