Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17DO0010

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17DO0010","MFO2-FLOOD MANAGEMENT SERVICES-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAIANGE SYSTEMS-REHABILITATION/IMPROVEMENT/CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG PILILLA RIVER, PILILLA RIZAL 2ND LD","GAA 2017 MFO-2","Completed",18186320.48,0,100,"Rizal 2nd DEO","Region IV-A","MSB VITUG CONSTRUCTION INC. (FORMERLY MSB VITUG CONSTRUCTION) (33019)","2017-02-09","2017-07-27",2017,"Regular Infra - GAA 2017 MFO-2",null,null,null,"405800000"]
SHA-256
90a24a8f6f456ecb6c24251357d487d939d7d70b21e23859809524de61d58af3

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.