Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17BI0049

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17BI0049","CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES ALONG MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CAGAYAN RIVER BASIN - CONSTRUCTION OF MAGAT RIVER CONTROL, CABARROGUIS SECTION (STA. 0+000 - STA. 0+276), BAYOMBONG, NUEVA VIZCAYA","Flood Control and Drainage","Completed",13891267.55,0,100,"Nueva Vizcaya DEO","Region II","J.E.L. CONSTRUCTION & SUPPLY (40852)","2017-07-16","2017-12-12",2017,"Regular Infra - GAA 2017 MFO-2",16.47394,121.14291,"205005000","205000000"]
SHA-256
2998d10ad7594e9f9dcfe7f85e394f3c89dd7ad7c0b707310ebe46f51d4e740b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.