Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17FE0019

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17FE0019","CONSTRUCTION/REHABILITATION/IMPROVEMENT OF BICOL RIVER FLOOD CONTROL (TRIANGULO SECTION) ,STA. 21+256.50 TO STA. 21+416, BRGY. TRIANGULO, NAGA CITY","Flood Control and Drainage","Completed",18600382,0,100,"Camarines Sur 3rd DEO","Region V","BIMBO CONSTRUCTION AND SUPPLY (FORMERLY BIMBO CONS (25022)","2017-04-23","2018-07-29",2017,"Regular Infra - GAA 2017 MFO-2",null,null,null,"501700000"]
SHA-256
1bcad885ab9752c9b3027870028740b7354c206557c8e24510e462544ed2c08d

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.