Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18BA0077

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18BA0077","STANDARD TWO-STOREY (4 CLASSROOMS) SCHOOL BUILDING, ITBUD INTEGRATED SCHOOL, UYUGAN, BATANES","Buildings and Facilities","Completed",10414364.55,0,100,"Batanes DEO","Region II","L.M. CANLAS CONSTRUCTION (32282)","2018-09-03","2021-06-06",2018,"Outside Infra - GAA 2018 DepEd BEFF",20.36763,121.96295,"200906000","200900000"]
SHA-256
4e19e01649b6045a697a79946de0ea921915f794c6ab6fb5bc11db07d06f0aa6

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.