Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18BI0053

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18BI0053","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOODMANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND   DRAINAGE SYSTEMS-CONSTRUCTION OF STA. CRUZ RIVER CONTROL, BARAT SECTION (PHASE 3), BAMBAN","Flood Control and Drainage","Completed",14140261.03,0,100,"Nueva Vizcaya DEO","Region II","J.E.L. CONSTRUCTION & SUPPLY (40852)","2018-03-06","2018-07-20",2018,"Regular Infra - GAA 2018 OO-2",16.36818,121.05639,"205004000","205000000"]
SHA-256
eb8b8de48811716f7c1a7bcd2b376d1efd26fcc8a724cd1c85839d1f6adb243b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.