Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17HB0033

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17HB0033","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF PONOD RIVER CONTROL, SAWANG, GUINDULMAN, BOHOL","Flood Control and Drainage","Completed",9308168,0,100,"Bohol 3rd DEO","Region VII","MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY (9354)","2017-03-20","2017-09-14",2017,"Regular Infra - GAA 2017 MFO-2",null,null,null,"701200000"]
SHA-256
3c553fbd47fc422d2350ec14f09beaf8029e0d8682c0d05ce83805e2250e8dcf

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.