Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17GG0073

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17GG0073","CONSTRUCTION OF SUAGE RIVER CONTROL CONTROL SYSTEM AT THE BACK OF FEDERICO ROMAN TIRADOR DISTRICT MEMORIAL HOSPITAL, JANIUAY, ILOILO","GAA 2017 MFO-2","Completed",41850636.99,0,100,"Iloilo 2nd DEO","Region VI","C.B. GARAY PHILWIDE BUILDERS (6004) / VANNIE CONSTRUCTION  AND SUPPLY (FORMERLY: VANNIE (27335)","2017-06-19","2017-12-17",2017,"Regular Infra - GAA 2017 MFO-2",null,null,null,"603000000"]
SHA-256
06005cde25bdd6f8855bddf3a5fae951851f833867ba9bbad0814a11a3798046

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.