Project 18AD0025

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18AD0025","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS :CONSTRUCTION OF SALVADOR 1ST FLOOD CONTROL, AT BINNUYOG BRIDGE (BRGY. SALVADOR 1ST SECTION), CANDON CITY, ILOCOS SUR","Flood Control and Drainage","Completed",28016140.32,0,100,"Ilocos Sur 2nd DEO","Region I","R.S. SEPIAN CONSTRUCTION & TRUCKING (20519)","2018-04-02","2019-05-15",2018,"Regular Infra - GAA 2018 OO-2",17.21943,120.4921,"102906000","102900000"]