Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17EB0052

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17EB0052","CONSTRUCTION OF POLA FLOOD CONTROL, STA CRUZ, OCCIDENTAL MINDORO LONE DISTRICT","GAA 2017 MFO-2","Completed",29399668.66,0,100,"Mindoro Occidental DEO","MIMAROPA Region","LIM GENERAL CONTRACTOR CORPORATION (8482)","2017-06-02","2018-10-01",2017,"Regular Infra - GAA 2017 MFO-2",null,null,null,null]
SHA-256
d897e1f95647dd4e187f021bf3a7fda9592bc2f6679fd240e3112de39b5531d0

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.