Project 17OE0092
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17OE0092","MFO 2-FLOOD MANAGEMENT SERVICES CONSTRUCTION.MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: PROPOSED FEEDER CHANNEL FOR THE BLUMENTRITT INTERCEPTORS, MANILA CITY TONDO, MANILA","GAA 2017 MFO-2","Completed",22325034.02,0,100,"North Manila DEO","National Capital Region","C.T. LEONCIO CONSTRUCTION & TRADING (17371) / M.V. CALDO CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY: M.V. CALDO ENGINEERING CONSTRUCTION AND S) (16938)","2017-09-20","2018-11-11",2017,"Regular Infra - GAA 2017 MFO-2",14.632,120.98034,"1380600000","1303900000"]
SHA-256
a23447da5562c532ef39e385e06374075ed300d51c19e285ca60215618ef8313Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.