Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17OD0083

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17OD0083","CONSTRUCTION OF FLOOD CONTROL WALL/RIPRAPPING ALONG THE BANKS OF VARIOUS CREEKS IN BRGY. 180 (PHASE 2), CALOOCAN CITY","GAA 2017 MFO-2","Completed",22091560,0,100,"Metro Manila 3rd DEO","National Capital Region","KING EIGHT BUILDERS AND SUPPLY (37325) / PRECIOUS CONSTRUCTION (32995)","2017-04-25","2017-10-26",2017,"Regular Infra - GAA 2017 MFO-2",14.76675,121.08328,"1380100000","1307500000"]
SHA-256
2d2dec29833bf713223887940caffbb0d6cd288f0b4b63250df3fa661287ac73

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.