Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17HC0117

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17HC0117","CONSTRUCTION OF TWO (2) 1-STOREY/UNIQUE WORKSHOP BUILDING, 7.00M X 22.50M (ISLAND) AT BONBONON HIGH SCHOOL, PRES. CARLOS P. GARCIA (PITOGO), BOHOL","Buildings and Facilities","Completed",7132458.5,0,100,"Bohol 2nd DEO","Region VII","MAI CONSTRUCTION & SUPPLY (30839)","2018-01-23","2018-07-01",2017,"Outside Infra - GAA 2017 DepEd BEFF",10.12499,124.5779,"701235000","701200000"]
SHA-256
8fbd2fdc840b826c77961994aef9bdcf2128c11cf99d8f7c0356346ea7b05110

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.